6.3 NORTH GRID<br />

The North Grid consists of five CLNs namely, Waterberg, Rustenburg, Lowveld (northern part), Warmbad and<br />

Polokwane. The current transmission network and CLNs are shown in Figure 6.5 below.<br />

Figure 6.5: Current North Grid network and CLNs<br />

The expected peak demands by 2016 and <strong>2020</strong> and the average percentage load increase for the period for each<br />

CLN are given in Table 6 5 below.<br />

CLN<br />

Peak Load<br />

(MW) 2009<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />

Forecasted Load (MW)<br />

2016 <strong>2020</strong><br />

Ave. Annual %<br />

Load Increase<br />

Waterberg 544 1107 1443 9.78<br />

Rustenburg 1704 2438 2732 4.43<br />

Lowveld North 1456 2099 2315 4.39<br />

Warmbad 271 243 261 -0.23<br />

Polokwane 1177 1712 1808 4.16<br />

Table 6.5: North Grid CLN load forecast and percentage load increases