5. National Overview<br />
The map in Figure 5 1 below shows a high-level<br />
view of the major TDP scheme projects where the<br />
Figure 5.1: Map showing relative location of the major TDP scheme projects<br />
A summary of the major new assets that are<br />
either approved or proposed to be added to<br />
the transmission system over the next ten years<br />
are listed in Table 5.1 on the following page.<br />
relative location of the new transmission lines and the<br />
associated MTS substations are indicated schematically.<br />