5. National Overview<br />

The map in Figure 5 1 below shows a high-level<br />

view of the major TDP scheme projects where the<br />

Figure 5.1: Map showing relative location of the major TDP scheme projects<br />

A summary of the major new assets that are<br />

either approved or proposed to be added to<br />

the transmission system over the next ten years<br />

are listed in Table 5.1 on the following page.<br />

relative location of the new transmission lines and the<br />

associated MTS substations are indicated schematically.<br />

© <strong>Eskom</strong> <strong>2011</strong> 11