transformation capacity at Malelane and Marathon<br />

substations are in progress. The 400kV line projects<br />

planned to be commissioned in 2010 have not been<br />

completed.<br />

North Grid<br />

The planned Spitskop, Marang, Witkop and Spencer<br />

transformer projects for 2010/11 are completed.<br />

South Grid<br />

There were no projects planned to be commissioned<br />

in 2010/11.<br />

As shown in Table 4 1 above, the number of<br />

customer applications for grid connections processed<br />

is fairly high. Acceptance rates have increased when<br />

compared to last year. Furthermore, analysis and<br />

consultation with customers is required to understand<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />

North West Grid<br />

There were no projects planned to be commissioned<br />

in 2010/11.<br />

4.3 GRID CONNECTIONS APPLICATIONS<br />

Table 4 1 outlines the number of Indicative Quotations<br />

(IQ’s), Feasibility Quotations (FQ’s) and Budget<br />

Quotations (BQ’s) that have been processed during the<br />

period January 2010 to December 2010. These are as<br />

a result of applications for grid connections, as per the<br />

Grid Code.<br />

Grid Indicative Quotations Feasibility Quotations Budget Quotations<br />

Issued Issued Accepted Issued Accepted<br />

Central 0 8 6 4 3<br />

East 0 2 1 1 1<br />

North East 4 9 4 3 2<br />

North West 3 0 0 0 0<br />

North 2 15 5 0 0<br />

South 11 3 0 2 2<br />

West 16 3 2 3 2<br />

Total 36 40 18 13 10<br />

% Acceptance 45% 77%<br />

Table 4.1: Connection Applications Quoted and Accepted<br />

opportunities to improve this performance. There<br />

have been a high number of Indicative Quote<br />

applications (most of the 36 applications above)<br />

received to connect Renewable Energy Generation<br />

onto the <strong>Transmission</strong> Grid.