10<br />
transformation capacity at Malelane and Marathon<br />
substations are in progress. The 400kV line projects<br />
planned to be commissioned in 2010 have not been<br />
completed.<br />
North Grid<br />
The planned Spitskop, Marang, Witkop and Spencer<br />
transformer projects for 2010/11 are completed.<br />
South Grid<br />
There were no projects planned to be commissioned<br />
in 2010/11.<br />
As shown in Table 4 1 above, the number of<br />
customer applications for grid connections processed<br />
is fairly high. Acceptance rates have increased when<br />
compared to last year. Furthermore, analysis and<br />
consultation with customers is required to understand<br />
<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />
North West Grid<br />
There were no projects planned to be commissioned<br />
in 2010/11.<br />
4.3 GRID CONNECTIONS APPLICATIONS<br />
Table 4 1 outlines the number of Indicative Quotations<br />
(IQ’s), Feasibility Quotations (FQ’s) and Budget<br />
Quotations (BQ’s) that have been processed during the<br />
period January 2010 to December 2010. These are as<br />
a result of applications for grid connections, as per the<br />
Grid Code.<br />
Grid Indicative Quotations Feasibility Quotations Budget Quotations<br />
Issued Issued Accepted Issued Accepted<br />
Central 0 8 6 4 3<br />
East 0 2 1 1 1<br />
North East 4 9 4 3 2<br />
North West 3 0 0 0 0<br />
North 2 15 5 0 0<br />
South 11 3 0 2 2<br />
West 16 3 2 3 2<br />
Total 36 40 18 13 10<br />
% Acceptance 45% 77%<br />
Table 4.1: Connection Applications Quoted and Accepted<br />
opportunities to improve this performance. There<br />
have been a high number of Indicative Quote<br />
applications (most of the 36 applications above)<br />
received to connect Renewable Energy Generation<br />
onto the <strong>Transmission</strong> Grid.