2<br />

Chapter 5 deals with the national overview, which gives<br />

a high level explanation of the planned transmission<br />

infrastructure. This is intended to give a snapshot of the<br />

major projects that are planned for the entire <strong>Ten</strong>-year<br />

plan period and a high-level summary of the installed<br />

transmission infrastructure.<br />

Chapter 6 focuses on planned projects in detail and<br />

the impact they will have on the network. Generation<br />

integration and reliability projects are discussed per<br />

Grid. In both instances, sites and servitudes are required<br />

<strong>Transmission</strong> <strong>Ten</strong>-<strong>Year</strong> <strong>Plan</strong> <strong>2011</strong>-<strong>2020</strong><br />

to accommodate substations and lines respectively. In<br />

either case, the Environmental Protection Act requires<br />

<strong>Eskom</strong> to conduct an Environmental Impact Assessment<br />

(EIA) and obtain environmental approval, which includes<br />

consultation with affected stakeholders, prior to construction.<br />

Chapter 7 deals with the capital expenditure of the<br />

ten-year plan.<br />

Chapter 8 deals with various conclusions based on the<br />

content of this document.<br />

2. Load Demand Forecast and Generation Scenarios<br />

2.1 LOAD FORECAST<br />

Load forecasting is a fundamental requirement for a<br />

<strong>Transmission</strong> planning cycle. Availability of sufficient<br />

transmission network capacity in any country is<br />

important for economic growth. Grid <strong>Plan</strong>ning, in<br />

consultation with the relevant Distribution regions,<br />

compiles a forecast per point of supply for the network<br />

computer model.<br />

The geographically differentiated loads indicate that<br />

the growth rates and load profiles differ substantially<br />

from one substation or area to another. The forecast<br />

that was used for the <strong>2011</strong> – <strong>2020</strong> TDP (2010 TDP)<br />

was developed using the 2009 July System peak load.<br />

The effects of the economic crisis have resulted in a<br />

significant impact on the demand in late 2008 and early<br />

2009. Hence the load forecast presented in this report<br />

indicates relatively smaller system load demand as<br />

compared to the load forecast used in the 2010 – 2019<br />

TDP (2009 TDP). See Figure 2-1, on the next page, that<br />

illustrates the difference.<br />

Due to the long lead times and EIA requirements, the<br />

transmission planning studies were based on this load<br />

forecast to provide enough time to initiate the necessary<br />

transmission infrastructure projects. The forecasted<br />

system peak demand for each year is given in Figure 2<br />

1 on the next page including the percentage growth for<br />

each year for the latest forecast:.