Table G Freight volume, income and costs<br />
ITEM 1994/95 1995/96 1996/97 1997/98 % CHG 98/97<br />
Volume (mgtkm) 31630 31717 32621 36556 12.1<br />
Track access income (£M) 191 159 159 164 3.1<br />
Freight income (£M) 151 148 147 148 0.7<br />
Unit income (£M/000gtkm) 6.04 5.05 4.93 4.54 -7.9<br />
Unit costs (£M/000gtkm) 4.77 4.67 4.49 4.06 -9.7<br />
4. Service improvements – reduction in<br />
transit times<br />
Two years ago, nearly 90% of the trains using our network<br />
were restricted to 60mph,often because of the rolling stock.<br />
We set ourselves the target of providing up to 20 new paths<br />
at 75mph or greater a year. Since then,our customers have<br />
introduced 25 new trains at such higher speeds and we have<br />
identified a further 22 additional return paths.<br />
5. Development of freight terminals<br />
As promised, we have provided more information on how<br />
to develop terminals and to protect sites.We have acquired<br />
additional sites and introduced and updated regularly the<br />
Freight Connections Guidewith the latest edition including<br />
details of potential sites provided by local authorities.<br />
6. Piggyback project<br />
With the launch of services for Parcelforce (EWS) and<br />
Tankfreight (Freightliner),piggyback traffic is now in<br />
operation.As described, we have now started to implement<br />
a gauge enhancement programme for the widespread<br />
introduction of more higher-gauge traffic. Further<br />
development is dependent on grant funding.<br />
7. Improved project management<br />
We have met our commitments to streamline our processes<br />
for developing rail freight-related projects.We have simplified<br />
our project management requirements,opened up the<br />
market to new contractors and methods and improved<br />
accountability for delivery. Detailed market research has<br />
indicated that we have made a marked improvement in our<br />
ability to produce cost estimates more quickly and to<br />
complete projects to time and budget, but we are aware<br />
that this was from a low base and we still have room for<br />
improvement.<br />
Our project portfolio includes 346 projects for delivery over<br />
the next two years,of which 51 have been generated in the<br />
last year, compared to our target of 20.<br />
8. Open access<br />
We have had 30 enquiries from organisations who are<br />
considering entering various aspects of rail freight operations<br />
and we are continuing to work with several parties.We will<br />
continue to minimise the commercial,technical and<br />
operational barriers for new entrants.<br />
9. Systems development<br />
Most of our work is focused on the Year 2000 issue.<br />
Nevertheless, we have been able to improve our systems<br />
and operations for planning access to the network to give<br />
our customers more flexibility and shorter lead times. We<br />
have also introduced new invoicing systems and are working<br />
with EWS on its introduction of its new Train Control<br />
System to support the development of wagon-load traffic.<br />
We are now starting detailed work on improved,real-time<br />
tracking systems to monitor the location and condition of<br />
consignments using satellite tracking systems.<br />
10. Code of practice<br />
After discussion with a wide range of parties, we introduced<br />
a Code of Practice in September 1997.A review with the<br />
key industry parties a year later did not identify any<br />
necessary changes.<br />
We have met our<br />
commitments to<br />
streamline our<br />
processes for<br />
developing rail<br />
freight-related<br />
projects<br />
93