20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table C Loading gauge classification<br />

RT NOMENCLATURE UIC HEIGHT ROUTE km STATIC GAUGE MAX W9 HT MAX TRAILER HT<br />

CURRENT FUTURE EQUIVALENT CURRENT FUTURE HEIGHT ARL* WIDTH MU<strong>LT</strong>IFRET** MEGAFRET** 330MM ARL***<br />

UCI A 0 2147 3.896 2.500 2.910 3.030 3.770<br />

n/a W10w > UCI A - - 3.896 2.600 2.910 3.030 3.770<br />

n/a W11 > UCI B - - 4.130 2.500 3.140 3.260 4.000<br />

n/a W11w > UCI B - - 4.130 2.600 3.140 3.260 4.000<br />

TOTAL 16522 16559<br />

* above rail level<br />

** wagon type. Multifret @ 945mm ARL,Megafret @ 825mm ARL<br />

*** with specially adapted suspension<br />

Table D Programme for gauge enhancement<br />

ROUTE km TO W10 OR UIC A EQUIVALENT HEIGHT TO W11 OR UIC B EQUIVALENT HEIGHT<br />

Table F Potential routes for reopening<br />

KEY STRUCTURES COST TIMESCALE KEY STRUCTURES COST* TIMESCALE<br />

WCML north 522 3 1.5 1999 3 66.1 2004<br />

WCML south 120 2 0.5 1999 9 99.0 2004<br />

WCML connections 100 3 15.0 2004 3 25.5 2004<br />

Channel Tunnel London 133 4 29.0 2005 7 73.8 2005<br />

Southampton–Midlands 275 4 27.0 2004<br />

Felixstowe–Midlands 327 1 50.0 2004<br />

Cardiff–London 240 3 25.0 2005<br />

Trans-Pennine 175 6 45.0 2005<br />

TOTAL 1892 26 193.0 22 264.1<br />

* to 2.5m wide only<br />

Table E Progress with gauge enhancement during 1998<br />

<strong>The</strong> following routes have been cleared to W9 (SBI) gauge: Parkeston Quay–Forest Gate, (WCML to Mossend via Shotts and Carstairs)<br />

Newcastle–Holytown Junction via the ECML,Millerhill and Carfin,Warrington–Ditton via Widnes,Trafford Park–Allerton,(Golborne–Ordsall),<br />

Fawley–Marchwood,(Ardwick–Diggle via Guide Bridge), Peterborough–Ely, Coatbridge–Hillington,(Earlestown to Edgehill)<br />

W8 (W6A8’6”) gauge has been provided on Mossend–Grangemouth and to Kyle of Lochalsh via Inverness and Dingwall, Weston-super-Mare–Exeter,<br />

(Farringdon Curve–Clitheroe and Hall Royd Junction),Carlisle–Corkickle for certain wagons.<br />

Railtrack owned: Grimethorpe, Stirling–Cambus–Alloa–Kincardine, Caldon Low, Leamside, Claydon LNE Junction–Bletchley, Rugby–Rugby cement works,<br />

Seaham Harbour, Pensnett,Rock Ferry–Canning St,Bootle Junction–Aintree.<br />

Not Railtrack owned: Nuneaton avoiding line, Rugby cement works–Long Itchington,Dumfries–Maxwelltown,Greenock Princes Pier branch,<br />

Cambus–Menstrie, Lichfield–Walsall,Stratford–Honeybourne–Cheltenham.<br />

When we have finished<br />

this programme, at<br />

least 1,892km of the<br />

network will be<br />

available at W10 gauge<br />

91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!