developing<br />

80<br />

6.11 continued<br />

NAME ANDDESCRIPTION OF SCHEME<br />

Portsmouth area<br />

Renewal of signalling equipment<br />

North London Line<br />

Renewal of signalling equipment<br />

Colchester–Clacton<br />

Renewal of signalling equipment<br />

Larkhall–Milngavie new service<br />

Possible new train service over reopened branch line south of Hamilton providing increased frequency of<br />

service through central Glasgow to Milngavie<br />

Manchester Airport<br />

Increased capacity and multimodal interchange facilities<br />

Basingstoke–Farnborough resignalling<br />

Renewal and life extension of signalling equipment in the Basingstoke-Farnborough area<br />

Alton Line<br />

Renewal of signalling equipment<br />

Glasgow–Gourock–Weymass Bay route renewals<br />

Renewal and enhancement of infrastructure on the route, driven by the condition of signalling, overhead<br />

cables and telecoms equipment.Capacity improvements and junction rationalisation are being undertaken<br />

Colnbrook Euroterminal<br />

New rail freight facility close to Heathrow Airport<br />

Dorset coast resignalling<br />

Renewal or life extension of signalling equipment in the Bournemouth area<br />

Merseyside electrification extensions<br />

Possible extension of Merseyrail electrified networks Bidston–Woodchurch<br />

Rhymney Valley capacity enhancement<br />

Resignalling,remodelling and track improvements to improve journey times and capacity, subject to<br />

external funding.<strong>The</strong> scheme is subject evaluation<br />

Cardiff Central<br />

Major station refurbishment programme, additional platform and improvement to the station approach<br />

Tay Bridge<br />

Refurbishment to protect and capacity over the 85 individual structures which together form the Tay<br />

Bridge.We are also evaluating options for further work to enhance freight train capacity<br />

Horsham resignalling<br />

Renewal of signalling equipment<br />

Camden–Dalston<br />

Electrification scheme<br />

East Midlands Parkway Station<br />

Major new parkway station close to M1 and East Midlands Airport<br />

* Total cost including renewal and enhancement expenditure<br />

TIMESCALE<br />

2006<br />

2007<br />

2005<br />

2001<br />

2002<br />

2008<br />

2009<br />

2005<br />

2004<br />

2002<br />

2005<br />

2004<br />

1999<br />

2006<br />

2003<br />

2006<br />

2002<br />

COST (£M)*<br />

27<br />

25<br />

24<br />

24<br />

23<br />

20<br />

19<br />

19<br />

19<br />

15<br />

15<br />

14<br />

13<br />

12<br />

12<br />

12<br />

11<br />

ROUTE STRATEGY<br />

1<br />

26<br />

16<br />

39<br />

1<br />

1<br />

21<br />

39<br />

3<br />

21<br />

12<br />

28<br />

3<br />

14<br />

19<br />

26<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!