20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

outputs 5.3 continued<br />

Table H Track quality<br />

Track quality is monitored by measuring vertical and horizontal alignment over distances of 35m and 70m. We have three standards.We aim for 50% of track to meet the highest standard,90% to<br />

meet the second standard,and 100% to meet the third standard. We aim to move further towards meeting these standards.For track which does not meet the required standard, we have a<br />

programme in place for appropriate renewal and maintenance work.<strong>The</strong> targets we have included in this table are based on the maintenance and renewal expenditure set out in this NMS.<br />

100<br />

95<br />

90<br />

85<br />

80<br />

75<br />

70<br />

65<br />

60<br />

55<br />

50<br />

99 00 01 02 03 04 05 06 07 08 09<br />

100<br />

95<br />

90<br />

85<br />

80<br />

75<br />

70<br />

65<br />

60<br />

55<br />

50<br />

99 00 01 02 03 04 05 06 07 08 09<br />

54<br />

35m rail top profile 35m rail track alignment<br />

100<br />

70m rail top profile 70m rail track alignment<br />

100<br />

<strong>The</strong> area below each line shows the proportion of track on our network that meets the relevant standard.<br />

100%<br />

90%<br />

50%<br />

95<br />

90<br />

85<br />

80<br />

75<br />

70<br />

65<br />

60<br />

55<br />

50<br />

95<br />

90<br />

85<br />

80<br />

75<br />

70<br />

65<br />

60<br />

55<br />

50<br />

99 00 01 02 03 04 05 06 07 08 09<br />

99 00 01 02 03 04 05 06 07 08 09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!