20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A Delays to train services<br />

RAI<strong>LT</strong>R<strong>AC</strong>K-CAUSED DELAYS (PER TRAIN MOVEMENT) 1997/98 (<strong>AC</strong>TUAL) 1998/99 (FORECAST) 1999/2000 2000/01 2001/02–2005/06 2006/07–2008/09<br />

Causes of passenger train cancellations due to<br />

maintenance and renewal activities<br />

This represents 0.3% of scheduled train movements<br />

Power supply 9%<br />

E x t e rnal causes 16%<br />

Control systems 22%<br />

I n f ra s t ructure 53%<br />

(SECONDS) (SECONDS) (TARGET*) (TARGET*) (TARGET*) (FORECAST*)<br />

Passenger trains 70 68 -7.5% -5.0% -2.5% -2.0%<br />

Freight trains 285 239 -7.5% -5.0% -2.5% -2.0%<br />

Average delay 85 80 -7.5% -5.0% -2.5% -2.0%<br />

RAI<strong>LT</strong>R<strong>AC</strong>K DELAYS BY CAUSE (PER TRAIN MOVEMENT)<br />

Infrastructure (track & structures) 35 34 -9.0% -6.0% n/a n/a<br />

Power supply 3 2 -9.0% -6.0% n/a n/a<br />

Control system failures 18 16 -8.5% -5.5% n/a n/a<br />

Other external (eg vandalism) 6 5 -6.5% -4.5% n/a n/a<br />

Maintenance & renewal-related causes 62 58 -8.6% -5.7% n/a n/a<br />

Other Railtrack causes 23 22 -4.5% -3.0% n/a n/a<br />

Total Railtrack delays 85 80 -7.5% -5.0% -2.5% -2.0%<br />

* compound annual growth rate<br />

Notes:<br />

1 .<strong>The</strong> above delay seconds per train movement are based on all delays recorded for attri bu t i o n ,divided by total train move m e n t s .<strong>The</strong> delay data diffe rs from that used to calculate the 1998<br />

NMS fi g u r e s , which excluded those delays recorded for attri bution of fe wer than three minu t e s .<br />

2. <strong>The</strong> 1997/98 figures above reflect the actual delay and train movement data and updates the forecasts used in the 1998 NMS.<br />

Causes of freight train cancellations due to<br />

maintenance and renewal activities<br />

This represents 0.2% of scheduled train movements<br />

I n f ra s t ructure 91%<br />

Control systems 5%<br />

Power supply 3%<br />

E x t e rnal causes 1%<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!