outputs<br />
5.1<br />
We are planning<br />
to deliver further<br />
improvements of<br />
2.5% per year in<br />
delays per train<br />
movement for<br />
2001/02–2005/06<br />
5.1 Performance and reliability<br />
Since 1995/96, the year prior to flotation, we have<br />
reduced the total direct delays that we cause to<br />
o p e ra t o rs ’t rains by over 40%, despite an increase<br />
in train movements of around 10% over this<br />
p e ri o d .<br />
48<br />
At the start of 1998, we embarked on a new<br />
phase of our perfo rmance management including<br />
rigorous new continuous improvement processes.<br />
This approach focuses on an enhanced<br />
u n d e rstanding of the root causes of delay, d own to<br />
individual asset and component leve l , and the<br />
i d e n t i fication of the critical locations and ‘ g o l d e n<br />
a s s e t s ’where improved infra s t ructure reliability is<br />
p a rt i c u l a rly import a n t .Such analysis allow s<br />
p ri o ritisation of improvement projects to these<br />
locations and assets.<br />
O ver the past ye a r, this approach has been<br />
bolstered by our Process for Pe r fo rm a n c e<br />
I m p r ove m e n t ,creating accountability for delay s<br />
across the operational management of the<br />
c o m p a ny. Local managers are invo l ved in genera t i n g<br />
i n i t i a t i ves to reduce delay s , and hold ‘ bu d g e t s ’o f<br />
i m p r ovements for which they are held accountabl e.<br />
Local Area Delive ry Groups have been establ i s h e d<br />
as cross-functional teams with access to inve s t m e n t<br />
funds and to a current best-practice toolkit of<br />
t e c h n i q u e s .Across the company, m a n a g e rs seek to<br />
wo rk closely with all of our customers and<br />
s u p p l i e rs to ensure close co-operation on the<br />
selection and delive ry of initiative s .<br />
We have completed the second year of this<br />
p e r fo rmance budgeting process, and signifi c a n t<br />
enhancements are in place to both processes and<br />
the supporting info rmation systems.<br />
<strong>The</strong> success of this initiative in 1998/99 has<br />
c o n t ri buted to an expected ove rall improve m e n t<br />
of around 7% in the delay per train move m e n t<br />
a t t ri bu t a ble to factors within our control.This has<br />
b e n e fited both passenger services and freight,<br />
although the improvement for the latter was<br />
p a rt i c u l a rly marke d .<strong>The</strong> last year would have seen<br />
a larger improvement in perfo rmance had it not<br />
been one of the wo rst ye a rs for flooding in some<br />
p a rts of the country.This has occurred despite<br />
f a s t e r-than-expected growth in train kilometres<br />
although this growth also caused us to fall short of<br />
some of our track asset condition measures<br />
forecast over the past ye a r.<br />
More recently, we played our part in<br />
establishing the National Performance Task Force,<br />
which works on cross-industry initiatives with<br />
train operators to find joint solutions to some of<br />
the complex problems on the network. We have<br />
taken the lead on the transfer of industry best<br />
practice, on the identification of national delay<br />
‘hot spots’,and in working with train operators<br />
to build enhanced recovery plans to mitigate the<br />
impact of major incidents.<br />
On 15 January, we published our new<br />
targets of a further 7.5% improvement in delays<br />
per train movement for 1999/2000 with a further<br />
5% reduction planned for the following year<br />
(see Table A).<br />
We are planning to deliver furt h e r<br />
i m p r ovements of 2.5% per year in delays per tra i n<br />
m ovement for the ye a rs 2001/02–2005/06.W h i l e<br />
some of these improvements can be achieved from<br />
p u rsuing continuous improvement in our planning<br />
and operation of the netwo rk , these targets will<br />
also require a significant contri bution from our<br />
maintenance contra c t o rs .We have already set<br />
enhanced targets for perfo rmance improvement in<br />
the maintenance contracts recently let, and will be<br />
discussing similar improvements with bidders fo r<br />
c o n t racts being let over the next two ye a rs .<br />
With some parts of the netwo rk operating at<br />
close to full capacity, each additional tra i n<br />
m ovement can lead to a disproport i o n a t e ly larg e<br />
impact on delay s .<strong>The</strong> actual impact on ave ra g e<br />
d e l ays to trains will depend on the location and<br />
nature of this growth and our ability to put in place<br />
additional route capacity to enhance the robu s t n e s s<br />
of the netwo rk .<br />
Future growth in the level of train move m e n t s<br />
represents a significant influence on ove ra l l<br />
p e r fo rm a n c e, and we support the principle of<br />
enhanced train services both in terms of frequency<br />
and reliability.<br />
Building on our recognised success in<br />
performance improvement, we are committed to<br />
playing our part, working closely with industr y<br />
partners,in delivering a high-quality railway<br />
service for the future.<br />
<strong>The</strong> Franchising Director has requested that<br />
we look at the potential for an improvement of 5%<br />
per year in delays per train movement for the<br />
ye a rs 2001/02–2005/06. Our initial view is that we<br />
would be prepared to commit to agreed<br />
p e r fo rmance levels on a route-by-route basis,<br />
although this may well require additional funding,<br />
which we will discuss with the Franchising Director<br />
in the coming months.