20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P<br />

Q<br />

R<br />

S<br />

pinchpoint A location on the network where the number of train movements is close to, or projected<br />

to exceed, the capacity of that location (same as bottleneck)<br />

PIXC Passengers in excess of capacity. <strong>The</strong> Franchising Director’s measure of overcrowding on train<br />

services.<br />

PPP Private–public partnership<br />

Project Elephant Project to assess feasibility and costs of increasing freight vehicle loads and axle weights<br />

PSB Power signal box<br />

PTA Passenger Transport Authority<br />

PTE Passenger Transport Executive<br />

PUG Passenger Upgrade<br />

PUG 1 Passenger Upgrade No.1 – agreement with the Franchising Director and WCML<br />

PUG 2 Passenger Upgrade No.2 – agreement with Virgin Trains for the capacity and capability of<br />

WCML and revenue-sharing arrangements<br />

Q-Train Special train run randomly to catch trespassers on railway lines<br />

RA Route availability – RA1–6 up to 20.3 tonnes; RA7–9 up to 23.4.1t; RA10 up to 25.4t<br />

RA C Royal Automobile Club<br />

radio-electronic token-block A radio based signalling system used on some rural, single track railways<br />

reactionary dela y A late train delays other trains<br />

RGS Railway Group Standards<br />

RHA Road Haulage Association<br />

ROSS Renewal of Scottish signalling<br />

RPI-X formula This is the formula often used by Regulators to determine how the charges of a company will<br />

RPL Rail Property Ltd<br />

RSAB Rolling Stock Acceptance Board<br />

RTCS Railtrack Train Control System<br />

vary over time. It is the Retail Price Index less a percentage eg RPI=3% less X of 1% means<br />

that the maximum price rise that the company can levy in any one year is 2%<br />

RTIA contracts Contract between Railtrack and its maintenance contractors<br />

RTS Rapid transit system<br />

RUCC Rail Users’ Consultative Committee<br />

Rules of Route Agreement between Railtrack and train operators as to when lines can be temporarily closed<br />

for maintenance and renewal work<br />

Safety Case <strong>The</strong> documentation and systems by which all parts of the railway industry set out how they<br />

SB Signal box<br />

will manage the safety of their activities<br />

SBI gaug e Loading gauge which permits operation of road–rail Swap-body vehicles<br />

SCAD A Supervisory control and data acquisition<br />

S&CL Settle and Carlisle Line<br />

Section 54 agreement Agreement with the Franchising Director over form/content of a future franchise<br />

Section 54 Suppor t Enables the Franchising Director to give an undertaking on how he will exercise his franchising<br />

function in the future<br />

SE<strong>LT</strong>RANS South East London Transport Strategy<br />

shoulder peak services Train service timetable immediately before and immediately after the ‘peak’ period of<br />

maximum train services<br />

SHR T South Hampshire Rapid Transit<br />

skip-stopping Not stopping at all intermediate stations between two main stations<br />

347

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!