20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

45<br />

Freight-only routes SCOTLAND ZONE<br />

DRS; EWS; Freightliner.<br />

Route characteristics<br />

DESCRIPTION This route is a diverse mixture of running lines and branches,<br />

some of which are not in use. Apart from double track in the Millerhill<br />

Yard/South Suburban Complex, the route is primarily single track. Running lines<br />

account for 27% of the route, split approximately 40% double track and 60%<br />

single track. Maximum linespeeds range from 5–60mph according to line. <strong>The</strong><br />

branches are single track with lengths ranging from 1–20km in length and with<br />

maximum speeds from 5–45mph.<br />

Route vision<br />

Our vision is of the freight renaissance within Scotland continuing in line with the<br />

growth forecasts being made by DRS, EWS and Freightliner who have recently<br />

commenced operations to Torness and Hunterston.<br />

All of our customers require the provision to operate more trains with<br />

improved pathing arrangements. <strong>The</strong>y also require improved access to operate<br />

larger, heavier and longer trains. Both EWS and their customers are seeking to<br />

reopen disused sidings and provide suitable loading facilities as well as being<br />

involved in the construction of new loading/unloading facilities. We have taken<br />

forward the customers’ proposals and will carry out implementation works at<br />

locations when agreements have been reached with all relevant parties. We<br />

accept these requirements and are working with all parties to grow the business.<br />

<strong>The</strong>se are the route improvements we plan to deliver<br />

<strong>The</strong> lines from Monktonhall Junction to Portobello Junction via Millerhill Yard and<br />

between Whifflet and Sunnyside are electrified with 25kV OLE. Signalling is a<br />

mixture of semaphore, colour-light and various token arrangements controlled<br />

from five signalling centres and nine other signal boxes.<br />

CAP<strong>AC</strong>ITY CHANGES TO MEET FRANCHISING DIRECTOR, PTE AND CUSTOMER REQUIREMENTS AND DELIVER ROUTE VISION<br />

LOCATION PROPOSEDSOLUTION YEAR REF<br />

Various new freight sidings and loading points Track & associated signalling as necessar y Ongoing<br />

CAPABILITY CHANGES TO <strong>AC</strong>HIEVE ROUTE VISION<br />

LINESPEEDS (km of track) km STOPS CURRENT POSITION 2001 POSITION SUSTAINING THE ROUTE <strong>AC</strong>HIEVING ROUTE VISION<br />

Up to 35mph 174 174 174 179<br />

40–75mph 48 48 48 56<br />

80–105mph 0 0 0 0<br />

110–125mph 0 0 0 0<br />

Over 125mph 0 0 0 0<br />

TOTAL 222 222 222 235<br />

GAUGE (km of route)<br />

W6A 193 193 193 206<br />

W7 193 193 193 206<br />

W8 34 34 34 47<br />

W9 3 3 3 19<br />

W10 0 0 0 0<br />

AXLE WEIGHT (km of track)<br />

We are actively working towards updating the East Coast Main Line and Shotts<br />

routes to increase capability to W10 gauge. We have put in place the facility to<br />

carry refrigerated traffic between Mossend and Inverness and on to Thurso<br />

enabling substantial volumes of traffic to be transferred from road to rail.<br />

With increasing freight volumes and services, coupled with a raised interest<br />

by road hauliers in rail options, network accessibility is becoming a key objective.<br />

We will continue to reopen mothballed sidings and provide new connections and<br />

loading points wherever these are commercially viable. We are endeavouring to<br />

provide innovative solutions to meet customers’ needs whether they are for<br />

short- or long-term duration, while promoting 24-hour access to the network.<br />

Up to 20.3 tonnes 37 37 37 37<br />

20.4 tonnes to 23.4 tonnes 82 82 82 82<br />

23.5 tonnes to 25.4 tonnes 103 103 103 116<br />

TOTAL 222 222 222 235<br />

335

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!