Freight-only routes NORTHERN ENGLAND continued<br />

Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />

PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />

LONDON NORTH EASTERN ZONE<br />

Track 1.7 2.1 1.6 10.2<br />

Structures 0.6 0.4 0.2 3.8<br />

Signalling 0.0 0.0 0.0 0.0<br />

TOTAL EXPENDITURE 2.3 2.5 1.8 14.0<br />

NORTH WEST ZONE<br />

Track 0.7 0.9 0.8 3.8<br />

Structures 0.0 0.6 0.1 0.5<br />

Signalling 0.0 0.1 0.5 3.8<br />

Plant & Machinery 0.2 0.0 0.0 0.0<br />

TOTAL EXPENDITURE 0.9 1.6 1.4 8.1<br />

Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />

PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />

PARTNERSHIP<br />

North Trans-Pennine gauge enhancement 2005 0.0 0.0 0.0 2.0 1<br />

CONTR<strong>AC</strong>TOR<br />

Freight Buxton 2001 0.0 0.7 0.6 0.0<br />

THIRD PARTY<br />

Hillhead Quarry new connection 2000 0.0 0.5 0.0 0.0<br />

Other schemes Various 0.3 0.0 0.0 0.0 4<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.0 0.7 0.6 0.0 5<br />

TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.3 0.5 0.0 2.0<br />

Progress on the 1998 NMS<br />

We have worked with H J Banks to reopen a coal-handling siding at Renishaw<br />

Park, and with British Steel and Associated British Ports to improve capacity at<br />

the Immingham Bulk Terminal. In addition, EWS, Avesta Sheffield and Railtrack<br />

have collaborated on a scheme at Tinsley to allow the expansion of the works<br />

and improve the potential for future traffic growth.<br />

Feasibility work to extend the run-round loop at Buxton has been<br />

completed but implementation of the proposal is dependent on the identification<br />

of future traffic requirements. Reinstatement of the Olive Mount Chord Line to<br />

provide direct access to the Bootle Branch has been the subject of detailed<br />

feasibility work; this will be kept under review as changing traffic flows to<br />

Liverpool Docks emerge.<br />