Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />

PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />

Track 1.6 2.8 2.3 9.8<br />

Structures 1.7 1.0 0.5 3.9<br />

Signalling 0.5 1.7 0.6 2.8<br />

Electrification 0.3 1.4 1.4 3.7<br />

Plant & Machinery 0.1 0.0 0.0 0.0<br />

Telecoms 0.5 1.4 0.8 4.5<br />

Stations 0.6 15.7 8.5 0.0<br />

TOTAL EXPENDITURE 5.3 24.0 14.1 24.7<br />

Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />

PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />

COMMITTED<br />

Mersey Tunnel drainage 2000 2.5 0.1 0.0 0.0<br />

Bootle New Strand Station refurbishment (E) 1999 2.6 0.0 0.0 0.0<br />

Station enhancements 2001 0.0 0.5 0.2 0.0<br />

Allerton Interchange (see Route 1) (E) 2001 0.0 0.0 0.0 0.0 1<br />

PARTNERSHIP<br />

North Trans-Pennine gauge enhancement 2005 0.0 0.0 0.0 1.9 1<br />

Merseyside 75mph services 2002 0.0 0.0 0.0 1.0 1<br />

CONTR<strong>AC</strong>TOR<br />

Liverpool Underground Station enhancements (E) 2001 0.0 12.3 7.0 0.0<br />

FEASIBILITY<br />

Merseyside park and ride 2002 0.0 0.0 0.0 1.0 1<br />

THIRD PARTY<br />

New stations & major refurbishments 2001 0.0 2.2 2.7 0.0 1<br />

Maghull car-park & station enhancements 1999 0.7 0.0 0.0 0.0<br />

Other schemes Various 0.2 0.0 0.0 0.0 31<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 3.1 12.9 7.2 1.0 36<br />

TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 2.9 2.2 2.7 2.9<br />

Progress on the 1998 NMS<br />

We have continued our investment in infrastructure renewals and improvements,<br />

and in doing so helped Merseyrail Electrics achieve a very high level of service,<br />

punctuality and reliability in 1998. This work has included the replacement of rail<br />

fastenings, which will directly improve the infrastructure within the loop section<br />

and 13km of conductor rail, which will improve the reliability of the network.<br />

Enhancement works to electrify the bay platform at Hooton will be<br />

completed by the end of April this year. This will offer improved operational<br />

flexibility at this location. Work to refurbish Bootle New Strand Station is also<br />

approaching completion, supported by Merseytravel, Bootle Maritime City<br />

Challenge and EU funds.<br />

NEW STATIONS During 1998/99 new stations were successfully opened at<br />

Conway Park and at Brunswick, funded by Merseytravel with EU assistance.<br />

AIR CONDITIONING IN LINESIDE BUILDINGS A programme of work to install<br />

air conditioning units into various relocatable equipment buildings throughout the<br />

electrified network is close to completion. This will improve performance of the<br />

signalling and telecoms equipment, preventing failure due to overheating during<br />

the summer months.<br />

TUNNEL DRAINAGE A highly successful drainage scheme was completed during<br />

the year, which incorporated additional tunnel pumps and equipment to<br />

monitor the water levels. As a consequence of the successful targeting of these<br />

works, there has been a notable fall in the water levels, with a consequent<br />

improvement in train performance, and reliability, as well as increasing the lifespan<br />

of the present infrastructure.<br />

OLIVEMOUNT SIGNALLING EQUIPMENT RENEWAL This scheme has<br />

improved capacity between Edge Hill and Huyton.<br />

C D<br />

MERSEYSIDE LOOP/LINK AXLE COUNTERS <strong>The</strong> programme for replacing<br />

track circuits with axle-counters has been extended. <strong>The</strong>re has been a significant<br />

performance benefit from the work undertaken in previous phases in the James<br />

Street area. It is anticipated that this programme will be completed by the end of<br />

June and will offer further significant improvements in infrastructure reliability.<br />

STATION REGENERATION PROGRAMME This has taken full advantage of joint<br />

initiatives with Merseytravel, combining station regeneration with new station<br />

works, which has resulted in maximum benefit to the network. Work to<br />

completely refurbish all 33 of the escalators at the underground stations was<br />

completed by the end of 1998, and further major mechanical and electrical<br />

works are programmed.<br />

Phase 1 of the Southport Station regeneration is complete, with further<br />

work on the station roof now being evaluated.<br />

L<br />

H<br />

G<br />

A<br />

K<br />

B<br />

J<br />

F<br />

E<br />

289

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!