Progress on the 1998 NMS<br />

RENEWALS We have carried out £2.3M of major maintenance on Cockett and<br />

Sugar Loaf tunnels. Telephones at two level crossings have been renewed with<br />

improved equipment giving safety benefit. Further renewals are planned over the<br />

next three years.<br />

SIGNALLING 17 signals have been converted from oil to electric lighting, giving<br />

better reliability.<br />

STATIONS SRP has been completed at 27 stations as planned.<br />