20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Route characteristics<br />

DESCRIPTION This route runs from Fenchurch Street to Shoeburyness, with a<br />

loop running between Barking and Pitsea via Tilbury. It is two track with a singletrack<br />

line connecting Chafford Hundred Station (close to the Lakeside shopping<br />

Route vision<br />

Our vision is to develop a high-quality, safe and reliable service, which sets worldclass<br />

standards of excellence for a community regional passenger railway. At the<br />

same time, we will work with freight customers to develop the potential for<br />

extra freight on rail which the North Thameside area provides. This builds upon<br />

the major route modernisation completed in 1997 which invested over £150M<br />

to transform an ageing infrastructure and create one of our most modern and<br />

reliable routes.<br />

We are also working with <strong>LT</strong>S Rail to look at reducing journey times<br />

<strong>The</strong>se are the route improvements we plan to deliver<br />

complex) with Upminster and Grays on the Tilbury Loop. <strong>The</strong> maximum speed<br />

is 75mph on the main line.<br />

<strong>The</strong> route is electrified throughout.<br />

between Fenchurch Street and Upminster.<br />

Demand is led by central London commuting which is expected to continue<br />

growing strongly, although largely within the capability of existing services. <strong>LT</strong>S<br />

Rail is also keen to develop leisure use of the railway, especially at weekends and<br />

to the Lakeside shopping centre.<br />

We are investing £750,000 to improve passenger safety and security at <strong>LT</strong>S<br />

Rail stations, and will continue to improve car parking. We are assessing freight<br />

terminal and capacity requirements as part of our strategy for the route.<br />

CAP<strong>AC</strong>ITY CHANGES TO MEET FRANCHISING DIRECTOR, PTE AND CUSTOMER REQUIREMENTS AND DELIVER ROUTE VISION<br />

LOCATION PROPOSED SOLUTION YEAR REF<br />

London, Tilbury and Southend None required<br />

CAPABILITY CHANGES TO <strong>AC</strong>HIEVE ROUTE VISION<br />

JOURNEY TIMES km STOPS CURRENT POSITION 2001 POSITION SUSTAINING THE ROUTE <strong>AC</strong>HIEVING ROUTE VISION<br />

London Fenchurch Street–Barking 12 1 38mph (12min) No change No change 45mph (10min)<br />

London Fenchurch Street–Basildon 39 3 49mph (30min) No change No change 55mph (27min)<br />

London Fenchurch Street–Southend Central 58 6 46mph (47min) No change No change 50mph (44min)<br />

London Fenchurch Street–Chafford Hundred 32 4 39mph (31min) No change No change 44mph (28min)<br />

LINESPEEDS (km of track)<br />

Up to 35mph 4 4 4 4<br />

40–75mph 216 214 214 214<br />

80–105mph 0 2 2 2<br />

110–125mph 0 0 0 0<br />

Over 125mph 0 0 0 0<br />

TOTAL 220 220 220 220<br />

GAUGE (km of route)<br />

W6A 115 115 115 115<br />

W7 102 102 102 102<br />

W8 102 102 102 102<br />

W9 19 19 19 19<br />

W10 0 0 0 0<br />

AXLE WEIGHT (km of track)<br />

Up to 20.3 tonnes 11 11 11 11<br />

20.4 tonnes to 23.4 tonnes 209 209 209 209<br />

23.5 tonnes to 25.4 tonnes 0 0 0 0<br />

TOTAL 220 220 220 220<br />

225

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!