Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />

PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />

Track 5.8 9.3 8.3 40.4<br />

Structures 3.8 2.2 2.3 23.0<br />

Signalling 3.7 6.8 18.7 57.0<br />

Electrification 0.0 1.1 7.2 17.8<br />

Plant & Machinery 0.1 0.1 0.1 0.0<br />

Telecoms 0.4 2.5 3.9 11.7<br />

Stations 5.2 5.7 5.3 6.9<br />

Depots 0.3 0.7 0.1 0.5<br />

TOTAL EXPENDITURE 19.3 28.4 45.9 157.3<br />

Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />

PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />

COMMITTED<br />

Thameslink 2000 2006 0.1 0.4 0.0 7.4<br />

WAGN stations 2001 1.8 1.6 1.3 0.0<br />

COMMERCIAL<br />

WARM 2004 0.8 2.5 17.7 92.1 1<br />

Stansted Airport capacity 2004 0.0 0.0 0.0 14.0 1<br />

Hitchin–Cambridge linespeed increase 2000 0.0 0.4 0.0 0.0 1<br />

CONTR<strong>AC</strong>TOR<br />

Station and car-park improvements 2001 0.0 1.0 0.2 0.0 1<br />

Bishops Stortford Station car-park extension 2001 0.0 0.0 0.3 0.0 1<br />

Other schemes Various 0.5 6.6 2.8 7.0 32<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 3.2 8.4 19.7 107.5 37<br />

TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.0 4.1 2.6 13.0<br />

Progress on the 1998 NMS<br />

SIGNALLING RENEWALS PROPOSALS BETWEEN ELY–NORWICH AND<br />

ELY–PETERBOROUGH We have completed studies of asset conditions and are<br />

developing a programme of future renewals.<br />

STATION REGENERATION PROGRAMME We will have completed work to 20<br />

stations in 1998/99, and plan to finish the rest by March 2001.<br />

GAUGE ENHANCEMENT EVALUATION IPSWICH–ELY–PETERBOROUGH We<br />

are assessing increasing the gauge on these routes to provide an alternative route<br />

from Felixstowe to the Midlands and beyond. We will make a decision by July<br />

this year as part of our overall freight routeing strategy development.<br />

DISABLED <strong>AC</strong>CESS AT STATIONS We have provided access to two more<br />

stations, Cheshunt and at Bishops Stortford, where new lifts have been installed<br />

in partnership with WAGN, Hertfordshire and Essex County Councils.<br />

LINESPEED IMPROVEMENT HITCHIN–CAMBRIDGE Work will be complete this<br />

year with the resulting journey-time saving built into the winter timetable.<br />