Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />

PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />

LONDON NORTH EASTERN ZONE<br />

COMMITTED<br />

Station enhancements 2001 3.3 0.1 0.0 0.0<br />

Whitwell reconnection of freight facilities (E) 2000 0.0 0.9 0.0 0.0<br />

PARTNERSHIP<br />

Sheffield Corridor capacity 2006 0.0 0.0 0.0 5.0 1<br />

Sheffield–Cleethorpes linespeed improvement 2002 0.0 0.0 0.0 2.5 1<br />

CONTR<strong>AC</strong>TOR<br />

Sheffield Station additional car parking 2001 0.0 0.0 0.0 0.8 1<br />

THIRD PARTY<br />

Millhouses new station (E) 2001 0.0 0.7 0.0 0.0 1<br />

Other schemes Various 0.5 0.2 0.0 0.0 11<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 3.3 0.6 0.0 8.1 15<br />

TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.5 1.3 0.0 0.2<br />

NORTH WEST ZONE<br />

Other schemes Various 0.0 0.0 0.0 0.0 1<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.0 0.0 0.0 0.0 1<br />

Progress on the 1998 NMS<br />

CAP<strong>AC</strong>ITY We have completed the work to extend the Robin Hood services<br />

connecting Worksop–Nottingham via Mansfield (see also Route 31). We have<br />

eliminated some long-standing speed restrictions typically caused by mining<br />

subsidence in order to lift the linespeed and give improved journey times to<br />

these local communities.<br />

Our analysis of the requirements for passing loops on the Hope Valley has<br />

shown that the current network can sustain the envisaged growth in the<br />

immediate future. Similarly, the existing signalling system can support the current<br />

network for some years to come.<br />

Increased use has been made of the Barnetby–Gainsborough Line to<br />

reduce delays to freight trains and improve performance on the<br />

Doncaster–Immingham route.<br />

PERFORMANCE We have installed axle-counters to replace track circuit<br />

activated signalling in the two-mile Disley Tunnel to improve the reliability of the<br />

signalling system and therefore the performance of train services on this route.<br />

We have installed low friction equipment on point mechanisms to improve<br />

the performance of junctions, especially targeting those which suffer coal or sand<br />

contamination. Dedicated junction care teams have focused on improving the<br />

reliability of particular locations using a combination of advanced fault analysis,<br />

regular heavy maintenance attention, new specialised equipment and additional<br />

renewals.<br />

Bridge improvements undertaken at Althorpe near Scunthorpe have<br />

improved ride quality and performance on the route and have reduced journey<br />

times. Work to replace the waybeams on the King George V swing bridge at<br />

Keadby has improved performance not only on the railway but also for canal<br />

users.<br />

LINESPEED We are still exploring the difficult operational arrangements, which<br />

have to date frustrated the early delivery of linespeed improvements between<br />

Hazel Grove and Stockport.<br />

A significant workload of track work has been completed to remove<br />

numerous long-standing speed restrictions along the Humber Estuary from<br />

Immingham to Doncaster, improving performance.<br />

FREIGHT Freight train gauge improvements between Doncaster, Immingham,<br />

Goole and Hull are part of the Trans-Pennine high-gauge feasibility study being<br />

conducted this year (see Route 8). We have also completed work at New<br />

Holland to enable new freight services to be operated.<br />

STATIONS Improved access for disabled passengers has been implemented at<br />

Hope Station in partnership with Derbyshire County Council. A further scheme<br />

is being undertaken at Bamford. Regeneration work on the other stations in the<br />

Hope Valley will start this summer and will address items such as platform<br />

resurfacing, construction of new waiting shelters and improvements in lighting.<br />

Further partnership schemes with Derbyshire County Council are planned for<br />

1999/2000.<br />

A new footbridge linking the station to the local Earth Centre is under<br />

construction at Conisborough. This will improve access to both locations.<br />

Regeneration work on the station at Cleethorpes is complete. <strong>The</strong> stations<br />

at Grimsby and Goole will start later this year; work is currently in hand at<br />

Sheffield and Doncaster. At many stations, improved facilities have included better<br />

platform surface and drainage, as well as tactile paving and better lighting which<br />

will benefit station users. Regeneration work has been carried out at the small<br />

train maintenance depot at Cleethorpes.<br />

SIGNALLING WORK A major resignalling scheme at Worksop has been<br />

completed, and has led to improved train punctuality.<br />

TR<strong>AC</strong>K AND STRUCTURES A programme of track, bridge and embankment<br />

works between Doncaster and Grimsby has been completed and long-standing<br />

temporary speed restrictions removed. This is a particularly difficult section of<br />

track to maintain because of the substrata on which it lies – the result has been a<br />

major improvement to train punctuality along this part of the route. We have<br />

also completed renewal and enhancement work at the important junction at<br />

Brocklesby. This junction serves the heavily used freight link between the docks at<br />

Immingham and the steel mills at Scunthorpe, and has led to a much-improved<br />

infrastructure for the freight operators. This has enabled our customers to offer<br />

improved journey times and improved route performance.<br />

E<br />

A<br />

F<br />

G<br />

209