Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />

PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />

Track 13.8 3.8 8.1 75.9<br />

Structures 1.6 3.2 4.0 22.3<br />

Signalling 2.4 4.2 9.3 161.7<br />

Electrification 0.7 1.0 1.2 10.9<br />

Plant & Machinery 0.6 0.2 0.3 1.3<br />

Telecoms 1.5 2.6 3.4 4.2<br />

Stations 6.2 11.3 9.3 35.1<br />

Depots 1.8 0.2 0.1 5.0<br />

Other 0.1 0.2 0.2 1.1<br />

TOTAL EXPENDITURE 28.7 26.7 35.9 317.5<br />

Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />

PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />

COMMITTED<br />

Thameslink 2000 2006 5.7 4.5 0.7 281.7 1<br />

London Bridge Station enhancements 2006 0.0 0.5 0.9 3.5<br />

Station and depot enhancements 2001 1.3 1.5 2.0 0.0<br />

Charing Cross Station enhancements 2000 1.3 0.1 0.0 0.0<br />

COMMERCIAL<br />

Waterloo–Fawkham Junction enhancements for CTRL 2003 0.2 3.0 6.7 25.4 3<br />

CSE Networker regenerative braking system 2000 0.4 0.2 0.0 0.0<br />

PARTNERSHIP<br />

Class 375 & Class 365 route clearance 2000 0.7 1.0 0.5 0.0 3<br />

Ashford Depot improvements 2000 0.0 0.6 0.0 0.0 1<br />

CONTR<strong>AC</strong>TOR<br />

Connex car parks 2001 0.0 0.5 0.5 0.0 1<br />

London Bridge Station automatic ticket gates 2000 0.0 0.5 0.0 0.0 1<br />

Other schemes Various 0.7 0.0 0.0 1.0 21<br />

TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 10.1 12.4 11.3 311.6 31<br />

TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.2 0.0 0.0 0.0<br />

Progress on the 1998 NMS<br />

STATIONS During 1998, major works have been completed at Folkestone<br />

Central including track and platform rationalisation, and refurbishment of the<br />

station with new lifts and facilities to meet standards for mobility-impaired access.<br />

Discussions are under way with the local authority and Connex for<br />

improvements to the station facilities at Tonbridge. Planning permission has been<br />

sought for a redevelopment of Bromley South Station.<br />

SRP work has been completed at Eynsford, Shoreham, Otford, Bat and Ball,<br />

Sevenoaks, Maidstone East, Bearsted, Hollingbourne, Harrietsham, Lenham and<br />

Charing.<br />

It is proposed to enlarge and improve car park three at Sevenoaks and<br />

make improvements to the station forecourt to improve interchange. Customerinformation<br />

systems at all Connex franchised stations are being replaced and<br />

significantly improved through a Railtrack and Connex partnership scheme.<br />

SIGNALLING EQUIPMENT RENEWAL <strong>The</strong> renewal of signalling equipment in<br />

the Dover area was completed in 1998. Following the completion of signalling<br />

condition assessments, we intend to undertake signalling equipment renewal in<br />

the Hither Green area by 2001.<br />

LINESPEED IMPROVEMENTS <strong>The</strong> opening of CTRL Section 1 will enable<br />

journey-time improvements for domestic services on existing lines. Elsewhere on<br />

the route, an initial linespeed improvement feasibility study is complete and<br />

priority routes have been identified. Action will be taken where meaningful<br />

journey-time reductions can be realised. Feasibility work is continuing for other<br />

sections of the route. Further work will take place this year to determine<br />

whether additional journey-time reductions can be achieved with new rolling<br />

stock.<br />

B<br />