Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />
PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />
Track 13.8 3.8 8.1 75.9<br />
Structures 1.6 3.2 4.0 22.3<br />
Signalling 2.4 4.2 9.3 161.7<br />
Electrification 0.7 1.0 1.2 10.9<br />
Plant & Machinery 0.6 0.2 0.3 1.3<br />
Telecoms 1.5 2.6 3.4 4.2<br />
Stations 6.2 11.3 9.3 35.1<br />
Depots 1.8 0.2 0.1 5.0<br />
Other 0.1 0.2 0.2 1.1<br />
TOTAL EXPENDITURE 28.7 26.7 35.9 317.5<br />
Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />
PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />
COMMITTED<br />
Thameslink 2000 2006 5.7 4.5 0.7 281.7 1<br />
London Bridge Station enhancements 2006 0.0 0.5 0.9 3.5<br />
Station and depot enhancements 2001 1.3 1.5 2.0 0.0<br />
Charing Cross Station enhancements 2000 1.3 0.1 0.0 0.0<br />
COMMERCIAL<br />
Waterloo–Fawkham Junction enhancements for CTRL 2003 0.2 3.0 6.7 25.4 3<br />
CSE Networker regenerative braking system 2000 0.4 0.2 0.0 0.0<br />
PARTNERSHIP<br />
Class 375 & Class 365 route clearance 2000 0.7 1.0 0.5 0.0 3<br />
Ashford Depot improvements 2000 0.0 0.6 0.0 0.0 1<br />
CONTR<strong>AC</strong>TOR<br />
Connex car parks 2001 0.0 0.5 0.5 0.0 1<br />
London Bridge Station automatic ticket gates 2000 0.0 0.5 0.0 0.0 1<br />
Other schemes Various 0.7 0.0 0.0 1.0 21<br />
TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 10.1 12.4 11.3 311.6 31<br />
TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.2 0.0 0.0 0.0<br />
Progress on the 1998 NMS<br />
STATIONS During 1998, major works have been completed at Folkestone<br />
Central including track and platform rationalisation, and refurbishment of the<br />
station with new lifts and facilities to meet standards for mobility-impaired access.<br />
Discussions are under way with the local authority and Connex for<br />
improvements to the station facilities at Tonbridge. Planning permission has been<br />
sought for a redevelopment of Bromley South Station.<br />
SRP work has been completed at Eynsford, Shoreham, Otford, Bat and Ball,<br />
Sevenoaks, Maidstone East, Bearsted, Hollingbourne, Harrietsham, Lenham and<br />
Charing.<br />
It is proposed to enlarge and improve car park three at Sevenoaks and<br />
make improvements to the station forecourt to improve interchange. Customerinformation<br />
systems at all Connex franchised stations are being replaced and<br />
significantly improved through a Railtrack and Connex partnership scheme.<br />
SIGNALLING EQUIPMENT RENEWAL <strong>The</strong> renewal of signalling equipment in<br />
the Dover area was completed in 1998. Following the completion of signalling<br />
condition assessments, we intend to undertake signalling equipment renewal in<br />
the Hither Green area by 2001.<br />
LINESPEED IMPROVEMENTS <strong>The</strong> opening of CTRL Section 1 will enable<br />
journey-time improvements for domestic services on existing lines. Elsewhere on<br />
the route, an initial linespeed improvement feasibility study is complete and<br />
priority routes have been identified. Action will be taken where meaningful<br />
journey-time reductions can be realised. Feasibility work is continuing for other<br />
sections of the route. Further work will take place this year to determine<br />
whether additional journey-time reductions can be achieved with new rolling<br />
stock.<br />