Midland Main Line: London to Sheffield continued<br />

<strong>The</strong>se are the route improvements we plan to deliver<br />

CAP<strong>AC</strong>ITY CHANGES TO MEET FRANCHISING DIRECTOR, PTE AND CUSTOMER REQUIREMENTS AND DELIVER ROUTE VISION<br />

LOCATION PROPOSED SOLUTION YEAR REF<br />

St Pancras Feasibility work to assess the possible reinstatement of Platform 1 2000<br />

Platform 6 will be reinstated for the summer timetable 1999<br />

Kentish Town–Luton and Bedford See bottleneck analysis above. In addition, the Thameslink 2000 project includes lengthening platforms<br />

to enable the operation of 12-vehicle trains<br />

Kentish Town–Farringdon Capacity will be increased as part of Thameslink 2000 projected to meet the requirements of the 2006<br />

proposed 24-trains-per-hour timetable. No additional capacity will be provided prior to this.<br />

We will undertake a timetable exercise with Thameslink to increase the number of peak-hour trains<br />

for the summer 2000 timetable<br />

Bedford A new fast-line platform will be available to operate the new timetable 1999<br />

Railtrack is considering options to further improve the operation of this station<br />

Wigston Junction Increase capacity by changing from the current single-lead junction to a double-lead junction 1999<br />

Leicester area We are evaluating the effects of proposed freight train-service increases on the current 1999<br />

infrastructure to inform any decision on required changes<br />

Nottingham A new platform, Platform 6, will be made available for passenger trains to allow for an increase in 1999<br />

Central Trains services to and from Leicester<br />

Derby Platform 5 will be upgraded to allow its use by Sprinter and Turbostar trains to provide extra 1999<br />

capacity within the station<br />

Dore–Sheffield Feasibility work is ongoing to assess how to provide extra capacity to cater for known growth aspirations<br />

by train operators<br />

CAPABILITY CHANGES TO <strong>AC</strong>HIEVE ROUTE VISION<br />

JOURNEY TIMES km STOPS CURRENT POSITION 2001 POSITION SUSTAINING THE ROUTE <strong>AC</strong>HIEVING ROUTE VISION<br />

London St Pancras–Sheffield (fast lines) 255 1 84mph (1hr 59min) 85mph (1hr 57min) No change 93mph (1hr 48min)<br />

London St Pancras–Sheffield via Derby 266 2 79mph (2hr 06min) 80mph (2hr 04min) No change 88mph (1hr 53min)<br />

London St Pancras–Derby 208 0 86mph (1hr 30min) 88mph (1hr 28min) No change 91mph (1hr 25min)<br />

London St Pancras–Leicester 160 0 86mph (1hr 09min) 89mph (1hr 07min) No change 104mph (57min)<br />

Derby–Sheffield 58 0 64mph (34min) 64mph (34min) No change 77mph (28min)<br />

London St Pancras–Nottingham 204 3 84mph (1hr 31min) 86mph (1hr 29min) No change 89mph (1hr 25min)<br />

Farringdon–Bedford 82 2 68mph (45min) 71mph (43min) No change 77mph (40min)<br />

LINESPEEDS (km of track)<br />

Up to 35mph 51 51 51 51<br />

40–75mph 208 208 208 204<br />

80–105mph 575 575 575 531<br />

110–125mph 209 209 209 257<br />

Over 125mph 0 0 0 0<br />

TOTAL 1043 1043 1043 1043<br />

GAUGE (km of route)<br />

W6A 393 393 393 393<br />

W7 367 367 367 367<br />

W8 256 256 256 256<br />

W9 76 76 76 76<br />

W10 0 0 0 13<br />

AXLE WEIGHT (km of track)<br />

Up to 20.3 tonnes 4 4 4 4<br />

20.4 tonnes to 23.4 tonnes 131 131 131 131<br />

23.5 tonnes to 25.4 tonnes 908 908 908 908<br />

TOTAL 1043 1043 1043 1043<br />

A<br />

A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

G<br />

H<br />

J

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!