Renewals expenditure to deliver the programme of route improvements (£M – 1998/99 prices)<br />
PROGRAMME OF WORK 1998/99 1999/2000 2000/01 2001/02–2005/06 REF<br />
Track 13.0 7.4 7.2 50.7<br />
Structures 5.8 4.2 4.7 34.7<br />
Signalling 0.8 3.2 4.0 13.9<br />
Plant & Machinery 0.0 0.7 0.2 4.7<br />
Telecoms 0.2 0.9 0.2 2.4<br />
Stations 5.2 4.2 0.8 11.3<br />
Depots 0.0 6.6 1.2 4.4<br />
TOTAL EXPENDITURE 25.1 27.2 18.3 122.1<br />
Enhancement expenditure on schemes to achieve the route vision (£M – 1998/99 prices)<br />
PROGRAMME OF WORK COMPLETION 1998/99 1999/2000 2000/01 2001/02–2005/06 CRR REF<br />
COMMITTED<br />
Wales & West station enhancements 2000 0.0 3.2 0.0 0.0<br />
CIS enhancements 2000 0.0 0.9 0.0 0.0 1<br />
Station enhancements 2001 0.0 0.2 0.0 0.0<br />
COMMERCIAL<br />
Taunton Station – reopening of island platform 2000 0.0 0.1 0.0 0.0 1<br />
PARTNERSHIP<br />
Linespeed increases 2003 0.0 0.0 0.0 25.0 1<br />
CONTR<strong>AC</strong>TOR<br />
Tavistock Junction new freight terminal 2002 0.0 0.0 0.0 2.5<br />
Exeter Euroterminal 2002 0.0 0.1 2.0 0.9<br />
Menheniot park-and-ride Station 2004 0.0 0.0 0.0 1.5<br />
Barnstaple linespeed improvements 2001 0.0 0.6 0.3 0.0 1<br />
THIRD PARTY<br />
<strong>The</strong>ale park-and-ride new station 2001 0.0 0.3 2.8 0.0<br />
Other schemes Various 0.6 1.7 0.2 4.8 11<br />
TOTAL RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.6 4.4 0.1 26.4 15<br />
TOTAL NON-RAI<strong>LT</strong>R<strong>AC</strong>K EXPENDITURE 0.0 2.7 5.2 8.3<br />
Progress on the 1998 NMS<br />
TENs FEASIBILITY STUDY <strong>The</strong> study has been completed and shows that<br />
some significant journey-time improvements are possible, for example a<br />
reduction of 27.5 minutes between Penzance and Bristol. For Plymouth–Bristol<br />
we are working with our customers to refine options for journey-time savings<br />
and to agree a funding framework. For Penzance–Plymouth and<br />
Taunton–London, the revenue gained from the improved journey time would be<br />
inadequate to finance the required investment; we are, therefore, working with<br />
our customers, government (local, regional, national and European) and other<br />
stakeholder groups to secure funding for this project.<br />
Freight-loading gauge enhancement shows strong societal benefits, and we<br />
are seeking external funding support.<br />
P r e fe rred sites for future intermodal freight terminals have been identified at<br />
E xeter Airp o rt, Tavistock Yard (Plymouth) and in mid-Cornwall. We are now<br />
wo rking with EWS and potential deve l o p e rs to refine proposals for these locations.<br />
STATIONS <strong>The</strong>ale, Menheniot and Kingskerswell park-and-ride stations are<br />
included in our business plan, subject to adequate funding, in partnership with the<br />
sponsors for the development and train-service provision. Further feasibility<br />
studies will be undertaken in partnership with the South West authorities during<br />
1999/2000 to evaluate new stations and train-service provision.<br />
In 1998/99, we have made excellent progress with the Station Regeneration<br />
Programme, undertaking works at many stations on the route. In 1999/2000, the<br />
works will be completed at all stations. In partnership with local authorities, we<br />
are taking the opportunity to incorporate additional and improved facilities at<br />
many locations, ranging from larger stations such as Bristol Temple Meads, Exeter<br />
St David’s and St Austell to many smaller rural, unstaffed stations. An improved<br />
station car park has been provided at Taunton, together with local authority<br />
funded car-park improvements at St Austell and Liskeard. Depending on funding<br />
and listed building consent, a new station building and passenger facilities will be<br />
provided at St Austell.<br />
We will provide enhanced customer-information and security systems at<br />
many locations on the route during 1999/2000, in conjunction with our train<br />
operator partners and local authorities.<br />
We will shortly complete works at Penzance to allow a motorail service to<br />
London to be reintroduced from summer this year.<br />
We are developing proposals in conjunction with local authorities and Firs t<br />
Great We s t e rn for improved interchange facilities at Exeter St Dav i d ’s and Ply m o u t h .<br />
PERFORMANCE IMPROVEMENT We are continuing this year’s substantially<br />
expanded programme of sea-defence works at Dawlish and improvements at<br />
Stafford’s Bridge to reduce flooding. We are also continuing with a major<br />
overhaul of the Royal Albert Bridge. We have replaced track circuits with the<br />
more reliable axle-counter system at Starcross, Totnes and Aish, and we are<br />
evaluating more locations. We will reinstate the middle platform at Taunton to<br />
improve operational flexibility and performance.<br />
CAP<strong>AC</strong>ITY Our detailed analysis shows that there is sufficient capacity for all the<br />
identified existing and future services in the period of this NMS.<br />
B<br />
A<br />
G<br />
C<br />
D<br />
E<br />
F<br />
169