20.01.2013 Views

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

R A I LT R AC K - The Railways Archive

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4<br />

168<br />

Reading and Bristol to Penzance and branches continued<br />

<strong>The</strong>se are the route improvements we plan to deliver<br />

CAP<strong>AC</strong>ITY CHANGES TO MEET FRANCHISING DIRECTOR, PTE AND CUSTOMER REQUIREMENTS AND DELIVER ROUTE VISION<br />

LOCATION PROPOSED SOLUTION YEAR REF<br />

Bristol–Plymouth–Penzance Analysis shows that there is sufficient capacity for all the identified existing and future services. Studies<br />

We will, nevertheless, undertake the following. complete<br />

• Study of possible redoubling of Weston-Super-Mare Loop and provision of additional platform. 2000<br />

• Provision of additional platforms at Bristol Temple Meads.<br />

• Provision of additional platform at Taunton.<br />

• Study of options for single-line sections in Cornwall.<br />

CAPABILITY CHANGES TO <strong>AC</strong>HIEVE ROUTE VISION<br />

JOURNEY TIMES km STOPS CURRENT POSITION 2001 POSITION SUSTAINING THE ROUTE <strong>AC</strong>HIEVING ROUTE VISION<br />

Bristol–Exeter 122 2 61mph (1hr 15min) No change 65mph (1hr 10min) 67mph (1hr 07min)<br />

Reading–Exeter 245 4 80mph (1hr 54min) No change No change 81mph (1hr 45min)<br />

Exeter–Plymouth 84 2 49mph (1hr 04min) No change 56mph (56min) 58mph (54min)<br />

Plymouth–Penzance 130 13 41mph (1hr 58min) No change 47mph (1hr 44min) 48mph (1hr 40min)<br />

LINESPEEDS (km of track)<br />

Up to 35mph 74 75 75 75<br />

40–75mph 403 403 403 403<br />

80–105mph 689 689 689 689<br />

110–125mph 46 46 46 46<br />

Over 125mph 0 0 0 0<br />

TOTAL 1211 1212 1212 1212<br />

GAUGE (km of route)<br />

W6A 699 699 699 699<br />

W7 555 597 597 555<br />

W8 174 216 216 240<br />

W9 0 42 42 240<br />

W10 0 0 0 240<br />

AXLE WEIGHT (km of track)<br />

Up to 20.3 tonnes 134 135 135 135<br />

20.4 tonnes to 23.4 tonnes 293 293 293 293<br />

23.5 tonnes to 25.4 tonnes 784 784 784 784<br />

TOTAL 1211 1212 1212 1212

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!