East Coast Main Line: London to Edinburgh continued<br />

<strong>The</strong>se are the route improvements we plan to deliver<br />

CAP<strong>AC</strong>ITY CHANGES TO MEET FRANCHISING DIRECTOR, PTE AND CUSTOMER REQUIREMENTS AND DELIVER ROUTE VISION<br />

LOCATION PROPOSED SOLUTION YEAR REF<br />

London–Peterborough King’s Cross additional platform and station enhancements. New station junction and tracks. 2003/04<br />

Holloway–Alexandra Palace and Huntingdon–Peterborough provision of extra tracks. Power supply<br />

upgrades. Peterborough additional platform capacity and station enhancements.<br />

Peterborough–York Flyover north of Peterborough and at Doncaster. New chord lines at Allington near Grantham and 2003/04<br />

South Elmsall. Upgrading of the GN/GE joint line via Lincoln between Peterborough and Doncaster<br />

and the route from Moorthorpe–Colton Junction Line (south of York). Remodelling of layout at<br />

Doncaster. New loop at Skellow. Power supply upgrades. Extension of loops on the ECML to increase<br />

capacity and reliability for both passenger and freight services.<br />

York–Newcastle York additional tracks and signalling alterations. Upgrade between Northallerton and Ferryhill. 2003/04<br />

Restoration of the Leamside Line (between Ferryhill and Newcastle) and chord line at Bensham.<br />

Newcastle Station enhancements.<br />

Newcastle–Edinburgh Additional capacity and power upgrade 2003/04<br />

Doncaster–Leeds Remodelling at Wakefield and Leeds 2002/04<br />

Newark New flyover in place of flat crossing 2006/07<br />

Thameslink 2000 Extension of platforms between London, Cambridge and Peterborough to accommodate longer (12-car) 2006<br />

trains. New junction at Belle Isle (near King’s Cross) and po wer supply upgrade.<br />

Hitchin New flyovers 2008/09<br />

Welwyn Expansion of viaduct and tunnels for four tracking 2008/09<br />

Throughout Closure/diversion of occupational/footpath level crossings, power-supply upgrades, 2003/04<br />

linespeed improvements, tilting trains<br />

CAPABILITY CHANGES TO <strong>AC</strong>HIEVE ROUTE VISION<br />

JOURNEY TIMES km STOPS CURRENT POSITION 2001 POSITION SUSTAINING THE ROUTE <strong>AC</strong>HIEVING ROUTE VISION<br />

London–Edinburgh 631 1 99mph (3hr 58min) No change No change 112mph (3hr 30min)<br />

London–Newcastle 431 0 110mph (2hr 26min) No change No change 115mph (2hr 20min)<br />

London–Leeds 298 1 96mph (1hr 56min) No change No change 102mph (1hr 49min)<br />

LINESPEEDS (km of track)<br />

Up to 35mph 134 134 134 134<br />

40–75mph 548 548 548 548<br />

80–105mph 482 482 482 482<br />

110–125mph 1013 1013 1013 1013<br />

Over 125mph 0 0 0 0<br />

TOTAL 2177 2177 2177 2177<br />

GAUGE (km of route)<br />

W6A 841 841 841 841<br />

W7 841 841 841 841<br />

W8 841 841 841 841<br />

W9 0 0 0 841<br />

W10 0 0 0 817<br />

AXLE WEIGHT (km of track)<br />

Up to 20.3 tonnes 1113 1113 1113 1113<br />

20.4 tonnes to 23.4 tonnes 832 832 832 832<br />

23.5 tonnes to 25.4 tonnes 232 232 232 232<br />

TOTAL 2177 2177 2177 2177<br />

A B<br />

D<br />

E F<br />

G<br />

H<br />

I<br />

J<br />

K L<br />

M<br />

P<br />

N<br />

C

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!