U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 87)<br />

H. Pump Tank at Gas Cooling Towers: Located near each of the<br />

gas cooling towers is a 3'-0" diameter pump tank. The pump tank<br />

at the gas cooling tower near blast furnace number three is 16*-<br />

2" high. The pump tank at the gas cooling tower near blast<br />

furnace number four is 19'-10" high. The tanks hold water which<br />

has been used in the gas cooling towers so that it can be<br />

redirected to pumps feeding the venturi gas washers.<br />

Installation Date: 1971.<br />

I. Pump House Building for Gas Cleaning Equipment at Blast<br />

Furnaces Numbers Three and Four: A 15'-0" wide x 45'-0" long x<br />

12*-o M high concrete block building, laid out on a north - south<br />

axis, is located between the gas cleaning facilities at blast<br />

furnace numbers three and four. The building contains pumps for<br />

the venturi gas washers and the gas cooling towers.<br />

Construction Date: 19 61.<br />

1. Venturi Gas Scrubbers Pumps: Along the eastern wall of<br />

the building, laid out on a north-south axis, are three 1950 gpm<br />

Wilson-Snyder pumps, each powered by a 100 hp motor.<br />

Installation Date: 1971.<br />

2. Gas Cooling Tower Pumps: Along the western wall of the<br />

building, laid out on a north-south axis, are three 4150 gpm<br />

Wilson-Snyder pumps, each powered by a 75 hp motor.<br />

Installation Date: 1971.<br />

J. Strainer Building: Located approximately 90 f -0" south and<br />

30*-0" west of the gas cooling tower at blast furnace number four<br />

is the 15*-0" wide x 30'-0" long x 12'-0" high concrete block<br />

strainer building. The building, which is laid out on a north-<br />

south axis contains two 16" motorized Helan strainers. Const<br />

ructi<br />

on<br />

Date:<br />

1971.<br />

Installation of Strainers: 1971.<br />

K. Primary Gas Washer for Dorothy Six: Located 35'-2 1/8"<br />

northwest of the dustcatcher on the grounds of the remains of<br />

Dorothy Six is a 21'-0" diameter, 190,000 scfm venturi type<br />

primary gas washer manufactured by the Chemical Construction<br />

Corporation.<br />

Installation Date: 1962.<br />

L. Gas Cooling Tower for Dorothy Six: A 24'-0" inside<br />

diameter gas cooling tower is located 68 f -0" northwest of the<br />

primary gas washer on the grounds of the remains of Dorothy Six.<br />

Manufactured by the Chemical Construction Corporation, the