19.01.2013 Views

pa1778data.pdf

pa1778data.pdf

pa1778data.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

U.S. STEEL DUQUESNE WORKS<br />

HAER NO. PA-115<br />

(Page 85)<br />

centerline of the suction inlet is 6 5/8" below the discharge<br />

connection.<br />

Installation Date: 1962.<br />

16. Turboblower Number Four Condensate Removal Motor/Pump<br />

Assemblies: Two condensate removal motor/pump assemblies, laid<br />

out on a east-west axis, are located on the building floor, east<br />

of the surface condenser. The northern and southern units are<br />

each located 3 f -0" from the centerline of the condenser. The<br />

northern unit consists of a 25 hp Elliott Induction Motor rated<br />

at 1185 rpm which is connected by a gear drive to an Ingersoll -<br />

Rand 600 gpm centrifugal pump. The southern unit consists of a<br />

25 hp Elliott Steam Turbine rated at 1150 rpm which is connected<br />

by a gear drive to a 600 gpm Ingersoll - Rand centrifugal pump.<br />

Installation Date: 1962.<br />

C. Blowing Engine House Number Three: Built by the American<br />

Bridge Company, blow engine house number three is 104 f -6" wide x<br />

244'-7" long overall. The northern, eastern, and western walls<br />

of the steel framed building are constructed of brick. The<br />

southern wall is constructed of corrugated metal. The building<br />

is divided up into two sections. At its north end is a 42 f -0"<br />

wide x 104'-6" long x 60*-8" high (to the underside of the truss)<br />

bay which is laid out on a east-west axis. The encased steel<br />

framework of the bay supports Fink trusswork for its gable roof.<br />

Three rows of 4'-0" wide x 13'-8" high segmented archway windows<br />

rim the north, east and west walls of the bay.<br />

Running perpendicular to the bay at the northern end of the<br />

building is a 104'-6" wide x 202 f -7" long x 44'-0" high (to the<br />

underside of the truss) bay which is laid out on a north-south<br />

axis. The steel framework of the bay supports pratt trusswork<br />

for its gable roof with monitor. An upper and lower row of 4'-0"<br />

wide x 13'-8" high segmented archway windows are cut into the<br />

building's east and west walls. A craneway spanning the width of<br />

the bay runs its entire length and carries a 25-ton crane. The<br />

clearance between the floor of the building and the top of the<br />

craneway f s rail is 30*-0". Located along the western wall in the<br />

southwest corner of the bay is a 20 , -0 H wide x 80'-0" long x 10'-<br />

0" high cinder block structure which was used for office space.<br />

Located along the southern wall of the building is a 20'-0" wide<br />

x 80*- 0" long x 10'-0" high cinder block structure which was<br />

used as a locker room.<br />

Construction Date of North Bay: 1897.<br />

Construction Date of South Bay Extension: 19 08.<br />

II- Gas Cleaning Facilities:<br />

A. Uptakes and Downcomers for Blast Furnace's Number One,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!