U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 66)<br />

building was designed and manufactured by Canadian Met-Chem<br />

Consultants Limited of Montreal, Quebec.<br />

Construction date: 1980.<br />

C. Hot Metal Track: The track running through the iron<br />

desulfurization building becomes a hot metal track leading to the<br />

basic oxygen steelmaking shop after it leaves the building.<br />

Installation date: 1980.<br />

VIII. Ferromanaanese Preparation, Storage, and Delivery<br />

Facilities:<br />

A. Primary Ferromanaanese Crushing and Conveying Line:<br />

Travelling in a west to east direction, the primary<br />

ferromanganese crushing and conveying line is located 27 0'-0"<br />

north of the ferromanganese car preparation building. The line<br />

consists of a 7'-0" high steel framed platform straddling a<br />

standard gauge railroad track at its far western end; a motor<br />

driven 36" x 15'-3" Pioneer Oro Feeder leading to a 24" x 36"<br />

Pioneer Jaw Crusher driven by a 150 hp motor capable of crushing<br />

125 tons per hour; and a 30" x 46 , -0" motor driven conveyor belt<br />

extending from just below the jaw crusher and rising at a slope<br />

of 10 degrees.<br />

Installation date: 1965.<br />

B. Secondary Ferromanaanese Crushing and Conveying Line: The<br />

secondary ferromanganese crushing and conveying line is laid out<br />

parallel to and 19'-0" south of the primary line. It consists of<br />

a T'-O" high steel framed platform straddling a standard gauge<br />

railroad track at its far western end; a 25 hp motor driven 3 6" x<br />

12'-3" Pioneer Oro Feeder leading to a 125 ton per hour 150 hp<br />

motor driven 24" x 3 6" Pioneer Jaw Crusher; and a steel framed<br />

3 0" x 50'-0" motor driven conveyor belt extending from just below<br />

the conveyor belt and rising at a slope of 10 degrees.<br />

Installation date: 1955.<br />

C. Crushing and Screening Control House: An approximately 8'-<br />

0" square x s'-O" high corrugated metal control house sits on a<br />

raised platform between the primary and secondary crusher.<br />

Construction date: 1965.<br />

D. Ferromanganese Conveying, Screening, Storage, and Delivery<br />

Itine.: The 250'-0" long ferromanganese conveying, screening, and<br />

storage line is laid out perpendicular to the primary and<br />

secondary lines at their eastern end and travels southward to<br />

within 20*-0" of the ferromanganese car preparation building's<br />

north wall. It consists of a steel framed 30" x 250'-0" motor<br />

driven conveyor belt extending from below the primary and<br />

secondary line which rises at a slope of 10 degrees; a three grid