U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 35)<br />

The installation of improved air quality control systems at<br />

Duquesne occurred primarily at the mill's electric furnace and<br />

basic oxygen steelmaking plants during the early 1970s. Both<br />

installations were major extensions to previous air quality<br />

control systems constructed in the early 1960s and both were<br />

constructed because the original air purification facilities fell<br />

far below local and federal standards regulating the amount of<br />

particulate matter which could be emitted into the atmosphere<br />

from industrial sources. The electric furnace plant, for<br />

example, was releasing five or six times the amount of permitted<br />

air pollution in 1970. In an effort to correct this problem, the<br />

original dry cleaning system was expanded by embedding four<br />

additional large hoods in the roof structure of the furnace<br />

building for collecting airborne discharges from the five<br />

electric furnaces. The hoods conveyed the fume through duct work<br />

to an enlarged bag house where the solid particles from the smoke<br />

were filtered by fiberglass bags. The extension to the basic<br />

oxygen plant consisted of doubling the capacity of its existing<br />

wet gas cleaning system. 48<br />

Notwithstanding the prodigious amounts of money invested in<br />

modernizing the Duquesne Works between 1953 and 1981, the<br />

fortunes of the mill took a dramatic turn for the worse when the<br />

bottom dropped out of the domestic oil and gas producing<br />

industries in the early months of 1982. The basis for the boom<br />

in domestic oil and gas production resulted from the creation of<br />

the Organization of Petroleum Exporting Countries (OPEC) in 1973.<br />

Until its creation, oil sold on the world market for as little as<br />

$2.10 a barrel. After the founding of OPEC, however, the price<br />

of oil rose dramatically, reaching $34 per barrel in 1981. This<br />

price increase allowed the U.S. oil industry, which had<br />

significantly higher production costs than other oil producing<br />

countries in the world, to compete very favorably on the world<br />

market. As a result, there was an immense demand for oil well<br />

General Superintendent of Plant Utilities, interview with author,<br />

August 4, 1989; United States Steel Corporation,<br />

Engineering/Research Division, "Operation Manual for WQC<br />

Facilities, Non-Evaporative Recycle System, Blast Furnace No. 6:<br />

Project No. 501-7565," (Monroeville, PA: 1980), 2-1 - 2-35; Metcalf<br />

& Eddy, Inc./Engineers, "Operation Manual, Rolling Mills Division,<br />

Primary and Bar Mills, Wastewater Recycle Facilities: U.S. Steel<br />

Duquesne Works," (Boston, MA: 1981), 2-1 - 2-9.<br />

48 "Duquesne Works Constructing U.S. Steel Developed Smoke-<br />

Filtering System," Blast Furnace and Steel Plant 39 (March 1961):<br />

268; Pittsburgh Post-Gazette, June 30, September 12, 1970, March<br />

18, 1971, January 14, 1972, December 4, 1973, March 30, June 11-12,<br />

1974.