19.01.2013 Views

pa1778data.pdf

pa1778data.pdf

pa1778data.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 255)<br />

and monitor are supported by Fink trusses. Square windows rim<br />

its northern, southern, and western walls at the second floor.<br />

The structure contains masonry offices on its first and second<br />

floor as well as storage space.<br />

Construction date: ca. 192 5.<br />

XVIII. Plant Utilities Office Building: Laid out on a north-<br />

south axis, the two story, 96' long x 43' wide Plant Utilities<br />

Office Building is located 50' north of Electric Power House<br />

Number l. Constructed on a concrete foundation by the American<br />

Bridge Company, the building's brick exterior encases a steel<br />

frame. Corbelled brickwork exists along the cornice of the<br />

structure. Its corrugated metal gable roof is supported by<br />

riveted Fink trusses. Rectangular windows rim its northern,<br />

eastern, and western walls. The first floor of the building<br />

contains several storage bins while the second floor consists of<br />

several offices.<br />

Construction date: ca. 192 0.<br />

XIX. Paint Shop: Laid out on a north-south axis, the two story,<br />

70' long x 25' wide Paint Shop is located 20* north of the Plant<br />

Utilities Office Building. Built on a concrete foundation by the<br />

American Bridge Company, the building's brick exterior encases a<br />

steel frame. Its corrugated metal gable roof is supported by<br />

riveted Fink trusses. Corbelled brickwork exists along the<br />

cornice of the building. Rectangular windows rim the structure's<br />

eastern, western, and southern walls. The first floor of the<br />

building consists of a washroom and a locker room. The paint<br />

shop itself was located on the second floor.<br />

A two story, 11' square brick lean-to is located off of the<br />

northern wall of the building. Its inside was gutted at the time<br />

of the HAER inventory.<br />

Construction date: ca. 192 0.<br />

XX. Main Office Building: Laid out on a north-south axis, the<br />

two story, approximately 12 5' long x 100* wide Main Office<br />

Building is located across Pennsylvania Route 837 from the upper<br />

works. Constructed on a concrete foundation, the steel-frame<br />

building has an ornate brick exterior and a slate hipped roof.<br />

Rectangular windows rim the four walls of the building at its<br />

basement, first, and second floors. An attic dormer juts out at<br />

the northern wall of the building,<br />

By far the most elaborately designed of the buildings<br />

associated with the Duquesne Works site, the Main Office Building<br />

consisted of offices in its basement, first, and second floors<br />

for the Work's superintendent and his staff. Today the building<br />

is owned and operated by Allegheny County and has been renamed<br />

the Business Innovation Center.<br />

Construction date: ca. 1910.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!