•<br />

operation.<br />

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 193)<br />

c. Fume Hoods: A 13*-8" diameter, water cooled, fume<br />

hood comprised of a membrane-type construction is located<br />

directly above each, furnace. Each hood doglegs upwards to a<br />

quencher on the top floor of the building.<br />

d. Scrap Charging Track: A wide gauge track runs along<br />

the floor on the charging or eastern side of the furnace. The<br />

track carried a scrap charging transfer car before scrap charging<br />

was accomplished with overhead cranes.<br />

e. Lfrtile AflflXtJ-ve Bins: Four 400 cu. ft. capacity<br />

ladle additive bins laid out linearly on a north-south axis are<br />

suspended from the service floor just south of furnace number two<br />

on its tapping or western side. Two of the bins contained<br />

ferromanganese, and two contained ferrosilicon.<br />

f. Ladle Additive Chutes: A steel framed chute hangs<br />

from the floor on the northern and southern side of each furnace<br />

at a 45 degree angle. The chutes direct ferromanganese or<br />

ferrosilicon into the teeming ladle after the furnace has been<br />

tapped.<br />

g. Elevator Shaft: One 12'-2" wide x 16*-9" long<br />

elevator shaft leading from the ground floor to the roof of the<br />

building is located 13'-7" south of furnace number one's main<br />

control building on its tapping side.<br />

h. Main Office and Chemical Laboratory Building:<br />

Located 14'-3" due south of the elevator shaft is a one story,<br />

351-411 wide x 212'-0" long concrete block building. The building<br />

houses the BOP shop's main offices, its chemical laboratory, and<br />

locker rooms.<br />

3. Service Floor: The 86■-0" wide x 225'-0" long service<br />

floor is composed of a steel framed platform 32'-3" above the<br />

operating floor. The northern edge of the floor coincides with<br />

the northern edge of the operating floor.<br />

a. Batching Hoppers: One ll'-9 1/2" top I.D. x 3'-6<br />

5/8" bottom I.D. x 16'-2" high cone shaped batching hopper is<br />

suspended from the batching floor just south of the fume hood for<br />

each furnace. A gate operated, water cooled flux chute leads<br />

from the bottom of each batching hopper at a 40 degree angle<br />

through the fume hood into the top opening of each furnace.<br />

b. Oxygen Lances: Two oxygen lances per furnace are<br />

hung from a lance positioning and hoisting rig assembly extending