STEELMAKING PLANT - BASIC OXYGEN<br />

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 190)<br />

Historic Name: U.S.S. Corporation, Duquesne Works, Basic Oxygen<br />

Steelmaking System<br />

Present Name: U.S.X. Corporation, National-Duquesne Works, Basic<br />

Oxygen Steelmaking System<br />

Location: Upper Works<br />

Construction: 1964, 1979, 1982<br />

Documentation: Photographs of the Basic Oxygen Steelitiaking Plant<br />

are in HAER No. PA-115-B.<br />

DESCRIPTION<br />

I- Flux Handling Building. Trestle, and Covered Conveyor:<br />

Located approximately 500*-0" south and 200*-0" east of the BOP<br />

shop is the one story, l4 , -6" wide x 240*-0" long flux handling<br />

building. Laid out on a north-south axis, the steel framed<br />

building with corrugated metal exterior was constructed by the<br />

American Bridge Company. Its gable roof is supported by<br />

structural I-beams. The interior of the building contains a 7<br />

1/2-ton hoist which is attached to a car shaker.<br />

The building sits upon an elevated standard gauge single<br />

track trestle which extends 100'-0" past its south wall opening<br />

and 220 ! -0" in front of its north wall opening. Nineteen hoppers<br />

are hung from that portion of the trestle which is located under<br />

the roof of the building. Located below the hoppers is a 24"<br />

motor powered conveyor belt which travels in a northerly<br />

direction. The conveyor rises at a 30 degree angle after it<br />

passes the trestle and travels through a 8'-0" diameter conveyor<br />

tube to the south wall of the BOP shop where it turns at a 90<br />

degree angle and travels in a easterly direction up the wall at a<br />

15 degree angle before turning into the building. Once inside<br />

the building, the conveyor, traveling in a northerly direction,<br />

rises at a 15 degree angle to the furnace aisle's flux storage<br />

floor.<br />

Construction date: 19 63.<br />

II. Mould Preparation Building: Built on a concrete foundation<br />

by the American Bridge Company, the mould preparation building is<br />

located 30*-0" south of the south wall of the BOP shop at its<br />

near western teeming aisle. Laid out on a north-south axis, the<br />

170 , -8" wide x 480*-0" long x 50'-5" high steel framed,<br />

corrugated metal clad structure originally made up the southern<br />

end of the furnace building and the mixer building for Open<br />

Hearth Number One. The southern end of the existing building<br />

(old mixer building) is 117'-3" wide x 58*-0" long. The eastern<br />

wall of the old mixer building is coextensive with the centerline