U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 184)<br />

intermediate transfer table and cradle; a draw furnace of the<br />

same dimensions as the heating and holding furnace; a draw-<br />

holding furnace of the same dimensions as above; and a run-out<br />

table with cradle.<br />

Installation date: 1962.<br />

I. Ajax Mangnethermic Induction Line: Manufactured by Ajax<br />

Inc., the mangnethermic induction line was also used to harden<br />

and temper bars. Laid out on a straight line from north to<br />

south, the equipment making up the line consists of a load table;<br />

a motor-driven chain conveyor which transfers bars from the load<br />

table to a roller type in-feed conveyor line which is located<br />

just west of the load table; four electric heating coils; a ring<br />

type spray quenching facility complete with guide rollers for<br />

holding the product to be heated and quenched; and a roller type<br />

discharge table onto which are attached cradles from which the<br />

finished bars are picked up and transferred to the finishing and<br />

testing equipment by an E.O.T. crane.<br />

Installation date: 1962.<br />

J. Finishing and Testing Equipment: Located within the heat<br />

treatment plant building are a number of pieces of equipment used<br />

for finishing and testing bars. These include gag presses, bar<br />

straighteners, hack saws, abrasive cut-off machines, bar turners,<br />

centerless grinders, hardness testers, and a 25-ton scale. The<br />

following gives the general location and manufacturer (when<br />

possible) of the equipment within the building:<br />

1. Gag Presses: There are a total of two hydraulic gag<br />

presses in the building. Laid out on a north-south axis, gag<br />

press No. 1 is located 59' west of the continuous electric heat<br />

treating line's tempering furnaces. Gag press No. 2, also laid<br />

out on a north-south axis, is located approximately 45' south of<br />

the continuous gas fired heat treating line. Both presses<br />

consist of an entry table, a gag press station, and a delivery<br />

table. Each gag press is approximately 100' long.<br />

Installation dates: 1943 and 1962.<br />

2. Bar Straighteners: The building contains four two roll<br />

bar straighteners manufactured by Medart Inc. Bar straightener<br />

No. 1 is located 20* east of gag press No. 1 and is laid out on a<br />

north-south axis. Bar straightener No. 2, also laid out on a<br />

north-south axis is located 20* east of bar straightener no. 1.<br />

Bar straightener no. 3 is located 56' from the western wall of<br />

the transfer bay and is laid out on a north-south axis. Bar<br />

Straightener no. 4, laid out on a south-north axis, is located<br />

82■ from the eastern wall of the production bays in the southern<br />

end of the building. Each straightener is approximately 85' long<br />

and consists of an entry table, two roll station, and a delivery