Corporation, "Bell Cylinders Rope Diagram, Charging Equipment,<br />
Blast Furnace #4: Drawing #29647, August 27, 1958."; U.S. Steel<br />
Corporation, "Index, Working Diagram, Alterations for McKee Top,<br />
Blast Furnace No. 3: Drawing #26258, March 27, 1953."; U.S. Steel<br />
Corporation, "General Arrangement, 50" Diameter & 38" Diameter<br />
Bell Cylinder Piping & Operating Mechanism, Blast Furnace No. 3:<br />
Drawing #26066, January 27, 1953."; U.S. steel Corporation,<br />
"McKee Top & Bell Operating Mechanism, Blast Furnace No. 3:<br />
Drawing #2 6312, March 25, 1953."; Steve Chomanics, Blast Furnace<br />
Maintenance Foreman, interview with author, July 18, 1989;" Don<br />
Dvorsky, Mon Valley Works Energy Manager, interview with author,<br />
October 25, 1989."<br />
10.United States Steel Corporation, "U. S. Steel - Mon<br />
Valley Works - Duquesne Plant, Property Inventory List,"<br />
(Duquesne: 1984), 27-8, 40; "Novel Equipment Features U. S.<br />
Steel's New Duquesne Blast Furnace," Iron and Steel Engineer 4 0<br />
(July 1963): 146-150; U.S. Steel Corporation, "General<br />
Arrangement, Cross Section Through Stockhouse Looking East, 28'-<br />
0" Blast Furnace No. 6: Drawing #43002, March 30, 1962."; U.S.<br />
Steel Corporation, "Arrangement, Skip Car - 400 Cu. Ft. Capacity,<br />
28 f -0" Blast Furnace No. 6: Drawing #43411, August 31, 1961.";<br />
U.S. Steel Corporation, "Plan, Skip Pit, 28 , -0" Blast Furnace No.<br />
6: Drawing #43084, June 27, 1961."; U.S. Steel Corporation,<br />
"Stockhouse Arrangement, Plan of Operating Floor and Collecting<br />
Belts, 28'-0" Blast Furnace No. 6: Drawing #43031, February 19,<br />
1961."; U.S. Steel Corporation, "No. 6 Blast Furnace, Stockhouse,<br />
Plan of Stockhouse, Duquesne Works: Drawing #57525, August 10,<br />
1970."; U.S. Steel Corporation, "No. 6 Blast Furnace, Stockhouse,<br />
Existing Conveyor Systems, Flow Diagram: Drawing #65042, October<br />
6, 1969."; U.S. Steel Corporation, "General Arrangement, Cross<br />
Section Through Furnace Looking North, 28*-0" Blast Furnace No.<br />
6: Drawing #43000, March 5, 1962."<br />
11.United States Steel Corporation, "General Arrangement 20"<br />
Belt Conveyor, Blast Furnace Stockyard: Drawing #35237, September<br />
1, 1959."; U.S. Steel Corporation, "General Arrangement 24" Coke<br />
Breeze Belt Conveyor, Blast Furnace Stockyard: Drawing #35236,<br />
September 9, 1959."; U.S. Steel Corporation, "General Arrangement<br />
24" Coke Breeze Conveyor, No. 4 Blast Furnace to No. 6 Blast<br />
Furnace Stockyard: Drawing #56647, December 11, 1968."<br />
12.Steve Chomonics, Blast Furnace Maintenance Foreman,<br />
interview with author, July 18, 1989.<br />
13.United States Steel Corporation, "U. S. Steel - Mon<br />
Valley Works - Duquesne Plant, Property Inventory List,"<br />
(Duquesne: 1984), 37; "Buckets and Skips for Blast Furnaces," The.<br />