•<br />

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 141)<br />

deep skip pit is built of concrete construction. Its centerline<br />

is located 35 f -0" off of the eastern wall of the stockhouse and<br />

243'-3" off of the centerline of blast furnace number 3.<br />

Construction Date: 1953.<br />

6. Skip Incline and Track: The skip track consists of two<br />

parallel sets of rails spaced 5'-8 1/2" apart, mounted to a 15'-<br />

6" wide x approximately 9'-0" high inclined bridge, which rises<br />

for a distance of lSl'-lO 1/2" from the stockhouse floor to the<br />

top of the furnace along its centerline. The incline of the<br />

bridge is approximately 60 degrees.<br />

Design Date: 1952.<br />

7. Skip Cars and Carriage: The skip cars and carriages on<br />

both sets of tracks meet the requirements described in III - A -<br />

7.<br />

Design Date: 1952.<br />

Construction Date: 1969.<br />

8. Coke Breeze Feeder Conveyor: See description I - A - 9.<br />

Installation Date: 1959.<br />

9. Main Coke Breeze Conveyor: See description I - A - 10.<br />

Installation Date: 1959.<br />

10. Control Room: The control room for the raw materials<br />

delivery system at blast furnace number 4 adheres to the<br />

requirements described in I - A - 11, II - A - 8, and III - A -<br />

10. Construction Date: 1953.<br />

11. Counterweight Hoist Tower: The counterweight hoist<br />

tower is located on the east wall of the stockhouse just south of<br />

the skip pit. Rising to the level of hoist house number 4, the<br />

tower, which is constructed of structural I-beams, is<br />

approximately 5'-6" wide x 9'-0" long x 77'-0" high. The<br />

counterweight hoist system consists of three pairs of 6*-l 1/4"<br />

sheave wheels, one of which is located below the hoist house at a<br />

45 degree angle. The sheave wheels are connected by 1 1/4"<br />

diameter ropes to the skip incline motor, drive, and winch drum<br />

assembly and to two counterweights which run on rails up and down<br />

the counterweight hoist tower as the skip car travels along the<br />

skip track.<br />

Construction Date: 1921.<br />

B. Hoist House:<br />

1. Hoist House Building: Located approximately lS'-O" west<br />

of and on the centerline of blast furnace number 4, the hoist