pa1778data.pdf
pa1778data.pdf
pa1778data.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
U.S. STEEL DUQUESNE WORKS<br />
HAER No. PA-115<br />
(Page 130)<br />
screen provides the power for vibration. Associated with the<br />
screen is a mechanical gate outfitted with a weight on each side<br />
of it. The gate was used to restrain the coke when it was not<br />
being charged into the hoist bucket.<br />
Construction Date: 1924.<br />
5. Hoist Bucket Pit: Located 120*-0" from the north wall of<br />
the stockhouse and Sl'-e" from the east wall, the concrete hoist<br />
bucket pit is 13"-0" wide x 26'-4 1/2"" long x 18•-2 1/2" deep.<br />
Construction Date: 1924.<br />
6. Motor and Turntable for Hoist Bucket: Located in the<br />
center and on the floor of the hoist bucket pit is a 5'-10"<br />
diameter x 2'-9/16" thick bell shaped turntable attached by two<br />
nearly perpendicular line shafts to a 15 hp W. C. & Manufacturing<br />
Company motor operating at 600 rpm. The motor is located in a<br />
5'-0" wide x 6'-3" long x 4'-0" deep enclave in the center of the<br />
western wall of the hoist bucket pit.<br />
Construction Date: 1924.<br />
7. Hoist Track and Carriage: The carriage is an 11 1/2"<br />
thick steel plate mounted on steel rail wheels. The centerline<br />
distance between the front and back wheels is 9'-0 M , the distance<br />
across the centerline of the wheels is 8 f -8 1/8". Hanging from<br />
the centerline of the front axle is the stem of the hoist bucket.<br />
The hoist track consists of a set of rails, 8'-l 1/8" apart,<br />
mounted to a 167'-0" high inclined bridge leading to the top of<br />
the furnace along its centerline. The incline of the truss is<br />
broken into two segments. It rises at an angle of 70 degrees to<br />
a height of 133'-0 M where it becomes a 58 degree angle to the<br />
furnace top.<br />
Design date: 1924.<br />
8. Hoist Bucket: There is one hoist bucket (capacity level<br />
full a= 250 cu. ft.) mounted on the carriage which is set on the<br />
hoist track leading to the top of the furnace. The bucket is 6'-<br />
10" in diameter x 8'-6 7/8" high. The bottom 3*-2 3/8" of the<br />
bucket is beveled at an angle of 24 degrees. Inside of the<br />
bucket is a spider mounted on its inside wall. The spider helps<br />
desegregate the coarse and fine particles in the charge while the<br />
bucket revolves on the turntable. The bottom of the bucket is<br />
made up of a 4'-l" diameter movable bell attached to the stem of<br />
the carriage.<br />
Design Date: 1924.<br />
Construction Date: 19 68.<br />
9. Coke Breeze Feeder Conveyor: 20" conveyor belts<br />
(capacity = 110 feet per minute), manufactured by The C. O.<br />
Barlett and Snow Company of Cleveland, Ohio, run from the