pa1778data.pdf
pa1778data.pdf
pa1778data.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
U.S. STEEL DUQUESNE WORKS<br />
HAER No. PA-115<br />
(Page 129)<br />
Historic Name: U.S. Steel Corporation, Duquesne Works, Blast<br />
Furnace Plant, Raw Materials Delivery System<br />
Present Name: U.S.X. Corporation, National-Duquesne Works, Blast<br />
Furnace Plant, Raw Materials Delivery System<br />
Location: Upper Works<br />
Construction: 1896, 1923-24, 1953-54, 1960-62<br />
Documentation: Photographs of the Duquesne Blast Furnace Plant<br />
located in HAER No. PA-115-A.<br />
I. Blast Furnace Number One:<br />
A. Stockhouse:<br />
DESCRIPTION<br />
1. Stockhouse Building: The stockhouse building, laid out<br />
on a north-south axis, is constructed of rough—faced ashlar and<br />
is 77'-0" wide x 1456'-0" long x 40'-0" high. The trestle's<br />
steel platform forms the roof of the building which is supported<br />
by a cross-braced steel column frame.<br />
Construction Date: 1896.<br />
2. Ore and Flux Scale Car: The scale car ran along the<br />
western side of the stockhouse while being powered by an<br />
electrical rail which is attached to the western wall. The car<br />
is equipped with two pneumatically operated weigh hoppers. One<br />
hopper has a capacity of 32,000 lbs., the other 24,000 lbs. The<br />
motor, air compressor, and air receiver arrangement which<br />
operates the weigh hopper dumping system is unidentifiable.<br />
Installation Date: 1924.<br />
3. Ore and Flux Bins: The "Baker" suspension type ore and<br />
flux bins are hung from the steel framework of the trestle over<br />
the western, or ore yard wall of the stockhouse. Their bottom<br />
openings are arranged along the western wall of the stockhouse<br />
for blast furnaces 1, 2, 3, and 4 above the scale car. Their<br />
capacities are unknown at this time.<br />
Construction Date: 1924.<br />
4. Coke Bin: A 14-ton double coke bin, constructed by the<br />
American Bridge Company, spans the hoist bucket pit and has<br />
openings on the north and south side of the pit. The bins are<br />
hung from the steel framework of the trestle underneath the coke<br />
track. Attached to each bottom opening of the bin is a weigh<br />
hopper. The dumping system, which is attached to each weigh<br />
hopper bottom opening, is composed of a inclined Vibrolator<br />
vibrating coke screen and a chute leading to the hoist bucket at<br />
the bottom of the pit. A 2 hp motor attached to the top of the