19.01.2013 Views

pa1778data.pdf

pa1778data.pdf

pa1778data.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 127)<br />

the only alteration of consequence was the replacement of the<br />

rotary table feeders located below the 50-ton hoppers at the car<br />

dumper by vibrating feeders attached directly to the hoppers in<br />

1970. 5<br />

ENDNQTES:<br />

1.Harold E. McGannon, ed. , The Making, Shaping, and Treating<br />

of Steel, Eighth Edition, (Pittsburgh: 1964), 9; "The Duquesne<br />

Furnaces of the Carnegie Steel Co., Ltd.," The Iron Trade Review<br />

30 (March 25, 1897): 7; "The Duquesne Furnace Plant of the<br />

Carnegie Steel Company Limited," The Iron Age 59 (March 25,<br />

1897): 5-7; Carnegie Steel Company, "Foundation Plan of Stock<br />

Yards for Blast Furnaces No. 1 and 2: Drawing #1332A, August<br />

27,1895."; Carnegie Steel Company, "Foundation Plan of Stock<br />

Yards for Blast Furnaces No. 3 and 4: Drawing #1332B, December<br />

16, 1895."<br />

2.United States Steel Corporation, "Aerial Survey Guide,<br />

Physical Inventory Ore Stockyard, Blast Furnace Department:<br />

Drawing #29745, August 26, 1958."; Duquesne Times, April 5, 1918;<br />

"New Iron and Steel Works Construction," The Iron Age 105<br />

(January 1, 1920): 100; Carnegie Steel Company, "Plan Showing<br />

Location of Rail Splices, Rails for Trestle Tracks (Coke<br />

Trestle), 6th Lining - Reconstruction, No. 1 Blast Furnace:<br />

Drawing #15033, May 5, 1923," "General Arrangement of Coke<br />

Trestle, Sixth Lining - Reconstruction, No. 2 Blast Furnace:<br />

Drawing #15416, January 28, 1924," "General Arrangement of Car<br />

Puller On Coke Trestle, No. 2 Blast Furnace: Drawing #17471,<br />

February 28, 1928," "Bumpers, Ore Bin Side Stockyard, 10 Ton Ore<br />

Bridges, Blast Furnaces: Drawing #17407, October 11, 1927,"<br />

"General Arrangement, Extension of Ore Bridge Runway, 10 Ton Ore<br />

Bridge, East and West Side of Stockyard, Blast Furnaces: Drawing<br />

#17828, March 28, 1928," "Extension of Ore Bridge Runway, 10 Ton<br />

Ore Bridge, East and West Side of Stockyard, Blast Furnaces:<br />

Drawing #17819, May 21, 1928."<br />

3.Carnegie-Illinois Steel Corporation, "Location Diagram and<br />

Details of Track Stringers To Be Reinforced, Coke Trestle, No. 5<br />

Furnace: Drawing #20933, June 16, 1938," "Alterations to Track<br />

Stringers for Coke Bins, Blast Furnaces No. 1 & No. 2: Drawing<br />

#21140, October 2, 1939," "Repairs to Coke Trestle at No. 1 & 2<br />

Blast Furnaces, Plan and Section Present Structure: Drawing #<br />

24867, April 25, 1950," "Repairs to Coke Trestle at No. 1 & 2<br />

Blast Furnaces, Plan - Floor and Track Support Structures:<br />

Drawing #24869, April 28, 1950."; United States Steel Company,<br />

"Clearance Diagram, 15 Ton Ore Bridge No. 3, Blast Furnaces:<br />

Drawing #25454, September 26, 1953."; United States Steel<br />

Corporation, "Key Diagram - Ore Bins & Conveyors - South End,

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!