19.01.2013 Views

pa1778data.pdf

pa1778data.pdf

pa1778data.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

•<br />

U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 12 3)<br />

scoop. The bucket is capable of traveling horizontally for a<br />

distance of 282 , -0" at a maximum speed of 765 feet per minute.<br />

The speed of the hoist drive assembly is 3 00 feet per minute.<br />

2. Repair Hoist: The 7 1/2-ton Wright-Speedway repair hoist<br />

for the equipment on the man trolley hangs from a monorail which<br />

is riveted to the underside of the structural steel bracing at<br />

the top chords of the bridge span, approximately 24*-0" above the<br />

trolley's platform. Running the entire length of the span, the<br />

monorail is located on its centerline.<br />

3. Control House and Operators Cab: A 13'-0" wide x 16'-0"<br />

long x 10*-0" high control house is hung from the western end of<br />

the trolley platform. It sits on a platform which is hung from<br />

the northern and southern side of the trolley platform. The<br />

steel framed sheet steel clad building houses electrical switch<br />

gear. An approximately 6'-6" wide x 7'-0" long x S'-O" high<br />

sheet steel clad man-trolley operator's cab is suspended from the<br />

control house about the centerline of the bridge span. It sits<br />

on a platform which is hung from the western end of the control<br />

house platform.<br />

4. Trolley Walkway: The 4'-0" wide trolley walkway, made of<br />

steel grating, is wedged between, and welded to, the bottom<br />

chords of the bridge span and the trolley rail chords on all four<br />

sides of the structure.<br />

5. Trolley Rail Buffer Assembly: Located at each corner of<br />

the trolley runway, the trolley rail buffer assembly consists of<br />

a 30" diameter hydraulic cylinder equipped with a piston rod,<br />

capable of delivering a 72" stroke, which is mechanically<br />

connected to runway stoppers. Each buffer assembly is designed<br />

to absorb the shock of the trolley as it reaches the end of its<br />

run.<br />

6. Dumper: Composed of a 50-ton hopper which is equipped<br />

with a heater and power operated gates, the dumper is located on<br />

a cantilevered platform at the eastern end of the bridge. The<br />

approximately 30'-0" square platform extends eastward from the<br />

shear leg. The dumper, which drops ore into stockhouse bins<br />

suspended from the trestle's steelwork, travels the length of the<br />

ore yard.<br />

7. Motor-Generator Control House: The approximately 15*-0"<br />

wide x 30 f -0" long x 19 f -0" high steel framed motor-generator<br />

control house has a corrugated metal exterior and gable roof. It<br />

sits on a platform supported by the top chords of the bridge span<br />

and is located directly over the top chords of the shear leg. A<br />

motor-generator set is located on the floor of the building 7'-9"

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!