U.S. STEEL DUQUESNE WORKS<br />

HAER No. PA-115<br />

(Page 121)<br />

equipped with a heater and power operated gates. It is located<br />

on a 30 ( -0" square platform attached to the ore bridge on its<br />

eastern end by a steel framework extending downward from the top<br />

chord of the bridge span. The dumper, which delivers ore to the<br />

stockhouse bins, is centered over the ore bins along the trestle<br />

as it travels the length of the ore yard.<br />

7. Anemometer Platform and Frame: The anemometer platform<br />

is approximately 7 , -0" wide. It spans the northern and southern<br />

top chords of the bridge span approximately 75'-0" from its pier<br />

leg end. At the center of the platform are two 4'-0" high<br />

triangular frames made up of steel bars which are spaced 10'-0"<br />

apart about the centerline of the span. The frames were used to<br />

support an anemometer which measured wind force and speed.<br />

8. Ore Bridge Stairwells and Landings: Steel framed<br />

stairwells and landings leading from the ground to the top of the<br />

ore bridge span are located at the pier leg and shear leg ends of<br />

the bridge.<br />

B. Ore Bridge Number Four: Ore bridge number four was<br />

designed and built by the American Bridge Company in 1962. It is<br />

located south of ore bridge number three and laid out on a east-<br />

west axis across the ore yard. Made out of riveted steel<br />

construction, it consists of a set of pier and shear legs which<br />

carry a 334'-3" long x 24'-0" wide Warren bridge span. The<br />

height of the span is 29'-0" from the western or pier leg end of<br />

the bridge for a distance of 108'-4 1/2" before becoming 26'-0"<br />

for its remaining length. The northern and southern members of<br />

the span's top and bottom chord are laid out on a east-west axis.<br />

The eastern and western members of the top and bottom chord are<br />

laid out on a north-south axis.<br />

The 80'-6 ,f high pier leg is a three dimensional V shaped<br />

structure made up of large steel column framing. The V shaped<br />

legs of the structure are located on the northern and southern<br />

side of the ore bridge at its western end. Each V leg rises at a<br />

60 degree angle from the structure's 60'-0" long bottom chord to<br />

its 34'-0 M long top chords. The top chords of the structure,<br />

spaced approximately 40'-0" apart, run on a north-south axis<br />

flush underneath the northern and southern members of the span's<br />

top chord. The bottom chord of the structure runs on a north -<br />

south axis just above the 8-wheel pier trucks. A pair of 10 1/4"<br />

diameter clevis connections are hung, one each, from the eastern<br />

and western side of the bottom chord at both of its ends. The<br />

centerline of the clevis connections coincide with the centerline<br />

of the pier trucks. The two approximately 40'-0" long x S'-O"<br />

wide x 8'-0" high 8-wheel trucks are constructed of four linearly<br />

designed sets of two steel rail wheels, laid out on a north -