19.01.2013 Views

June 17, 2011 To: Georgia Department of Community Affairs 60 ...

June 17, 2011 To: Georgia Department of Community Affairs 60 ...

June 17, 2011 To: Georgia Department of Community Affairs 60 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

( ) (x ) Is the project within 15 miles <strong>of</strong> a military airfield?<br />

( ) (x ) Is the project within 5 miles <strong>of</strong> a civil airport?<br />

( ) (x ) Is noise a problem on the site and/or is expected to be in the future?<br />

Noise is ________dnl.<br />

If any <strong>of</strong> the above are checked “Yes”, please attach the following:<br />

1. A noise assessment conforming to the HUD Noise Assessment Guidelines (NAG) and 24 C.F.R § 51.100 et seq. prepared<br />

by the Environmental Pr<strong>of</strong>essional or other qualified engineering pr<strong>of</strong>essional (for airports, use the adopted DNL contours).<br />

Please refer to the <strong>Department</strong> <strong>of</strong> Housing and Urban Development’s Noise Guidebook, located at:<br />

http://www.hud.gov/<strong>of</strong>fices/cpd/energyenviron/environment/resources/guidebooks/noise/index.cfm.<br />

2. A noise attenuation plan produced by an engineering pr<strong>of</strong>essional to describe the proposed mitigation to meet HUD sound<br />

guidelines.<br />

3. Attach a map showing the project location and the locations <strong>of</strong> any relevant roads, railroads, or airports, along with their<br />

approximate distance from the project site; (2) If applicable, attach a copy <strong>of</strong> the Noise Assessment Guidelines worksheets.<br />

Comments:<br />

Source Documentation: (attach NAG worksheets)<br />

Site and area reconnaissance, maps<br />

Explosive and Flammable/Hazardous Industrial Operations<br />

Yes No<br />

( ) (x ) Are industrial facilities handling explosive or fire-prone materials such as liquid propane, gasoline or other<br />

storage tanks adjacent to or visible from the project site?<br />

(attach ASD worksheets)<br />

If your answer is “Yes”, use the HUD Hazards Guide and comply with 24 CFR Part 51, Subpart C (www.hudclips.org).<br />

Comments:<br />

No above ground storage tanks were observed on adjacent properties.<br />

Source Documentation:<br />

If your answer is YES, use HUD Hazards Guide and comply with 24 CFR Part 51, Subpart C and attach Acceptable<br />

Separation Distance worksheets from the HUD Hazards Guide.<br />

Area/Site Reconnaissance, Google Earth<br />

Hazards and <strong>To</strong>xic Chemicals<br />

Yes No<br />

( ) (x ) Are industrial facilities handling explosive or fire-prone materials such as liquid propane, gasoline, or other<br />

storage tanks visible from or near the project site?<br />

( ) (x ) Is the project located near a dump or landfill site?<br />

( ) (x ) Is the project near an industry disposing <strong>of</strong> chemicals or hazardous wastes?<br />

( ) (x ) Are there issues that require a special/specific Phase II report before completing the environmental<br />

assessment?<br />

( ) (x ) Is site listed on an EPA Superfund National Priorities, CERCLA, or equivalent State list?<br />

( ) (x ) Is the site located within 3,000 feet <strong>of</strong> a toxic or solid waste landfill site?<br />

( ) (x ) Does the site have an underground storage tank?<br />

( ) (x ) Are there any unresolved concerns that could lead to HUD being determined to be a Potential Responsible<br />

Party (PRP)?<br />

If your answer is “Yes” to any <strong>of</strong> the above questions, use current techniques by qualified pr<strong>of</strong>essionals to undertake<br />

investigations determined necessary and comply with § 50.3(i). Attach Phase I (ASTM) Report) Documentation from<br />

the Environmental Pr<strong>of</strong>essional, including any applicable mitigation measures, that the project will be located at an<br />

acceptable distance from the hazardous site.<br />

Comments:<br />

Source Documentation:<br />

Area/Site Reconnaissance, Google Earth<br />

<strong>2011</strong> HOME/HUD Environmental Questionnaire DCA Office <strong>of</strong> Affordable Housing<br />

Page 9 <strong>of</strong> 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!