Ticketing and Concessionary Travel on Public Transport - United ...
Ticketing and Concessionary Travel on Public Transport - United ...
Ticketing and Concessionary Travel on Public Transport - United ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Ev 130 <strong>Transport</strong> Committee: Evidence<br />
The Design Study comprises three stages:<br />
— Stage One—Scoping Study (completed).<br />
— Stage Two—Requirements Analysis (completed 26 ).<br />
— Stage Three—Programme Definiti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Firm Fixed Price Proposal (work-in-progress).<br />
Key Requirement<br />
The overarching statement of requirements is that, “Operati<strong>on</strong>ally, there must be no degradati<strong>on</strong> to the<br />
current Oyster service as a result of the implementati<strong>on</strong> of ITSO <strong>on</strong> PRESTIGE”:<br />
— Operati<strong>on</strong>s include passenger gate throughput transacti<strong>on</strong> times, bus driver sign-<strong>on</strong> times, fares<br />
revisi<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> the provisi<strong>on</strong> of (management) reports, as specified in the TSC.<br />
— Degradati<strong>on</strong> refers to all performance measures cited in the TSC (no relief will be given to the terms<br />
of the current TSC), the ability of TfL to deliver the Oyster service, <str<strong>on</strong>g>and</str<strong>on</strong>g> the availability of the<br />
Oyster service.<br />
— Oyster Service refers to current provisi<strong>on</strong> under the TSC or any addenda thereto made by previous<br />
variati<strong>on</strong>s to the PRESTIGE c<strong>on</strong>tract; there will be no adverse aVect <strong>on</strong> the TSC.<br />
— Implementati<strong>on</strong> relates to any <str<strong>on</strong>g>and</str<strong>on</strong>g> all interfaces between ITSO <str<strong>on</strong>g>and</str<strong>on</strong>g> Oyster <strong>on</strong> PRESTIGE.<br />
The following key requirements in additi<strong>on</strong> to the above from the Variati<strong>on</strong> Notice were derived. The<br />
system must:<br />
— deliver a passenger experience similar to that of Oyster, where possible;<br />
— be fully ITSO certified;<br />
— support all ITSO card types <str<strong>on</strong>g>and</str<strong>on</strong>g> relevant product types;<br />
— provide ITSO card read / validati<strong>on</strong> performance of less than 750 millisec<strong>on</strong>ds;<br />
— operati<strong>on</strong>ally support ITSO Hotlists <str<strong>on</strong>g>and</str<strong>on</strong>g> Acti<strong>on</strong> Lists;<br />
— fully implement TfL’s existing magnetic ticket business rules applied to ITSO cards; <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
— provide support for revenue c<strong>on</strong>trol activities, including passback protecti<strong>on</strong>.<br />
IOP will provide an ITSO Operating service in that it will accept ITSO products presented <strong>on</strong> a smartcard,<br />
without providing product retailing functi<strong>on</strong>ality to TfL.<br />
Implementati<strong>on</strong> Soluti<strong>on</strong><br />
The End Stage Two Report included various opti<strong>on</strong>s to meet the requirements. Opti<strong>on</strong> 2 was selected for<br />
the Stage Three activities. This opti<strong>on</strong> is full replacement of the PRESTIGE readers <str<strong>on</strong>g>and</str<strong>on</strong>g> the functi<strong>on</strong>al<br />
capability to support ITSO Hot Lists <str<strong>on</strong>g>and</str<strong>on</strong>g> Acti<strong>on</strong> Lists as well as facilitating staV Customer Service<br />
assistance <str<strong>on</strong>g>and</str<strong>on</strong>g> providing Passengers access to informati<strong>on</strong> <strong>on</strong> their ITSO cards.<br />
The following technical soluti<strong>on</strong>s will be required to implement ITSO <strong>on</strong> PRESTIGE:<br />
— Provisi<strong>on</strong> of TfL ITSO back oYce (purchase <str<strong>on</strong>g>and</str<strong>on</strong>g> integrati<strong>on</strong>) <str<strong>on</strong>g>and</str<strong>on</strong>g> associated ITSO infrastructure<br />
enhancements.<br />
— Upgrade the card readers (hardware <str<strong>on</strong>g>and</str<strong>on</strong>g> software) to provide the required card performance <str<strong>on</strong>g>and</str<strong>on</strong>g><br />
to include the ITSO Security Access Module (ISAM).<br />
— Upgrade Ticket OYce Machines (software) to read <str<strong>on</strong>g>and</str<strong>on</strong>g> display ITSO card c<strong>on</strong>tents to enable<br />
ticket oYce pers<strong>on</strong>nel to determine whether or not passengers have the correct products with<br />
which to travel in “Oysterl<str<strong>on</strong>g>and</str<strong>on</strong>g>”.<br />
— Upgrade Patr<strong>on</strong> Operated Machines (software) to read <str<strong>on</strong>g>and</str<strong>on</strong>g> display ITSO card c<strong>on</strong>tents to enable<br />
passengers to determine whether they have the correct products <strong>on</strong> their ITSO cards with which<br />
to travel in “Oysterl<str<strong>on</strong>g>and</str<strong>on</strong>g>”.<br />
— Provide the functi<strong>on</strong>ality (hardware <str<strong>on</strong>g>and</str<strong>on</strong>g> software) for ITSO data to be retrieved from the memory<br />
of a failed card reader to ensure no transacti<strong>on</strong> data is lost.<br />
November 2007<br />
26 The results of the requirements analyses are presented in the ITSO <strong>on</strong> PRESTIGE Project—Design Study: End Stage<br />
Two Report.