18.01.2013 Views

(PDF, 101 mb) - USAID

(PDF, 101 mb) - USAID

(PDF, 101 mb) - USAID

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.RECOMMENDATIONS<br />

- :42 ­<br />

8.1 A CRS/<strong>USAID</strong> workshop to review the outcomes of this<br />

evaluation, and to formulate next steps. This workshop<br />

should occur as soon as the new CRS/India Director is in<br />

position.<br />

8.2 CRS should establish closer links with Government at the<br />

national, state and local levels to ensure integration of<br />

program planning and implementation. It is recommended that<br />

CRS liaise with GOI at national and state levels; that local<br />

Government technical officers be included as resource people<br />

in training seminars; and that possibilities be explored for<br />

integrating the planning and implementation of FFW-assisted<br />

projects with local Block Development Plans.<br />

8.3 CRS should take more initiative with <strong>USAID</strong> and other donors<br />

to ensure greater resource mobilization for the FFW Program.<br />

Consignees should take more initiative with Government and<br />

other PVOs to do the same.<br />

8.4 The PM&E System as developed by Community Systems Foundation<br />

should be revitalized.<br />

8.4.1 the remaining PM&E Grant funds should be reallocated<br />

to cover costs of CRS Field Reviewers to prepare<br />

additional case studies on-site; and to fund a<br />

seminar in each zone designed to use the case<br />

studies as an educational tool. The Grant should be<br />

extended to Septe<strong>mb</strong>er 1988.<br />

8.4.2 The BIA and AEA formats should be reviewed and<br />

revised. Plrocedure should be developed within CRS<br />

to consolidate and analyze evaluation results, and<br />

draw co1CJeIusi ons and learnings as inputs for future<br />

planning; and expected users of thle BIIA and AEA<br />

instruments should receive further training. Outside<br />

assistancL will liklv tC required to carry out<br />

these recommendations.<br />

8.4.3 A nect,:s-La Sed tt,linini approach is strongly<br />

rec 1mwTcnded t in;rov,: job pc rfornancu of CRS staff<br />

and key consi guee's an] project holders in planning,<br />

project desiign, management and evaluation. To<br />

dLvelop this needs based approach, a training needs<br />

assessment is strongly advised within the next six<br />

months. Outside assistance will be required for<br />

this needs assessment.<br />

8.4.4 An annual seminar to review the implementation of<br />

the PM&E System should occur at the national level

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!