(PDF, 101 mb) - USAID
(PDF, 101 mb) - USAID
(PDF, 101 mb) - USAID
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8.RECOMMENDATIONS<br />
- :42 <br />
8.1 A CRS/<strong>USAID</strong> workshop to review the outcomes of this<br />
evaluation, and to formulate next steps. This workshop<br />
should occur as soon as the new CRS/India Director is in<br />
position.<br />
8.2 CRS should establish closer links with Government at the<br />
national, state and local levels to ensure integration of<br />
program planning and implementation. It is recommended that<br />
CRS liaise with GOI at national and state levels; that local<br />
Government technical officers be included as resource people<br />
in training seminars; and that possibilities be explored for<br />
integrating the planning and implementation of FFW-assisted<br />
projects with local Block Development Plans.<br />
8.3 CRS should take more initiative with <strong>USAID</strong> and other donors<br />
to ensure greater resource mobilization for the FFW Program.<br />
Consignees should take more initiative with Government and<br />
other PVOs to do the same.<br />
8.4 The PM&E System as developed by Community Systems Foundation<br />
should be revitalized.<br />
8.4.1 the remaining PM&E Grant funds should be reallocated<br />
to cover costs of CRS Field Reviewers to prepare<br />
additional case studies on-site; and to fund a<br />
seminar in each zone designed to use the case<br />
studies as an educational tool. The Grant should be<br />
extended to Septe<strong>mb</strong>er 1988.<br />
8.4.2 The BIA and AEA formats should be reviewed and<br />
revised. Plrocedure should be developed within CRS<br />
to consolidate and analyze evaluation results, and<br />
draw co1CJeIusi ons and learnings as inputs for future<br />
planning; and expected users of thle BIIA and AEA<br />
instruments should receive further training. Outside<br />
assistancL will liklv tC required to carry out<br />
these recommendations.<br />
8.4.3 A nect,:s-La Sed tt,linini approach is strongly<br />
rec 1mwTcnded t in;rov,: job pc rfornancu of CRS staff<br />
and key consi guee's an] project holders in planning,<br />
project desiign, management and evaluation. To<br />
dLvelop this needs based approach, a training needs<br />
assessment is strongly advised within the next six<br />
months. Outside assistance will be required for<br />
this needs assessment.<br />
8.4.4 An annual seminar to review the implementation of<br />
the PM&E System should occur at the national level