* CRS should take more initiative with <strong>USAID</strong> and other donors to ensure<br />
greater resource mobilization for the FFW Program. Consignees should take<br />
more initiative with Government and other PVOs to do the same.<br />
* The PN&E System as developed by Community Systems Foundation should be<br />
revitalized.<br />
The remaining PM&E Grant funds should be reallocated to cover costs<br />
of CRS Field Reviewers to prepare additional case studies on-site;<br />
and to fund a seminar in each zone designed to use the case studies<br />
as an educational tool. The Grant should be extended to Septe<strong>mb</strong>er<br />
1988.<br />
The BIIA and AEA formats should be reviewed and revised. Procedures<br />
shoula be developea within CRS to consolidate and analyze evaluation<br />
results, and draw conclusions and learnings as inputs for future<br />
planning; and expected users of the BIIA and AEA instruments should<br />
receive further training. Outside assistance will likely be required<br />
to carry out these recommendations.<br />
A neeos-basea training approach is strongly recommended to improve<br />
job performance of CRS staff and key consignees and project holders<br />
in planning, project design, management and evaluation. To develop<br />
this needs baseo approach, a training needs assessment is strongly<br />
advised within the next six months. Outside assistance will be<br />
required for this needs assessment.<br />
An annual seminar to review the implementation of the PM&E System<br />
should occur at the national level to discuss evaluation findings and<br />
fonulate new planning directions. It is recommended that such a<br />
seminar occur within the next six months to review the findings ano<br />
recommendations outlined in this evaluation report in the light of<br />
CRS's past approach to the PM&E System.<br />
Each zonal office should organize on an annual basis a 3-day strategy<br />
oevelopment/planning retreat to aooress issues affecting program<br />
implementation, and to aevelop action plans for the coming year.<br />
* Concentrate resources on consignees who have demonstrated good past<br />
performance. Strengthen their capabilities to support good development<br />
projects with the aadition of staff with technical and development<br />
skills, and experience in rural aevelopment, to carry out project<br />
promotion functions. Provide complementary inputs (training an TA<br />
support, material and cash resources) to their projects.<br />
* Project design assistance should be provided to CRS to develop FFW<br />
project moaels for income-generation, as well as for skill oevelopment.<br />
arket tie-up potentials must be considered.<br />