18.01.2013 Views

VSL's innovations Dampers on test Penny's Bay in HK

VSL's innovations Dampers on test Penny's Bay in HK

VSL's innovations Dampers on test Penny's Bay in HK

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

Achiev<strong>in</strong>g total isolati<strong>on</strong><br />

of the columns from the backfill<br />

With bridge loads supported <strong>on</strong><br />

1.8m diameter piles close beh<strong>in</strong>d<br />

the panel fac<strong>in</strong>g, an effective means<br />

of isolat<strong>in</strong>g pile loads and movement<br />

from the reta<strong>in</strong>ed earth block was<br />

required.<br />

A precast c<strong>on</strong>crete split shell<br />

system was used to provided a cost<br />

effective and rapidly <strong>in</strong>stalled way<br />

of ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g a clear void between<br />

the columns.<br />

N E W S N ° 1 • 2 0 0 4<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!