2 Squeez<strong>in</strong>g <strong>in</strong> and<br />

adjust<strong>in</strong>g to c<strong>on</strong>stra<strong>in</strong>ts<br />

SHARP RADIUS<br />

The bridge c<strong>on</strong>sists of tw<strong>in</strong> decks<br />

each 11.0m wide, with three<br />

c<strong>on</strong>t<strong>in</strong>uous spans 35, 31 and 36m<br />

l<strong>on</strong>g respectively. With a sharp<br />

radius <strong>on</strong> plan and a super elevati<strong>on</strong><br />

of about 6%, the bridge is squeezed<br />

underneath the Expressway, and<br />

above the railway l<strong>in</strong>es. With all<br />

these c<strong>on</strong>stra<strong>in</strong>ts already <strong>in</strong> place,<br />

the bridge box was designed as a<br />

c<strong>on</strong>t<strong>in</strong>uous structure to reduce the<br />

depth of the deck.<br />

SMALL HEADROOM ABOVE<br />

THE BRIDGE<br />

The highway above prevented the<br />

assembly of the gantry next to the<br />

bridge. The equipment had to be<br />

assembled about 80 meters away<br />

from the first span, and had to be<br />

launched <strong>in</strong> three stages to the<br />

erecti<strong>on</strong> area. Clearances between<br />

the gantry and the bridge above were<br />

as low as 200mm.<br />

WORKING OVER THE AIRPORT<br />

EXPRESS AND MTR LINES<br />

The erecti<strong>on</strong> works were c<strong>on</strong>ducted<br />

between 1:30 and 4:30 am <strong>on</strong> limited<br />

days per week, whilst the power to<br />

the rail l<strong>in</strong>es cut off. Specific<br />

precauti<strong>on</strong>s and c<strong>on</strong>t<strong>in</strong>gency plans<br />

were developed <strong>in</strong> c<strong>on</strong>juncti<strong>on</strong> with<br />

MTRC to cover any potential risk and<br />

emergency measures that would<br />

have had to be implemented <strong>in</strong> the<br />

event of a problem which might<br />

of impacted <strong>on</strong> the safe operati<strong>on</strong><br />

of the railway.<br />