<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Page<br />
0000 Construction Costs 1<br />
0010 Direct Costs 1<br />
0100 Building & Plant Facilities 1<br />
0200 Facility <strong>Structure</strong> 1<br />
0300 Building Concrete 1<br />
0400 Masonry 4<br />
0500 Structural Steel 5<br />
0600 Wood & Plastics 7<br />
0700 Thermal & Moisture Protection 9<br />
0800 Doors & Windows 12<br />
0900 Interior Finishes 14<br />
1000 Facility Equipment 17<br />
2000 Facility Services 28<br />
2100 Mechanical 28<br />
2600 Electrical 30<br />
3000 Site & Infrastructure 31<br />
3110 Site Preparation 31<br />
3120 Earthwork 34<br />
3140 Shoring 39<br />
3160 Piling 40<br />
3210 Paving 41<br />
3230 Site Improvements 46<br />
3280 Landscaping 47<br />
3300 Utilities 47<br />
3340 Drainage 48<br />
3350 Pipeline 50<br />
3360 Site Electrical 51<br />
3400 Railwork 54<br />
3440 Airfield 55<br />
3480 Tolling 56<br />
3500 Marine 56<br />
3600 Walls 57<br />
3700 Bridges 58<br />
3800 Tunnels 64<br />
3910 Cofferdams 71<br />
3920 Spillways 71<br />
3930 Dams & Dykes 74<br />
3940 Intakes 78<br />
3950 Penstocks 79<br />
3960 Powerhouses 80<br />
4000 Process Equipment 84<br />
4010 Process Piping 84<br />
4100 Material Processing & Handling 85<br />
4200 Process Heating & Cooling 87<br />
4300 Gas & Liquid Handling 88<br />
4400 Pollution Control Equipment 88<br />
4500 Manufacturing Equipment 89<br />
4600 Power Generation Equipment 89<br />
5000 Mobile Equipment 90<br />
5100 Transit Vehicles 90<br />
5300 Operations & Maintenance Equipment 91<br />
5800 Construction Equipment 91<br />
6000 Indirect Costs 94<br />
6100 Mobilization 94<br />
6200 Site Overhead 95<br />
6300 Fixed Plant 98<br />
6400 Subsistence 99<br />
6500 Unallocated Costs 100<br />
6600 Demobilization 100<br />
03/01/2009 8:35:46 PM Page No 1 of 2
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Page<br />
7000 <strong>Engineering</strong> & Design 100<br />
7400 Project Management 101<br />
7500 Development Costs 103<br />
8000 Operations & Maintenance 104<br />
9000 Project Margin 108<br />
9100 Contingency 108<br />
9200 Escalation 108<br />
9300 Guarantees 108<br />
9400 Insurance 108<br />
9500 Overhead 108<br />
9600 Profit 109<br />
03/01/2009 8:35:46 PM Page No 2 of 2
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1000 Construction Costs LS<br />
1000 Direct Costs LS<br />
1000 Building & Plant Facilities m2<br />
100 Facility <strong>Structure</strong> LS<br />
0300000000 Building Concrete m2<br />
0301000000 Maintenance of Concrete m2<br />
0301200000 Maintenance of Concrete Reinforcing m2<br />
0301210000 Maintenance of Rebar m2<br />
0301230000 Maintenance of Stessing Tendons ea<br />
0301300000 Maintenance of Cast in Place Concrete m2<br />
0301310000 Cleaning Cast in Place Concrete m2<br />
0301320000 Rehabilitation of Cast in Place Concrete m2<br />
0301400000 Maintenance of Precast Concrete m2<br />
0301410000 Cleaning Cast of Precast Concrete m2<br />
0301420000 Rehabilitation of Precast Concrete m2<br />
0301500000 Maintenance of Concrete Slabs m2<br />
0301510000 Cleaning Concrete Slabs m2<br />
0301520000 Rehabilitation of Concrete Slabs m2<br />
0310000000 Concrete Formwork m2<br />
0311000000 Fabricate Formwork m2<br />
0311100000 Fabricate Wood Forms m2<br />
0311110000 Fabricate Light Wood Form m2<br />
0311120000 Fabricate Wood Gang Form m2<br />
0311200000 Fabricate Aluminum Forms m2<br />
0311210000 Fabricate Aluminum Wall Form m2<br />
0311220000 Fabricate Aluminum Travelling Form m2<br />
0311230000 Fabricate Aluminum Fly Soffit Form m2<br />
0311300000 Fabricate Steel Forms m2<br />
0311320000 Fabricate Steel Wall Form m2<br />
0311330000 Fabricate Steel Beam Forms m2<br />
0311400000 Fabricate Architectural Formwork m2<br />
0311410000 Fabricate Textured Formwork m2<br />
0311420000 Fabricate Composite Panels m2<br />
0312000000 Set & Strip Formwork m2<br />
0312100000 Set Strip Building Formwork m2<br />
0312110000 Set Strip Bldg Footing Formwork m2<br />
0312111000 Set Strip Strip Footing Formwork m2<br />
0312112000 Set Strip Pile Cap Formwork m2<br />
0312113000 Set Strip Spread Footing Formwork m2<br />
0312120000 Set Strip Grade Beam Formwork m2<br />
0312121000 Set Strip Grade Beam Sides m2<br />
0312122000 Set Strip Pilasters m2<br />
0312130000 Set Strip Slab On Grade Formwork m2<br />
0312131000 Set Strip Slab On Grade Edge m2<br />
0312132000 Set Strip Slab On Grade Bulkhead m2<br />
0312140000 Set Strip Wall Formwork m2<br />
0312141000 Set Strip Wall Formwork Below Grade m2<br />
0312142000 Set Strip Single Sided Wall Formwork m2<br />
0312143000 Set Strip Retaining Wall Formwork m2<br />
0312144000 Set Strip Core Wall Formwork m2<br />
0312145000 Set Strip Shear Wall Formwork m2<br />
0312150000 Set Strip Bldg Column Formwork m2<br />
0312151000 Set Strip Round Bldg Column Formwork m2<br />
0312152000 Set Strip Square Bldg Column Formwork m2<br />
0312160000 Set Strip Building Elevated Beam Formwork m2<br />
0312161000 Set Strip Form Beam Sides m2<br />
0312162000 Set Strip Form Beam Bottoms m2<br />
0312170000 Set Strip Bldg Elevated Slabs m2<br />
0312171000 Set Strip Build In Place Soffit Form m2<br />
0312172000 Set Strip Slab Drops m2<br />
0312173000 Set Strip Flying Soffit Forms m2<br />
0312174000 Set Strip Soffit Edge Forms m2<br />
0312180000 Set Strip Slab Bulkheads m2<br />
0312181000 Set Strip Slab Bulkhead Forms w/Rebar m2<br />
0312182000 Set Strip Wall Bulkhead Forms w/o Rebar m2<br />
0312190000 Set Strip Stair Formwork m2<br />
0312191000 Set Strip Form Stairs m2<br />
0312192000 Set Strip Form Stair Landings m2<br />
0312600000 Slipform Concrete m2<br />
0312610000 Slipform Shaft Concrete m<br />
0312620000 Slipform Silo Concrete m<br />
03/01/2009 1:04:57 PM Page No 1 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0312700000 Set Strip Architectural Finish m2<br />
0312710000 Set Strip Textured Lined Formwork m2<br />
0312720000 Set Strip Custom Architectural Formwork m2<br />
0313000000 Set Permanent Forms m2<br />
0313100000 Set Sonotube Forms m2<br />
0313200000 Set Void Forms m2<br />
0320000000 Concrete Reinforcement kg<br />
0321000000 Reinforcing Steel t<br />
0321100000 Supply & Place Reinforcing Steel t<br />
0321110000 Plain Reinforcing Steel t<br />
0321120000 Epoxy Coated Reinforcing Steel t<br />
0321130000 Stainless Reinforcing Steel t<br />
0321140000 Mechanical Connectors ea<br />
0321200000 Handle Reinforcing Steel t<br />
0321210000 Handle Plain Rebar t<br />
0321220000 Handle Epoxy Rebar t<br />
0321230000 Handle Stainless Rebar t<br />
0321300000 Rebar Templates Up & Down t<br />
0321310000 Foundation Rebar Templates LS<br />
0321320000 Caisson Rebar Templates LS<br />
0322000000 Welded Wire Fabric m2<br />
0322100000 Slab Wire Fabric m2<br />
0322200000 Shotcrete Wire Fabric m2<br />
0323000000 Dowels kg<br />
0323100000 Concrete Dowels (20M) m<br />
0326200000 Rock Dowels (35M) m<br />
0324000000 Fibrous Reinforcing kg<br />
0324100000 Fibre Reinforcing In Concrete kg<br />
0324200000 Fibre Reinforced In Shotcrete kg<br />
0325000000 Stressing Systems t<br />
0325100000 Post Tensioned Bars t<br />
0325200000 Post Tensioned Strands t<br />
0325300000 Prestressed Strands t<br />
0325500000 Stressing Ducts m<br />
0330000000 Cast-in-Place Concrete m3<br />
0331000000 Supply Place Concrete m3<br />
0331100000 Building Foundation Concrete m3<br />
0331110000 Place Concrete Pad Footings m3<br />
0331120000 Place Concrete Strip Footings m3<br />
0331130000 Place Concrete Spread Footings m3<br />
0331140000 Place Concrete Mudslab m3<br />
0331200000 Building Wall Concrete m3<br />
0331210000 Place Wall Concrete Below Grade m3<br />
0331220000 Place Wall Concrete Above Grade m3<br />
0331230000 Place Concrete Grade Beams m3<br />
0331300000 Building Slab on Grade m3<br />
0331300000 Chute Slab on Grade m3<br />
0331300000 Crane Slab on Grade m3<br />
0331400000 Building Column Concrete m3<br />
0331410000 Column Concrete below Grade m3<br />
0331420000 Column Concrete above Grade m3<br />
0331500000 Building Beam Concrete m3<br />
0331510000 Beam Concrete below Grade m3<br />
0331520000 Column Concrete above Grade m3<br />
0331600000 Elevated Slab m3<br />
0331610000 Pump Elevated Slab m3<br />
0331620000 Crane Elevated Slab m3<br />
0332000000 Cure Concrete m3<br />
0332100000 Cure Wall Concrete m3<br />
0332200000 Cure Slab Concrete m3<br />
0332300000 Apply Curing Agent m2<br />
0333000000 Finish Concrete m2<br />
0333100000 Wet Finish m2<br />
0333110000 Screed Finish m2<br />
0333120000 Float Finish m2<br />
0333130000 Trowel Finish m2<br />
0333140000 Power Screed Finish m2<br />
0333150000 Greencut Concrete m2<br />
0333200000 Hardened Finish m2<br />
0333210000 Harden & Power Trowel m2<br />
0333220000 Harden & Seal m2<br />
03/01/2009 1:04:57 PM Page No 2 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0333230000 Routing & Sealing LS<br />
0333300000 Dry Finish Concrete m2<br />
0333310000 Point & Patch Concrete m2<br />
0333311000 Point Patch Concrete m2<br />
0333312000 Point Patch Elevated Concrete m2<br />
0333320000 Rub Finish Concrete m2<br />
0333321000 Rub Finish Concrete m2<br />
0333322000 Rub Finish Elevated Concrete m2<br />
0333330000 Sand Blast Concrete m2<br />
0333331000 Sand Blast Concrete m2<br />
0333332000 Sand Blast Elevated Concrete m2<br />
0333340000 Bush Hammer Concrete m2<br />
0333341000 Bush Hammer Concrete m2<br />
0333342000 Bush Hammer Elevated Concrete m2<br />
0333350000 Waterblast Hardened Concrete m2<br />
0333361000 Waterblast Concrete m2<br />
0333362000 Waterblast Elevated Concrete m2<br />
0333400000 Grind Concrete m2<br />
0333410000 Grind Bearing Seats ea<br />
0333420000 Grind Concrete Slabs m2<br />
0333500000 Concrete Coatings m2<br />
0333510000 Epoxy Coating m2<br />
0333520000 Apply Penetrant Seal Coating m2<br />
0334000000 Concrete Accessories m<br />
0334100000 Waterstop m<br />
0334200000 Joint Fillers m2<br />
0334300000 Joint Sealers m<br />
0334400000 Backer Rods m<br />
0340000000 Precast Concrete m2<br />
0341000000 Structural Precast T-Beams m<br />
0342000000 Precast Hollow Core Slabs m2<br />
0343000000 Architectural Precast Panels m2<br />
0350000000 Cementitious Decks m2<br />
0351000000 Cementitious Roof Deck m2<br />
0352000000 Light Weight Concrete Roof Insulation m2<br />
0353000000 Concrete Topping m2<br />
0354000000 Cementitious Underlayment m2<br />
0360000000 Grouting ea<br />
0361100000 Grout Anchor Bolt Assemblies ea<br />
0361200000 Grout Equipment Bases ea<br />
0361300000 Grout Floor Slab Joints m<br />
0361400000 Grout Beam & Joist Seats ea<br />
0361500000 Grout Bearings ea<br />
0370000000 Shotcrete m2<br />
0371000000 Wet Mix Shotcrete m3<br />
0372000000 Dry Mix Shotcrete Bag<br />
0380000000 Falsework m2<br />
0381000000 Scaffold Systems m2<br />
0381100000 Rent Scaffold System Month<br />
0381200000 Scaffold Frames Up & Down ea<br />
0382000000 Jacking Systems LS<br />
0388000000 Heavy Steel Soffit Towers m2<br />
0388100000 Fabricate Heavy Steel Soffit Towers m2<br />
0388200000 Supply Set Strip Heavy Soffit Falsework m2<br />
0389000000 Slipform Systems m2<br />
0389100000 Slipform Core Walls m2<br />
0389200000 Slipform Shear Walls m2<br />
0390000000 Concrete Restoration m2<br />
0391000000 Concrete Cleaning m2<br />
0391100000 Clean Horizontal Concrete Surfaces m2<br />
0391200000 Clean Vertical Concrete Surfaces m2<br />
0392000000 Breakout Concrete m3<br />
0392100000 Breakout Concrete Footings m3<br />
0392200000 Breakout Concrete Slab on Grade m3<br />
0392300000 Breakout Concrete Walls m3<br />
0392400000 Breakout Concrete Elevated Slabs m3<br />
0393000000 Clean Rebar m2<br />
0393100000 Clean Vertical Rebar m2<br />
0393200000 Clean Horizontal Rebar m2<br />
0394000000 Concrete Resurfacing m3<br />
0394100000 Concrete Resurfacing m2<br />
03/01/2009 1:04:57 PM Page No 3 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0394200000 Concrete Patches m3<br />
0394300000 Concrete Overlay m3<br />
0395000000 Concrete Rehabilitation m2<br />
0395100000 Epoxy Injected Crack Repair m<br />
0395200000 Shotcrete Restoration m2<br />
0395300000 Low Pressure Grout m3<br />
0400000000 Masonry m2<br />
0410000000 Masonry Material LS<br />
0411000000 Masonry Mortar m3<br />
0411100000 Batch Cement & Lime Mortar m3<br />
0411200000 Batch Epoxy Mortar m3<br />
0411300000 Batch Refractory Mortar m3<br />
0411400000 Batch Premixed Mortar m3<br />
0412000000 Masonry Grout m3<br />
0412100000 Grout Masonry Brick m3<br />
0412200000 Grout Concrete Block m2<br />
0413000000 Masonry Reinforcement kg<br />
0413100000 Continuous Joint Reinforcing kg<br />
0413200000 Masonry Ties kg<br />
0413300000 Masonry Reinforcing kg<br />
0413400000 Stone Anchors kg<br />
0414000 Masonry Accessories m<br />
0409100000 Control Joint Sealants m<br />
0409200000 Embedded Flashing m<br />
0409300000 Expansion Joint Materials m<br />
0409400000 Weepholes m<br />
0420000000 Masonry Units LS<br />
0421000000 Brick m2<br />
0421100000 Brick ea<br />
0421200000 Building Brick ea<br />
0421300000 Ceramic Glazed Clay Masonry ea<br />
0421400000 Clay Tile m2<br />
0421500000 Facing Brick m2<br />
0421600000 Structural Clay Tile m2<br />
0421700000 Glazed Structural Clay Tile m2<br />
0421800000 Terra Cotta m2<br />
0422000000 Concrete Block m2<br />
0422100000 Concrete Block ea<br />
0422200000 Exposed Aggregate Concrete Block ea<br />
0422300000 Fluted Concrete Block ea<br />
0422400000 Interlocking Concrete Block ea<br />
0422500000 Molded Face Concrete Block ea<br />
0422600000 Prefaced Concrete Block ea<br />
0422700000 Preinsulated Concrete Block ea<br />
0422800000 Sound Absorbing Concrete Block ea<br />
0422900000 Split Faced Concrete Block ea<br />
0423000000 Calcium Silicate Masonry Units m2<br />
0423100000 Calcium Silicate Brick ea<br />
0423200000 Calcium Silicate Block ea<br />
0427000000 Glass Masonry Units m2<br />
0427100000 Glass Brick ea<br />
0427200000 Glass Block ea<br />
0429000000 Adobe Masonry Units m2<br />
0429100000 Adobe Brick Thousand<br />
0429200000 Adobe Block ea<br />
0440000000 Stone t<br />
0441000000 Stone Materials t<br />
0441100000 Blue Stone t<br />
0441200000 Granite t<br />
0441300000 Limestone t<br />
0441400000 Marble t<br />
0441500000 Quartzite t<br />
0441600000 Sandstone t<br />
0441700000 Slate t<br />
0442000000 Collected Stone t<br />
0442100000 Excavated Stone t<br />
0442200000 Field Stone t<br />
0442300000 Riverbed Stone t<br />
0443000000 Quarried Stone t<br />
0443100000 Cleft Face Stone t<br />
0443200000 Crushed Masonry Stone t<br />
03/01/2009 1:04:57 PM Page No 4 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0443300000 Dimension Stone t<br />
0460000000 Corosion Resistant Masonry m2<br />
0461000000 Chemical Resistant Brick ea<br />
0462000000 Vitrified Clay Liner Plates m2<br />
0470000000 Simulated Masonry m2<br />
0471000000 Simulated Brick m2<br />
0472000000 Simulated Cast Stone m2<br />
0473000000 Simulated Stone m2<br />
0480000000 Masonry Assemblies m2<br />
0481000000 Unit Masonry Assemblies m2<br />
0481100000 Cavity Walls m2<br />
0481200000 Composite Unit Masonry m2<br />
0481300000 Masonry Veneer m2<br />
0481400000 Multiple-Wythe Unit Masonry m2<br />
0481500000 Single-Wythe Unit Masonry m2<br />
0481600000 Surface- Bonded Masonry m2<br />
0481700000 Thin Brick Veneer m2<br />
0484000000 Prefabricated Masonry Panels m2<br />
0485000000 Stone Assemblies m2<br />
0485100000 Dry-Placed Stone Assemblies m2<br />
0485200000 Metal Supported Stone Assemblies m2<br />
0485300000 Mortar Placed Stone Assemblies m2<br />
0485400000 Stone-Clad Precast Concrete m2<br />
0485500000 Stone Curtain Wall Assemblies m2<br />
0488000000 Masonry Fireplaces m2<br />
0488100000 Brick Fireplace m2<br />
0488200000 Stone Fireplaces m2<br />
0490000000 Masonry Restoration LS<br />
0491000000 Unit Masonry Restoration m2<br />
0491100000 Unit Masonry Repair ea<br />
0491200000 Unit Masonry Replacement ea<br />
0491300000 Unit Masonry Repointing ea<br />
0492000000 Stone Restoration m2<br />
0492100000 Stone Repair ea<br />
0492200000 Stone Replacement ea<br />
0492300000 Stone Repointing ea<br />
0493000000 Unit Masonry Cleaning m2<br />
0493100000 Water Blast Brick m2<br />
0493200000 Sand Blast Brick m2<br />
0494000000 Stone Cleaning m2<br />
0494100000 Water Blast Stone m2<br />
0494200000 Sand Blast Stone m2<br />
0500000000 Metals m2<br />
0510000000 Structural Metals LS<br />
0511000000 Anchor Bolts kg<br />
0511100000 Anchors Bolts for Gates & Trash Racks kg<br />
0511200000 Anchors Bolts Heavy Structural Steel kg<br />
0511300000 Anchor Bolts Light Steel ea<br />
0512000000 Building Structural Steel t<br />
0512100000 Building Structural Steel t<br />
0512200000 Industrial Structural Steel t<br />
0512300000 Heavy Structural Steel t<br />
0512310000 Gates t<br />
0512320000 Gate Guides t<br />
0512330000 Trashracks t<br />
0512340000 Crane Rail Steel t<br />
0512350000 Powerhouse Structural Steel t<br />
0513000000 Bridge Structural Steel t<br />
0513310000 Fabricate Structural Steel t<br />
0513320000 Deliver Structural Steel t<br />
0513330000 Erect Structural Steel t<br />
0513331000 Erect Teardown Falsework LS<br />
0513332000 Mobe Demobe Crane ea<br />
0513333000 Handle Steel t<br />
0513334000 Erect Steel t<br />
0513340000 Coat New Structural Steel t<br />
0514000000 Structural Aluminum kg<br />
0514100000 Load Bearing Aluminum Stud Walls m2<br />
0514200000 Structural Aluminum Trusses kg<br />
0515000000 Wire Rope Assemblies m<br />
0515100000 Steel Wire Rope Assemblies m<br />
03/01/2009 1:04:57 PM Page No 5 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0515200000 Aluminum Wire Rope Assemblies m<br />
0516000000 Metal Framing Systems t<br />
0516100000 Geodesic <strong>Structure</strong>s t<br />
0516200000 Space Frames t<br />
0520000000 Metal Joists m<br />
0521000000 Steel Joists t<br />
0521100000 Deep Longspan Steel Joists t<br />
0521200000 Longspan Steel Joists t<br />
0521300000 Open Web Steel Joists t<br />
0521400000 Steel Joist Girders t<br />
0525000000 Aluminum Joists kg<br />
0525100000 Open Web Aluminum Joists kg<br />
0525200000 Aluminum Joist Girders kg<br />
0526000000 Composite Joists m<br />
0526100000 Built In Place Joist Assemblies m<br />
0526200000 Prefabricated Joist Assemblies m<br />
0530000000 Metal Deck m2<br />
0531000000 Steel Deck m2<br />
0531100000 Composite Metal Deck m2<br />
0531200000 Steel Floor Deck m2<br />
0531300000 Steel Roof Deck m2<br />
0532000000 Raceway Deck Systems m2<br />
0532100000 Raceway Floor Deck m2<br />
0532200000 Raceway Roof Deck m2<br />
0533000000 Aluminum Deck m2<br />
0533100000 Aluminum Floor Deck m2<br />
0533200000 Aluminum Roof Deck m2<br />
0534000000 Acoustical Metal Deck m2<br />
0535000000 Stay in Place Deck Pans m2<br />
0540000000 Cold Formed Metal Framing LS<br />
0541000000 Load Bearing Metal Stud Walls m2<br />
0541100000 Build In Place Metal Stud Walls m2<br />
0541200000 Prefabricated Metal Stud Walls m2<br />
0542000000 Cold Formed Metal Joists m<br />
0542100000 Cold Formed Floor Joists m<br />
0542200000 Cold Formed Roof Joists m<br />
0543000000 Slotted Channel Framing m2<br />
0543100000 Built-In Place Slotted Channel Framing m2<br />
0543200000 Prefabricated Slotted Channel Framing m2<br />
0545000000 Miscellaneous Metal Support kg<br />
0550000000 Metal Fabrications LS<br />
0551000000 Miscellaneous Metal kg<br />
0551100000 Preassembled Stairs m2<br />
0551200000 Catwalks m<br />
0551300000 Ladders m<br />
0551400000 Ships Ladders m<br />
0551500000 Fire Escapes m<br />
0551600000 Embedded Metal kg<br />
0551610000 Embedded Metal Ducts KG<br />
0551620000 Embedded Steel Gate Guides & Trash Racks KG<br />
0551630000 Embedded Metal Pipe KG<br />
0551640000 Embedded Structural Steel KG<br />
0552000000 Handrails m<br />
0552100000 Pipe & Tube Railings m<br />
0552200000 Tempered Glass Railing Assemblies m<br />
0553000000 Gratings m2<br />
0553100000 Metal Floor Gratings m2<br />
0553200000 Metal Traffic Gratings m2<br />
0554000000 Metal Traffic Plates m2<br />
0554100000 Metal Floor Plates m2<br />
0554200000 Metal Plates In Paving m2<br />
0555000000 Metal Protection m2<br />
0555100000 Metal Stair Treads & Nosings m<br />
0555200000 Wall Corner Protection m<br />
0555300000 Pier Nosings m2<br />
0556000000 Metal Castings ea<br />
0556100000 Metal Deck Drains ea<br />
0556200000 Manhole Covers ea<br />
0556300000 Catchbasin Grates ea<br />
0558000000 Formed Metal Fabrications m2<br />
0558100000 Column Covers m2<br />
03/01/2009 1:04:57 PM Page No 6 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0558200000 Formed Metal Enclosures m2<br />
0558300000 Custom Heating Enclosures m2<br />
0559000000 Access Hatches ea<br />
0560000000 Hydraulic Fabrications & Railway Track LS<br />
0561000000 Bifurcation Panels m2<br />
0562000000 Bulkheads m2<br />
0563000000 Manifolds m<br />
0564000000 Penstocks m<br />
0565000000 Gates ea<br />
0565100000 Intake Gates ea<br />
0565200000 Gate Guides t<br />
0566000000 Rail Track & Accessories m<br />
0566100000 Rail Track m<br />
0566200000 Turnouts ea<br />
0566300000 Switchgear ea<br />
0570000000 Ornamental Metals LS<br />
0571000000 Ornamental Stairs m2<br />
0571100000 Fabricated Ornamental Stairs m2<br />
0571200000 Fabricated Spiral Stairs m2<br />
0572000000 Ornamental Railings m<br />
0572100000 Ornamental Handrails m<br />
0572200000 Ornamental Railings m<br />
0573000000 Ornamental Metals kg<br />
0573100000 Ornamental Metal Castings ea<br />
0573200000 Ornamental Formed Metal kg<br />
0573300000 Ornamental Forged Metal kg<br />
0580000000 Expansion Control m<br />
0581000000 Expansion Joint Assemblies m<br />
0581100000 Elastomeric Joint Assemblies m<br />
0581200000 Metal Plate Cover Assemblies m<br />
0581300000 Strip Seal Floor Joints m<br />
0581400000 Gasket Assemblies m<br />
0581500000 Watertest Joints m<br />
0581600000 Modular Expansion Joint Assemblies m<br />
0581700000 Cycle Joints m<br />
0582000000 Bearings ea<br />
0582100000 Pot Bearings EA<br />
0582200000 Elastomeric Bearings EA<br />
0582300000 Sliding Bearings EA<br />
0582400000 Sole Plates EA<br />
0584000000 Neoprene Pads ea<br />
0590000000 Metal Restoration LS<br />
0591000000 Metal Restoration m2<br />
0591100000 Exposed Joist Restoration m2<br />
0591200000 Bridge Girder Restoration m2<br />
0592000000 Metal Cleaning m2<br />
0592100000 Pressure Water Blast Steel m2<br />
0592200000 Sand Blast Steel m2<br />
0592300000 Grind Steel m2<br />
0600000000 Wood & Plastics m2<br />
0610000000 Rough Carpentry m3<br />
0611000000 Wood Framing m2<br />
0611100000 Exterior Wall Framing m2<br />
0611200000 Interior Wall Framing m2<br />
0611300000 Floor Framing m2<br />
0611400000 Roof Framing m2<br />
0612000000 Structural Wood Panels m2<br />
0612100000 Stressed Skin Panels m2<br />
0612200000 Cementitious Reinforced Panels m2<br />
0613000000 Heavy Timber Construction BF<br />
0613100000 Log <strong>Structure</strong>s m3<br />
0613200000 Pole Construction m<br />
0613300000 Railway Ties ea<br />
0613400000 Timber Bridges & Trestles m3<br />
0613500000 Timber Decks m3<br />
0613600000 Timber Trusses m3<br />
0614000000 Treated Wood Foundations m2<br />
0614100000 Timber Crib Foundation m2<br />
0614200000 Timber Basement m2<br />
0615000000 Wood Decking m2<br />
0615100000 Residential Wood Deck m2<br />
03/01/2009 1:04:57 PM Page No 7 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0615200000 Wood Deck Walkways m2<br />
0616000000 Sheathing m2<br />
0616100000 Insulated Sheathing m2<br />
0616200000 Subflooring m2<br />
0616300000 Underlayment m2<br />
0616400000 Wood Board Sheathing m2<br />
0616500000 Wood Panel Product Sheathing m2<br />
0617000000 Prefabricated Structural Wood m<br />
0617200000 Metal-Web Wood Joists m<br />
0617400000 Prefabricated Wood Joists m<br />
0617500000 Wood Trusses m<br />
0617600000 Pre-Insulated Wood Panels m2<br />
0618000000 Glue-Laminated Construction m<br />
0618100000 Glue-Laminated Columns m<br />
0618200000 Glue-Laminated Beams m<br />
0619000000 Wood Furring m2<br />
0619100000 Furring To Wood m2<br />
0619200000 Furring To Concrete m2<br />
0620000000 Finish Carpentry LS<br />
0622000000 Millwork LS<br />
0622100000 Standard Floor Trim m<br />
0622200000 Standard Window & Door Trim m<br />
0622300000 Standard Ceiling Trim m<br />
0622400000 Custom Millwork LS<br />
0625000000 Prefinished Paneling m2<br />
0626000000 Board Paneling m2<br />
0627000000 Wood Shelving m2<br />
0627100000 Closet Shelving m2<br />
0627200000 Utility Shelving m2<br />
0640000000 Architectural Woodwork LS<br />
0641000000 Custom Cabinets ea<br />
0641100000 Laminate-Clad Wood Cabinets ea<br />
0641200000 Opaque-Finish Wood Cabinets ea<br />
0641300000 Transparent-Finish Wood Cabinets ea<br />
0641500000 Countertops m2<br />
0641510000 Plastic Countertops m2<br />
0641520000 Metal Countertops m2<br />
0641530000 Wood Countertops m2<br />
0641540000 Laminate-Clad Countertops m2<br />
0642000000 Architectural Wood Paneling m2<br />
0642100000 Solid Lumber Paneling m2<br />
0642200000 Wood-Veneer Paneling m2<br />
0642300000 Plastic Laminate Paneling m2<br />
0643000000 Wood Stairs & Railings m<br />
0643100000 Wood Stairs m2<br />
0643200000 Wood Handrails m<br />
0643300000 Wood Balusters m<br />
0643400000 Wood Newal Posts ea<br />
0644000000 Wood Ornaments ea<br />
0644100000 Wood Posts & Columns ea<br />
0644200000 Wood Grilles ea<br />
0644300000 Wood Ornaments ea<br />
0644400000 Wood Balusters m<br />
0644500000 Wood Mantels m<br />
0644600000 Wood Corbels m<br />
0645000000 Archtectural Wood Trim m<br />
0645100000 Door & Window Casings m<br />
0645200000 Wood Aprons m<br />
0645300000 Wood Base & Shoe Molding m<br />
0645400000 Wood Chair Rail m<br />
0645500000 Wood Cornices m<br />
0645600000 Wood Facias & Soffits m<br />
0645700000 Wood Stops m<br />
0645800000 Wood Sills m<br />
0646000000 Wood Frames ea<br />
0646100000 Exterior Wood Door Frames ea<br />
0646200000 Interior Wood Door Frames ea<br />
0646300000 Ornamental Wood Frames ea<br />
0646400000 Wood Veneer Frames ea<br />
0647000000 Screens Blinds & Shutters m2<br />
0647100000 Wood Screens m2<br />
03/01/2009 1:04:57 PM Page No 8 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0647200000 Wood Blinds m2<br />
0647300000 Wood Shutters m2<br />
0650000000 Structural Plastics LS<br />
0651000000 Structural Plastic Shapes LS<br />
0651100000 Plastic Lumber m<br />
0651200000 Structural Tubular Plastic m<br />
0652000000 Plastic Structural Assemblies LS<br />
0660000000 Plastic Fabrications LS<br />
0661000000 Cultured Marble m2<br />
0662000000 Glass Fibre Reinforced Plastic m2<br />
0663000000 Plastic Handrails m<br />
0664000000 Plastic Paneling m2<br />
0665000000 Solid Surfacing m2<br />
0690000000 Wood & Plastic Restoration LS<br />
0691000000 Wood Restoration & Cleaning m2<br />
0691100000 Woodwork Polishing m2<br />
0691200000 Woodwork Refinishing m2<br />
0691300000 Woodwork Restoration m2<br />
0692000000 Plastic Restoration & Cleaning m2<br />
0700000000 Thermal & Moisture Protection m2<br />
0710000000 Waterproofing m2<br />
0711000000 Dampproofing m2<br />
0711100000 Bituminous Damproofing m2<br />
0711200000 Cementitious Damproofing m2<br />
0712000000 Built-Up Bituminous Waterproofing m2<br />
0712100000 Built-Up Asphalt Waterproofing m2<br />
0712200000 Built-Up Coal Tar Waterproofing m2<br />
0713000000 Sheet Waterproofing m2<br />
0713100000 Bridge Deck Waterprooking m2<br />
0713200000 Bituminous Sheet Waterproofing m2<br />
0713300000 Elastomeric Sheet Waterproofing m2<br />
0713400000 Thermoplastic Sheet Waterproofing m2<br />
0713500000 Membrane Reinforcement m<br />
0714000000 Fluid-Applied Waterproofing m2<br />
0714100000 Bituminous Waterproofing m2<br />
0714200000 Cementitious Waterproofing m2<br />
0715000000 Sheet Metal Waterproofing m2<br />
0715100000 Standing Seam Sheetmetal Waterproofing m2<br />
0715200000 Batten Seam Sheetmetal Waterproofing m2<br />
0715300000 Flat Seam Sheetmetal Waterproofing m2<br />
0716000000 Cementitious & Reactive Waterproofing m2<br />
0716100000 Acrylic Modified Cement Waterproofing m2<br />
0716200000 Crystalline Waterproofing m2<br />
0716300000 Metal Oxide Waterproofing m2<br />
0717000000 Bentonite Waterproofing m2<br />
0717100000 Bentonite Panel Waterproofing m2<br />
0717200000 Bentonite Sheet Waterproofing m2<br />
0718000000 Traffic Coatings m2<br />
0718100000 Pedestrian Traffic Coating m2<br />
0718200000 Vehicular Traffic Coating m2<br />
0719000000 Water Repellents m2<br />
0719100000 Acrylic Water Repellent m2<br />
0719200000 Silane Water Repellent m2<br />
0719300000 Silicone Water Repellent m2<br />
0719400000 Siloxane Water Repellent m2<br />
0719500000 Stearate Water Repellent m2<br />
0720000000 Thermal Protection m2<br />
0721000000 Building Insulation m2<br />
0721100000 Rigid Insulation m2<br />
0721200000 Batt Insulation m2<br />
0721300000 Blown Insulation m2<br />
0721400000 Spray On Insulation m2<br />
0722000000 Roof & Deck Insulation m2<br />
0722100000 Rigid Roof Insulation m2<br />
0722200000 Rigid Sloped Roof Insulation m2<br />
0722300000 Asphalt Perlite Concrete Deck m2<br />
0724000000 Exterior Insulation & Finish Systems m2<br />
0724100000 Pre-Fabricated Outsulation Panels m2<br />
0724200000 Build In Place Outsulation Panels m2<br />
0726000000 Vapor Retarders m2<br />
0726100000 Plastic Vapor Retarders m2<br />
03/01/2009 1:04:57 PM Page No 9 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0726200000 Bituminous Vapor Retarders m2<br />
0726300000 Laminated Vapor Retarders m2<br />
0727000000 Air Barriers m2<br />
0727100000 Reinforced Rubber Air Barriers m2<br />
0727200000 Sheet Metal Air Barriers m2<br />
0727300000 Plastic Sheet Air Barriers m2<br />
0727400000 Board Air Barriers m2<br />
0727500000 Sealant Air Barriers m2<br />
0727600000 Cement Parged Air Barriers m2<br />
0730000000 Shingles & Roof Tiles m2<br />
0731000000 Shingles m2<br />
0731100000 Asphalt Shingles m2<br />
0731200000 Fiberglass Reinforced Shingles m2<br />
0731300000 Metal Shingles m2<br />
0731400000 Mineral Fiber Cement Shingles m2<br />
0731500000 Plastic Shake Shingles m2<br />
0731600000 Porcelain Enamel Shingles m2<br />
0731700000 Slate Shingles m2<br />
0731800000 Wood Shingles LS<br />
0731900000 Wood Shakes LS<br />
0732000000 Roof Tiles m2<br />
0732100000 Clay Roof Tiles m2<br />
0732200000 Concrete Roof Tiles m2<br />
0732300000 Metal Roof Tiles m2<br />
0732400000 Mineral Fiber Cement Roof Tiles m2<br />
0732500000 Plastic Roof Tiles m2<br />
0733000000 Roof Coverings m2<br />
0733100000 Sod Roofing m2<br />
0733200000 Thatched Roofing m2<br />
0740000000 Roofing & Siding Panels m2<br />
0741000000 Metal Roof & Wall Panels m2<br />
0741100000 Metal Roof Panels m2<br />
0741200000 Metal Wall Panels m2<br />
0742000000 Plastic Roof & Wall Panels m2<br />
0742100000 Plastic Roof Panels m2<br />
0742200000 Plastic Wall Panels m2<br />
0743000000 Composite Panels m2<br />
0744000000 Faced Panels m2<br />
0744100000 Aggregate Coated Panels m2<br />
0744200000 Porcelain Enameled Faced Panels m2<br />
0744300000 Tile Faced Panels m2<br />
0746000000 Siding m2<br />
0746100000 Aluminum Siding m2<br />
0746200000 Composition Siding m2<br />
0746300000 Hardboard Siding m2<br />
0746400000 Mineral Fiber Cement Siding m2<br />
0746500000 Plastic Siding m2<br />
0746600000 Plywood Siding m2<br />
0746700000 Steel Siding m2<br />
0746800000 Wood Siding m2<br />
0747000000 Wood Roof & Wall Panels m2<br />
0747100000 Wood Roof Panels m2<br />
0747200000 Wood Wall Panels m2<br />
0750000000 Membrane Roofing m2<br />
0751000000 Built-Up Bituminous Roofing m2<br />
0751100000 Built-Up Asphalt Roofing m2<br />
0751200000 Built-Up Coal-Tar Roofing m2<br />
0752000000 Cold-Applied Bituminous Roofing m2<br />
0752100000 Cold-Applied Mastic Roof Membrane m2<br />
0752200000 Glass-Fiber-Reinforced Asphalt Emulsion Roofing m2<br />
0753000000 Elastomeric Membrane Roofing m2<br />
0753100000 Chlorinated Polyethylene Roofing (Cpe) m2<br />
0753200000 Chlorosulfonated Polyethylene Roofing (Cspe) m2<br />
0753300000 Copolymer Alloy (Cpa) Roofing m2<br />
0753400000 Ethylene Propylene Diene Monomer (Eddm) Roofing m2<br />
0753500000 Nitrile Butadiene Polymer (Nbp) Roofing m2<br />
0753600000 Polyisobutylene (Pib) Roofing m2<br />
0754000000 Thermoplastic Membrane Roofing m2<br />
0754100000 Ethylene Interpolymer (Eip) Roofing m2<br />
0754200000 Polyvinyl Chloride (Pvc) Roofing m2<br />
0754300000 Thermoplastic Alloy (Tpa) Roofing m2<br />
03/01/2009 1:04:57 PM Page No 10 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0755000000 Modified Bituminous Membrane Roofing m2<br />
0756000000 Fluid Applied Roofing m2<br />
0757000000 Coated Foamed Roofing m2<br />
0758000000 Roll Roofing m2<br />
0759000000 Roof Maintenance & Repairs m2<br />
0759100000 Roof Maintenance SM<br />
0759200000 Roof Moisture Survey SM<br />
0759300000 Roofing Resaturants SM<br />
0759400000 Roofing Restoration SM<br />
0760000000 Flashing & Sheet Metal m2<br />
0761000000 Sheetmetal Roofing m2<br />
0761100000 Copper Roofing m2<br />
0761200000 Lead Roofing m2<br />
0761300000 Monel Roofing m2<br />
0761400000 Stainless Steel Roofing m2<br />
0761500000 Zinc Roofing m2<br />
0762000000 Sheetmetal Flashing & Trim m2<br />
0762100000 Formed Gutters m<br />
0762200000 Formed Downspouts m<br />
0762300000 Formed Scuppers m<br />
0762400000 Formed Gravel Stops m<br />
0762500000 Formed Expansion Joint Covers m<br />
0762600000 Pitch Pans m<br />
0762700000 Plumbing Drain Flashing m<br />
0762800000 Diverters m<br />
0763000000 Sheetmetal Specialties m2<br />
0765000000 Flexible Flashing m2<br />
0765100000 Laminated Sheet Flashing m2<br />
0765200000 Bituminous Sheet Flashing m2<br />
0765300000 Plastic Sheet Flashing m2<br />
0765400000 Rubber Sheet Flashing m2<br />
0765500000 Self-Adhered Sheet Flashing m2<br />
0770000000 Roof Specialties LS<br />
0771000000 Manufactured Roof Specialties LS<br />
0771100000 Copings m<br />
0771200000 Counterflashing Systems m<br />
0771300000 Gravel Stops & Facias m<br />
0771400000 Gutters & Downspouts m<br />
0771500000 Reglets m<br />
0771600000 Roof Expansion Assemblies ea<br />
0771700000 Scuppers m<br />
0772000000 Roof Accessories ea<br />
0772100000 Manufactured Curbs m<br />
0772200000 Relief Vents ea<br />
0772300000 Ridge Vents ea<br />
0772400000 Roof Hatches ea<br />
0772500000 Roof Walk Boards m2<br />
0772600000 Roof Walkways m2<br />
0772700000 Smoke Vents ea<br />
0772800000 Snow Guards ea<br />
0772900000 Waste Containment Assemblies ea<br />
0776000000 Roof Pavers m2<br />
0776100000 Roof Ballast Pavers m2<br />
0776200000 Roof Decking Pavers m2<br />
0780000000 Fire Protection LS<br />
0781000000 Applied Fireproofing m2<br />
0781100000 Cement Aggregate Fireproofing m2<br />
0781200000 Cementitious Fireproofing m2<br />
0781300000 Foamed Magnesium Oxychloride Fireproofing m2<br />
0781400000 Intumescent Mastic Fireproofing m2<br />
0781500000 Magnesium Cement Fireproofing m2<br />
0781600000 Mineral Fiber Cementitious Fireproofing m2<br />
0781700000 Mineral Fiber Fireproofing m2<br />
0782000000 Board Fireproofing m2<br />
0782100000 Calcium Silicate Board Fireproofing m2<br />
0782200000 Slag Fiber Board Fireproofing m2<br />
0784000000 Firestopping LS<br />
0784100000 Annular Space Protection m3<br />
0784200000 Fibrous Fire Safing LS<br />
0784300000 Fire-Resistant Joint Sealants m<br />
0784400000 Intumescent Firestopping Foams m3<br />
03/01/2009 1:04:57 PM Page No 11 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0784500000 Silicone Firestopping Foams m3<br />
0784600000 Thermal Barriers For Plastics m2<br />
0784700000 Firestopping Mortars m3<br />
0784800000 Firestopping Pillows m3<br />
0786000000 Smoke Seals m<br />
0787000000 Smoke Containment Barriers m2<br />
0790000000 Joint Sealers m<br />
0791000000 Preformed Joint Seals m<br />
0791100000 Compression Seals m<br />
0791200000 Joint Gaskets m<br />
0792000000 Joint Sealants m<br />
0792100000 Backer Rods m<br />
0792200000 Calking m<br />
0792300000 Joint Fillers m<br />
0792400000 Sealants m<br />
0800000000 Openings m2<br />
0810000000 Metal Doors & Frames ea<br />
0811000000 Steel Doors & Frames ea<br />
0811100000 Hollow Metal Steel Doors & Frames ea<br />
0811200000 Hollow Core Steel Doors & Frames ea<br />
0811300000 Half Glass Steel Doors & Frames ea<br />
0811400000 Insulated Steel Doors & Frames ea<br />
0812000000 Alumimum Doors & Frames ea<br />
0812100000 Aluminum Frames ea<br />
0812200000 Aluminum Doors ea<br />
0813000000 Stainless Steel Doors & Frames ea<br />
0813100000 Stainless Steel Door Frame ea<br />
0813200000 Stainless Steel Doors ea<br />
0814000000 Bronze Doors & Frames ea<br />
0814100000 Bronze Door Frames ea<br />
0814200000 Bronze Doors ea<br />
0815000000 Preassembled Metal Door & Frame Units ea<br />
0816000000 Sliding Metal Doors & Grilles ea<br />
0818000000 Metal Screen & Storm Doors ea<br />
0818100000 Metal Screen & Door Frames ea<br />
0818200000 Metal Screens ea<br />
0818300000 Metal Doors ea<br />
0819000000 Metal Door Restoration ea<br />
0820000000 Wood & Plastic Doors ea<br />
0821000000 Wood Doors ea<br />
0821100000 Carved Wood Doors ea<br />
0821200000 Flush Wood Doors ea<br />
0821300000 Metal-Faced Wood Doors ea<br />
0821400000 Plastic-Faced Wood Doors ea<br />
0821500000 Prefinished Wood Doors ea<br />
0821600000 Stile & Rail Wood Doors ea<br />
0822000000 Plastic Doors ea<br />
0822100000 Laminated Plastic Doors ea<br />
0822200000 Solid Plastic Doors ea<br />
0825000000 Preassembled Wood & Plastic Door & Frame Units ea<br />
0825100000 Preassembled Plastic Door & Frame Units ea<br />
0825200000 Preassembled Wood Door & Frame Units ea<br />
0826000000 Sliding Wood & Plastic Doors ea<br />
0826100000 Sliding Plastic Doors ea<br />
0826200000 Sliding Wood Doors ea<br />
0828000000 Storm & Screen Doors ea<br />
0828100000 Plastic Screen Doors ea<br />
0828200000 Plastic Storm & Screen Doors ea<br />
0828300000 Plastic Storm Doors ea<br />
0828400000 Wood Screen Doors ea<br />
0828500000 Wood Storm & Screen Doors ea<br />
0828600000 Wood Storm Doors ea<br />
0829000000 Wood Door Restoration ea<br />
0829100000 Restore Wood Doors ea<br />
0829200000 Restore Plastic Doors ea<br />
0830000000 Specialty Doors ea<br />
0831000000 Access Doors & Panels ea<br />
0831100000 Access Doors & Frames ea<br />
0831200000 Access Panels & Frames ea<br />
0832000000 Detention Doors & Frames ea<br />
0832100000 Detention Door Frame Protection ea<br />
03/01/2009 1:04:57 PM Page No 12 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0832200000 Steel Detention Doors & Frames ea<br />
0832300000 Steel Plate Detention Doors & Frames ea<br />
0833000000 Coiling Doors & Grilles ea<br />
0833100000 Coiling Counter Doors ea<br />
0833200000 Coiling Counter Grilles ea<br />
0833300000 Overhead Coiling Doors ea<br />
0833400000 Overhead Coiling Grilles ea<br />
0833500000 Side Coiling Doors ea<br />
0833600000 Side Coiling Grilles ea<br />
0834000000 Special Function Doors ea<br />
0834100000 Cold Storage Doors ea<br />
0834200000 Hanger Doors ea<br />
0834300000 Lightproof Doors ea<br />
0834400000 Radiation Protection Doors ea<br />
0834500000 Radio Shielding Doors ea<br />
0834600000 Sound Control Doors ea<br />
0834700000 Industrial Doors ea<br />
0834800000 Sliding Tunnel Doors ea<br />
0835000000 Folding Doors & Grilles ea<br />
0835100000 Accordion Folding Doors ea<br />
0835200000 Accordion Folding Grilles ea<br />
0835300000 Folding Fire Doors ea<br />
0835400000 Panel Folding Doors ea<br />
0836000000 Overhead Doors ea<br />
0836100000 Sectional Overhead Doors ea<br />
0836200000 Single Panel Overhead Doors ea<br />
0837000000 Vertical Lift Doors ea<br />
0837100000 Multi-Leaf Vertical Lift Doors ea<br />
0837200000 Telescoping Vertical Lift Doors ea<br />
0838000000 Traffic Doors ea<br />
0838100000 Flexible Strip Doors ea<br />
0838200000 Flexible Traffic Doors ea<br />
0838300000 Rigid Traffic Doors ea<br />
0839000000 Pressure Resistant Doors ea<br />
0839100000 Airtight Doors ea<br />
0839200000 Blast-Resistant Doors ea<br />
0839300000 Watertight Doors ea<br />
0840000000 Entrances & Storefronts m2<br />
0841000000 Storefronts m2<br />
0841100000 Aluminum-Framed Storefronts m2<br />
0841200000 Bronze-Framed Storefronts m2<br />
0841300000 Stainless Steel Framed Storefronts m2<br />
0841400000 Steel-Framed Storefonts m2<br />
0841500000 All- Glass Storefronts m2<br />
0846000000 Operational Entrance Doors ea<br />
0846100000 Automatic Entrance Doors ea<br />
0846200000 Revolving Entrance Doors ea<br />
0846300000 Balanced Entrance Doors ea<br />
0846400000 Sliding Srorefronts ea<br />
0850000000 Windows m2<br />
0851000000 Steel Windows m2<br />
0852000000 Aluminum Windows m2<br />
0853000000 Stainless Steel Windows m2<br />
0854000000 Bronze Windows m2<br />
0855000000 Wood Windows m2<br />
0855100000 Metal-Clad Wood Windows m2<br />
0855200000 Plastic-Clad Wood Windows m2<br />
0855300000 Plain Wood Windows m2<br />
0856000000 Plastic Windows m2<br />
0856100000 Metal-Clad Plastic Windows m2<br />
0856200000 Plain Plastic Windows m2<br />
0857000000 Composite Windows m2<br />
0858000000 Special Function Windows m2<br />
0858100000 Detention Windows m2<br />
0858200000 Detention Window Screens m2<br />
0858300000 Pass Windows m2<br />
0858400000 Radiation Protection Windows m2<br />
0858500000 Radio Shielded Windows m2<br />
0858600000 Security Window Screens m2<br />
0858700000 Sound Control Windows m2<br />
0858800000 Storm Windows m2<br />
03/01/2009 1:04:57 PM Page No 13 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0859000000 Window Restoration m2<br />
0859100000 Window Restoration m2<br />
0859200000 Window Replacement m2<br />
0860000000 Skylights LS<br />
0861000000 Roof Windows m2<br />
0861100000 Metal Roof Windows m2<br />
0861200000 Wood Roof Windows m2<br />
0862000000 Unit Skylights m2<br />
0862100000 Domed Unit Skylights m2<br />
0862200000 Pyramidal Unit Skylights m2<br />
0862300000 Vaulted Unit Skylights m2<br />
0863000000 Metal Framed Skylights m2<br />
0863100000 Domed Metal-Framed Skylights m2<br />
0863200000 Motorized Metal-Framed Skylights m2<br />
0863300000 Pyramidal Metal-Framed Skylights m2<br />
0863400000 Ridge Metal-Framed Skylights m2<br />
0863500000 Vaulted Metal-Framed Skylights m2<br />
0870000000 Hardware LS<br />
0871000000 Door Hardware ea<br />
0871100000 Controlling Hardware ea<br />
0871200000 Door Trim m<br />
0871300000 Hanging Hardware ea<br />
0871400000 Latching Hardware ea<br />
0871500000 Locking Hardware ea<br />
0872000000 Weatherstripping m<br />
0872100000 Door Weatherstripping & Seals m<br />
0872200000 Thresholds m<br />
0872300000 Window Weatherstripping & Seals m<br />
0874000000 Electro-Mechanical Hardware ea<br />
0874100000 Card Key Locking Hardware ea<br />
0874200000 Electrical Locking Control ea<br />
0874300000 Electromagnetic Door Holders ea<br />
0875000000 Window Hardware ea<br />
0875100000 Automatic Window Equipment ea<br />
0875200000 Window Locks ea<br />
0875300000 Window Lifts ea<br />
0875400000 Window Operators ea<br />
0877000000 Door & Window Accessories LS<br />
0877100000 Key Storage LS<br />
0877200000 Control Equipment LS<br />
0878000000 Special Function Hardware LS<br />
0878100000 Detention Hardware LS<br />
0879000000 Hardware Restoration LS<br />
0880000000 Glazing LS<br />
0881000000 Glass m2<br />
0881100000 Bent Glass m2<br />
0881200000 Bullet Proof Glass m2<br />
0881300000 Coated Glass m2<br />
0881400000 Composite Glass m2<br />
0881500000 Decorative Glass m2<br />
0881600000 Fire Rated Glass m2<br />
0881700000 Float Glass m2<br />
0881800000 Impact Resistant Glass m2<br />
0881900000 Insulated Glass m2<br />
0882000000 Laminated Glass m2<br />
0882100000 Mirrored Glass m2<br />
0882200000 Rolled Glass m2<br />
0882300000 Tempered Glass m2<br />
0882400000 Wired Glass m2<br />
0883000000 Mirrors m2<br />
0884000000 Plastic Glazing m2<br />
0884100000 Bullet-Resistant Plastic Glazing m2<br />
0884200000 Decorative Plastic Glazing m2<br />
0884300000 Insulating Plastic Glazing m2<br />
0884400000 Translucent Plastic Glazing m2<br />
0884500000 Transparent Plastic Glazing m2<br />
0885000000 Glazing Accessories LS<br />
0885100000 Glazing Compounds LS<br />
0885200000 Setting Blocks ea<br />
0885300000 Shim Glass ea<br />
0885400000 Tape Glass m<br />
03/01/2009 1:04:57 PM Page No 14 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0885500000 Splines ea<br />
0885600000 Clips ea<br />
0886000000 Glazing Restoration m2<br />
0890000000 Curtain Wall LS<br />
0891000000 Metal Framed Curtainwall SM<br />
0891100000 Glazed Aluminum Curtain Wall SM<br />
0891200000 Glazed Bronze Curtain Wall SM<br />
0891300000 Glazed Stainless Steel Curtain Wall SM<br />
0895000000 Translucent Wall & Roof Assemblies SM<br />
0896000000 Sloped Glazing Assemblies SM<br />
0897000000 Structural Glass Curtainwalls SM<br />
0899000000 Curtanwall Restoration SM<br />
0900000000 Finishes m2<br />
0910000000 Metal Support Assemblies m2<br />
0911000000 Wall Framing m2<br />
0911100000 Metal Stud Walls m2<br />
0911200000 Galvanized Wall Furring m2<br />
0912000000 Ceiling Suspension m2<br />
0912100000 Gypsum Board Ceiling Suspension m2<br />
0912200000 Plaster Ceiling Suspension m2<br />
0913000000 Acoustic Suspension m2<br />
0913100000 Acoustic Tile Ceiling Suspension m2<br />
0913200000 Acoustic Tratement Suspension m2<br />
0920000000 Plaster & Gypsum Board m2<br />
0921000000 Gypsum Plaster m2<br />
0921100000 Gypsum Plaster m2<br />
0921200000 Perlite Plaster m2<br />
0921300000 Veneer Plaster m2<br />
0922000000 Portland Cement Stucco m2<br />
0922100000 Interior Stucco m2<br />
0922200000 Exterior Stucco m2<br />
0923000000 Plaster Fabrications m2<br />
0923100000 Glass Fibre Reinforced Plaster m2<br />
0923200000 Simulated Plaster m2<br />
0924000000 Lath m2<br />
0924100000 Gypsum Lath m2<br />
0924200000 Metal Lath m2<br />
0925000000 Gypsum Board m2<br />
0925100000 Cementitious Backing Board m2<br />
0925200000 Drywall To Walls m2<br />
0925300000 Drywall To Ceilings m2<br />
0926000000 Gypsum Board Assemblies m2<br />
0926100000 Partition Walls m2<br />
0926200000 Shaft Walls m2<br />
0927000000 Gypsum Board Accessories m2<br />
0927100000 Galvanized Corner Beads m2<br />
0927200000 Galvanized Trim m2<br />
0928000000 Plaster Restoration m2<br />
0928100000 Clean Plaster m2<br />
0928200000 Patch Plaster m2<br />
0930000000 Tile m2<br />
0931000000 Ceramic Tile m2<br />
0931100000 Ceramic Floor Tile m2<br />
0931200000 Ceramic Wall Tile m2<br />
0933000000 Quarry Tile m2<br />
0933100000 Quarry Floor Tile m2<br />
0933200000 Quarry Stair Tread Tile m2<br />
0934000000 Paver Tile m2<br />
0934100000 Porcelain Paver Ceramic Tile m2<br />
0934200000 Natural Clay Paver Ceramic Tile m2<br />
0935000000 Glass Mosaics m2<br />
0935100000 Glass Mosaic Tile m2<br />
0935200000 Glass Mosiac Tile On 12" Sheets m2<br />
0936000000 Plastic Tile m2<br />
0937000000 Metal Tile m2<br />
0937100000 Stainless Steel Tile m2<br />
0937200000 Aluminized Steel Tile m2<br />
0938000000 Cut Natural Stone Tile m2<br />
0938100000 Agglomerate Tile m2<br />
0938200000 Stone Flooring m2<br />
0938300000 Stone Wall Covering m2<br />
03/01/2009 1:04:57 PM Page No 15 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0939000000 Tile Restoration m2<br />
0939100000 Tile Repair m2<br />
0939200000 Tile Restoration m2<br />
0939300000 Tile Cleaning m2<br />
0940000000 Terrazzo m2<br />
0941000000 Cast-In-Place Terrazzo m2<br />
0941100000 Cast-In-Place Terrazzo Floors m2<br />
0941200000 Cast-In-Place Terrazzo Stairs m2<br />
0942000000 Precast Terrazzo m2<br />
0942100000 Precast Terrazzo Floor Tiles m2<br />
0942200000 Precast Terrazzo Stairs m2<br />
0943000000 Conductive Terrazzo m2<br />
0943100000 Conductive Epoxy Resin Terrazzo m2<br />
0943200000 Conductive Polyester Terrazzo m2<br />
0943300000 Conductive Plastic Matrix Terrazzo m2<br />
0944000000 Plastic Matrix Terrazzo m2<br />
0944100000 Polyacrylate Terrazzo m2<br />
0944200000 Epoxy Resin Terrazzo m2<br />
0944300000 Polyester Resin Terrazzo m2<br />
0949000000 Terrazzo Restoration m2<br />
0949100000 Clean Terrazzo m2<br />
0949200000 Repair Terrazzo m2<br />
0950000000 Ceilings m2<br />
0951000000 Acoustical Ceilings m2<br />
0951100000 Acoustical Metal Pan Ceilings m2<br />
0951200000 Acoustical Panel Ceilings m2<br />
0951300000 Acoustical Tile Ceilings m2<br />
0952000000 Specialty Ceilings m2<br />
0952100000 Integrated Ceilings m2<br />
0952200000 Linear Metal Ceilings m2<br />
0952300000 Luminous Ceilings m2<br />
0955000000 Mirror Panel Ceilings m2<br />
0956000000 Textured Ceilings m2<br />
0957000000 Linear Wood Ceilings m2<br />
0958000000 Suspended Decorative Grids m2<br />
0959000000 Ceiling Assembly Restoration m2<br />
0960000000 Floorings m2<br />
0961000000 Floor Treatment m2<br />
0961100000 Slip-Resistant Floor Treatment m2<br />
0961200000 Static-Resistant Floor Treatment m2<br />
0962000000 Specialty Flooring m2<br />
0962100000 Asphalt Plank Flooring m2<br />
0962200000 Athletic Flooring m2<br />
0962300000 Plastic-Laminate Flooring m2<br />
0963000000 Masonry Flooring m2<br />
0963100000 Brick Flooring m2<br />
0963200000 Flagstone Flooring m2<br />
0963300000 Granite Flooring m2<br />
0963400000 Marble Flooring m2<br />
0963500000 Slate Flooring m2<br />
0963600000 Stone Flooring m2<br />
0964000000 Wood Flooring m2<br />
0964100000 Cushioned Wood Flooring Assemblies m2<br />
0964200000 Mastic Set Wood Flooring Assemblies m2<br />
0964300000 Resilient Wood Flooring Assemblies m2<br />
0964500000 Wood Block Flooring m2<br />
0964600000 Wood Composition Flooring m2<br />
0964700000 Wood Parquet Flooring m2<br />
0964800000 Wood Strip Flooring m2<br />
0965000000 Resilient Flooring m2<br />
0965100000 Resilient Base & Accessories m2<br />
0965200000 Resilient Sheet Flooring m2<br />
0965300000 Resilient Tile Flooring m2<br />
0966000000 Static Control Flooring m2<br />
0966100000 Conductive Elastomeric Liquid Flooring m2<br />
0966200000 Conductive Resilient Flooring m2<br />
0966300000 Static Dissipative Resilient Flooring m2<br />
0966400000 Static Resistant Resilient Flooring m2<br />
0967000000 Fluid-Applied Flooring m2<br />
0967100000 Elastomeric Liquid Flooring m2<br />
0967200000 Epoxy-Marble Chip Flooring m2<br />
03/01/2009 1:04:57 PM Page No 16 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
0967300000 Magnesium Oxychloride Flooring m2<br />
0967400000 Mastic Fills m2<br />
0967500000 Resinous Flooring m2<br />
0967600000 Seamless Quartz Flooring m2<br />
0968000000 Carpet m2<br />
0968100000 Carpet Cushion m2<br />
0968200000 Carpet Tile m2<br />
0968300000 Indoor/Outdoor Carpet m2<br />
0968400000 Sheet Carpet m2<br />
0969000000 Flooring Restoration m2<br />
0970000000 Wall Finishes m2<br />
0971000000 Acoustical Wall Finishes m2<br />
0972000000 Wall Covering m2<br />
0972100000 Cork Wall Covering m2<br />
0972200000 Vinyl Coated Fabric Wall Covering m2<br />
0972300000 Vinyl Wall Covering m2<br />
0972400000 Wall Fabrics m2<br />
0972500000 Wallpaper m2<br />
0973000000 Wall Carpet m2<br />
0974000000 Flexible Wood Sheets m2<br />
0975000000 Stone Facing m2<br />
0976000000 Plastic Blocks m2<br />
0977000000 Special Wall Surfaces m2<br />
0979000000 Wall Finish Restoration m2<br />
0980000000 Acoustical Treatment m2<br />
0981000000 Acoustical Space Units ea<br />
0982000000 Acoustical Insulation m2<br />
0982100000 Acoustical Insulation m2<br />
0982200000 Acoustical Sealants m<br />
0983000000 Acoustical Barriers m2<br />
0984000000 Acoustical Wall Treatment m2<br />
0990000000 Paints & Coatings m2<br />
0991000000 Paints m2<br />
0991100000 Exterior Paint m2<br />
0991200000 Interior Paint m2<br />
0993000000 Stains & Transparent Finishes m2<br />
0994000000 Decorative Finishes m2<br />
0996000000 High-Performance Coatings m2<br />
0996100000 Abrasion-Resistant Coatings m2<br />
0996200000 Chemical-Resistant Coatings m2<br />
0996300000 Elastomeric Coatings m2<br />
0996400000 Fire-Resistant Paints m2<br />
0996500000 Graffiti- Resistant Coatings m2<br />
0996600000 High-Build Glazed Coatings m2<br />
0996700000 Intumescent Paints m2<br />
0996800000 Marine Coatings m2<br />
0996900000 Textured Plastic Coatings m2<br />
0997000000 Coatings For Steel m2<br />
0997100000 Storage Tank Coating Systems m2<br />
0997200000 Epoxy Coating Systems m2<br />
0997300000 Paint Structural Steel m2<br />
0997400000 Paint Steel Pipe m2<br />
0998000000 Masonry & Concrete Coatings m2<br />
0998100000 Interior Cementitious Coating m2<br />
0998200000 Exterior Cementitious Coating m2<br />
0999000000 Paint Restoration m2<br />
1000 Facility Equipment LS<br />
1000000000 Specialties m2<br />
1010000000 Visual Display Boards ea<br />
1011000000 Chalkboards ea<br />
1011100000 Fixed Chalkboards ea<br />
1011200000 Operable Chalkboards ea<br />
1011300000 Portable Chalkboards ea<br />
1011500000 Markerboards ea<br />
1011600000 Electronic Markerboards ea<br />
1011700000 Fixed Markerboards ea<br />
1011800000 Operable Markerboards ea<br />
1011900000 Portable Markerboards ea<br />
1012000000 Tackboards ea<br />
1013000000 Operable Board Units ea<br />
03/01/2009 1:04:57 PM Page No 17 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1014000000 Display Track Assemblies ea<br />
1014500000 Visual Aid Board Units ea<br />
1015000000 Compartments & Cubicles ea<br />
1016000000 Metal Toilet Compartments ea<br />
1016500000 Plastic Laminate Toilet Compartments ea<br />
1017000000 Plastic Toilet Compartments ea<br />
1017500000 Particleboard Compartments ea<br />
1018000000 Stone Toilet Compartments ea<br />
1018500000 Shower Compartments ea<br />
1019000000 Cubicles ea<br />
1019100000 Cubicle Curtains ea<br />
1019200000 Cubicle Track & Hardware ea<br />
1020000000 Louvres & Vents LS<br />
1021000000 Wall Louvers ea<br />
1021100000 Motorized Louvers LS<br />
1021200000 Operable Louvers LS<br />
1021300000 Stationary Louvers LS<br />
1021400000 Soffit Vents LS<br />
1021500000 Wall Vents LS<br />
1022000000 Louvered Equipment Enclosures ea<br />
1022500000 Door Louvers ea<br />
1023000000 Vents ea<br />
1023100000 Soffit Vents ea<br />
1023200000 Motorized Louvers ea<br />
1023300000 Wall Vents ea<br />
1023400000 Operable Louvers ea<br />
1023500000 Stationary Louvers ea<br />
1024000000 Grilles & Screens m2<br />
1025000000 Service Walls m2<br />
1025100000 Wall Mounted Units m2<br />
1025200000 Patient Headwalls m2<br />
1026000000 Wall & Corner Guards m<br />
1026100000 Bumper Guards m<br />
1026200000 Corner Guards m<br />
1026300000 Impact Resistant Wall Protection m<br />
1027000000 Access Flooring m2<br />
1027100000 Rigid Grid Access Flooring m2<br />
1027200000 Snap-On Stringer Access Flooring m2<br />
1027300000 Stringerless Access Flooring m2<br />
1029000000 Pest Control LS<br />
1029100000 Bird Control LS<br />
1029200000 Insect Control LS<br />
1029300000 Rodent Control LS<br />
1030000000 Fireplaces & Stoves ea<br />
1030500000 Manufactured Fireplaces ea<br />
1030510000 Manufactured Fireplace Chimneys ea<br />
1030520000 Manufactured Fireplace Forms ea<br />
1030530000 Fireplace Dampers ea<br />
1030540000 Fireplace Inserts ea<br />
1030550000 Fireplace Screens & Doors ea<br />
1030560000 Fireplace Water Heaters ea<br />
1031000000 Fireplace Specialties LS<br />
1031100000 Manufactured Fireplace Chimneys ea<br />
1031200000 Manufactured Fireplace Forms ea<br />
1031300000 Fireplace Dampers ea<br />
1031400000 Fireplace Inserts ea<br />
1031500000 Fireplace Screens & Doors ea<br />
1031600000 Fireplace Water Heaters ea<br />
1032000000 Stoves ea<br />
1033000000 Fireplace Restoration ea<br />
1034000000 Manufactured Exterior Specialties LS<br />
1034100000 Manufactured Specialties ea<br />
1034110000 Clocks ea<br />
1034120000 Cupolas ea<br />
1034130000 Spires ea<br />
1034140000 Steeples ea<br />
1034150000 Weathervanes ea<br />
1034200000 Restore Specialties LS<br />
1035000000 Flagpoles ea<br />
1035100000 Automatic Flagpoles ea<br />
1035200000 Ground Set Flagpoles ea<br />
03/01/2009 1:04:57 PM Page No 18 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1035400000 Wall-Mounted Flagpoles ea<br />
1040000000 Identification Devices LS<br />
1041000000 Directories ea<br />
1042000000 Plaques ea<br />
1043000000 Exterior Signage LS<br />
1043100000 Exterior Dimensional Letters ea<br />
1043200000 Exterior Electronic Message Signage ea<br />
1043300000 Exterior Post And Panel Signage ea<br />
1043400000 Illuminated Exterior Signage ea<br />
1043500000 Non-Illuminated Exterior Signage ea<br />
1044000000 Interior Signage LS<br />
1044200000 Illuminated Interior Signage ea<br />
1044300000 Interior Dimensional Letters ea<br />
1044400000 Interior Door Signage ea<br />
1044500000 Interior Electronic Message Signage ea<br />
1044600000 Non-Illuminated Interior Signage ea<br />
1045000000 Pedestrian Control Devices LS<br />
1045100000 Counting Devices ea<br />
1045200000 Portable Railings LM<br />
1045300000 Rotary Gates ea<br />
1045400000 Turnstiles ea<br />
1050000000 Lockers ea<br />
1050100000 Coin Operated Lockers ea<br />
1050200000 Glass Lockers ea<br />
1050300000 Metal Lockers ea<br />
1050400000 Laminate Faced Lockers ea<br />
1050500000 Plastic Lockers ea<br />
1050600000 Wood Lockers ea<br />
1052000000 Fire Protection Specialties LS<br />
1052100000 Fire Blankets & Cabinets ea<br />
1052200000 Fire Extinguisher Accessories ea<br />
1052300000 Fire Extinguisher Cabinets ea<br />
1052400000 Fire Extinguishers ea<br />
1052500000 Wheeled Fire Extinguishers ea<br />
1053000000 Protective Covers m2<br />
1053100000 Awnings m2<br />
1053200000 Canopies m2<br />
1053300000 Car Shelters m2<br />
1053400000 Walkway Coverings m2<br />
1055000000 Postal Specialties LS<br />
1055100000 Central Mail Boxes ea<br />
1055200000 Collection Mail Boxes ea<br />
1055300000 Delivery Mail Boxes ea<br />
1055400000 Mail Chutes ea<br />
1060000000 Partitions m2<br />
1060500000 Wire Mesh Partitions m2<br />
1061000000 Folding Gates m2<br />
1061500000 Demountable Partitions m2<br />
1061510000 Demountable Gypsum Board Partitions m2<br />
1061520000 Demountable Metal Partitions m2<br />
1061530000 Demountable Wood Partitions m2<br />
1061540000 Accordion Folding Partitions m2<br />
1061550000 Coiling Partitions m2<br />
1061560000 Folding Panel Partitions m2<br />
1061570000 Sliding Partitions m2<br />
1063000000 Portable Partitions m2<br />
1065000000 Operable Partitions m2<br />
1061600000 Demountable Gypsum Board Partitions m2<br />
1061700000 Demountable Metal Partitions m2<br />
1061800000 Demountable Wood Partitions m2<br />
1065100000 Accordion Folding Partitions m2<br />
1065200000 Coiling Partitions m2<br />
1065300000 Folding Panel Partitions m2<br />
1065400000 Sliding Partitions m2<br />
1067000000 Storage Shelving LS<br />
1067100000 Metal Storage Shelves m2<br />
1067200000 Mobile Storage Units ea<br />
1067300000 Prefabricated Wood Shelving m2<br />
1067400000 Plastic Shelving m2<br />
1067500000 Wire Storage Shelving m2<br />
1070000000 Exterior Protection m2<br />
03/01/2009 1:04:57 PM Page No 19 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1070500000 Exterior Sun Control m2<br />
1071000000 Exterior Shutters m2<br />
1071500000 Storm Panels m2<br />
1072000000 Exterior Louvers m2<br />
1075000000 Telephone Specialties LS<br />
1075100000 Telephone Directory Units ea<br />
1075200000 Telephone Booths ea<br />
1075300000 Telephone Shelving ea<br />
1080000000 Toilet & Bath Accessories LS<br />
1081000000 Toilet Accessories LS<br />
1081100000 Commercial Toilet Accessories LS<br />
1081200000 Detention Toilet Accessories LS<br />
1081300000 Hospital Toilet Accessories LS<br />
1082000000 Bath Accessories LS<br />
1082100000 Residential Bath Accessories LS<br />
1082200000 Shower & Tub Doors ea<br />
1083000000 Laundry Accessories LS<br />
1083100000 Built-In Ironing Boards LS<br />
1083200000 Clothes Drying Racks LS<br />
1088000000 Scales LS<br />
1088100000 Fixed Scales LS<br />
1088200000 Portable Scales LS<br />
1090000000 Wardrobe Specialties LS<br />
1090100000 Hat Racks ea<br />
1090200000 Coat Racks ea<br />
1100000000 Permanent Equipment m2<br />
1110000000 Commercial Equipment LS<br />
1111000000 Security & Vault Equipment LS<br />
1111100000 Safe Deposit Boxes ea<br />
1111200000 Safes ea<br />
1111300000 Vault Doors ea<br />
1111400000 Darkroom Equipment LS<br />
1111410000 Darkroom Equipment LS<br />
1111420000 Darkroom Revolving Doors ea<br />
1111430000 Darkroom Transfer Cabinets ea<br />
1112000000 Mercantile Equipment LS<br />
1112100000 Teller & Service Equipment LS<br />
1112110000 Automatic Banking Systems ea<br />
1112120000 Money Cart Pass Through ea<br />
1112130000 Package Transfer Units ea<br />
1112140000 Teller Window Units ea<br />
1112150000 Teller Equipment Systems ea<br />
1112200000 Barbershop Equipment LS<br />
1112300000 Cash Registers ea<br />
1112400000 Display Cases ea<br />
1113000000 Parking & Traffic Equipment LS<br />
1113100000 Parking Control Equipment LS<br />
1113110000 Coin Machine Units ea<br />
1113120000 Key Card Units ea<br />
1113130000 Parking Gates ea<br />
1113140000 Ticket Dispensers ea<br />
1113200000 Loading Dock Equipment LS<br />
1113210000 Dock Bumpers ea<br />
1113220000 Dock Levelers ea<br />
1113230000 Dock Lifts ea<br />
1113240000 Portable Ramps ea<br />
1113250000 Seals & Shelters ea<br />
1113260000 Truck Restraints ea<br />
1114000000 Auditorium & Vending Equipment LS<br />
1114100000 Maintenance Equipment LS<br />
1114110000 Cleaning Equipment LS<br />
1114120000 Housekeeping Equipment LS<br />
1114130000 Vacuum Systems LS<br />
1114140000 Window Washing Systems LS<br />
1114200000 Ecclesiastical Equipment LS<br />
1114210000 Baptisteries LS<br />
1114220000 Chancel Fittings LS<br />
1114300000 Library Equipment LS<br />
1114310000 Automated Retrieval Systems LS<br />
1114320000 Book Depositories LS<br />
1114330000 Book Theft Equipment LS<br />
03/01/2009 1:04:57 PM Page No 20 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1114340000 Library Stack Systems LS<br />
1114400000 Theatre & Stage Equipment LS<br />
1114410000 Acoustical Shells LS<br />
1114420000 Portable Stages LS<br />
1114430000 Rigging Systems LS<br />
1114440000 Stage Curtains LS<br />
1114500000 Instrumental Equipment LS<br />
1114510000 Bells LS<br />
1114520000 Carillons LS<br />
1114530000 Organs ea<br />
1114600000 Registration Equipment LS<br />
1114610000 Hotel Registration Equipment LS<br />
1114620000 Hospital Registration Equipment LS<br />
1114700000 Checkroom Equipment LS<br />
1114800000 Audio-Visual Equipment LS<br />
1114810000 Projection Screens ea<br />
1114820000 Projectors ea<br />
1115000000 Commercial Laundry Equipment LS<br />
1115100000 Dry Cleaning Equipment LS<br />
1115200000 Drying Equipment LS<br />
1115300000 Finishing Equipment LS<br />
1115400000 Ironing Equipment LS<br />
1115500000 Washing Equipment LS<br />
1116000000 Vending Equipment LS<br />
1116100000 Money Changing Machines ea<br />
1116200000 Vending Machines ea<br />
1116300000 Ticket Vending Machines ea<br />
1116400000 Ticket Validator Machines ea<br />
1117000000 Detention Equipment LS<br />
1117100000 Detention Enclosures LS<br />
1117200000 Detention Furnishings LS<br />
1118000000 Food Processing Equipment LS<br />
1118100000 Food Processing Equipment LS<br />
1118200000 Food Weighing Equipment LS<br />
1118300000 Food Service Equipment LS<br />
1118310000 Food Storage Equipment LS<br />
1118311000 Refridgerators ea<br />
1118312000 Freezers ea<br />
1118313000 Walk-In-Coolers ea<br />
1118314000 Walk-In-Freezers ea<br />
1118320000 Food Preparation Equipment LS<br />
1118330000 Food Delivery Equipment LS<br />
1118340000 Food Cooking Equipment LS<br />
1118350000 Hood & Ventilation Equipment LS<br />
1118360000 Food Dispensing Equipment LS<br />
1118361000 Bar Equipment LS<br />
1118362000 Service Line Equipment LS<br />
1118363000 Soda Fountain Equipment LS<br />
1118370000 Ice Machines ea<br />
1119000000 Exhibit Equipment LS<br />
1120000000 Water Supply Equipment LS<br />
1121000000 Solid Waste Handling Equipment LS<br />
1121100000 Waste Bins ea<br />
1121200000 Waste Chutes m<br />
1121300000 Packaged Incinerators ea<br />
1121400000 Pneumatic Waste Equipment LS<br />
1121500000 Pulping Machines LS<br />
1121600000 Recycling Equipment LS<br />
1121700000 Waste Compactors ea<br />
1122000000 Water Supply & Treatment Equipment LS<br />
1122100000 Supply & Treatment Pumps LS<br />
1122200000 Mixers & Flocculators LS<br />
1122300000 Clarifiers LS<br />
1122400000 Water Aeration Equipment LS<br />
1122500000 Chemical Feed Equipment LS<br />
1122600000 Water Softening Equipment LS<br />
1122700000 Disenfectant Feed Equipment LS<br />
1122800000 Fluoridation Equipment LS<br />
1123000000 Hydraulic Gates & Valves LS<br />
1123100000 Hydraulic Gates LS<br />
1123110000 Bulkhead Gates LS<br />
03/01/2009 1:04:57 PM Page No 21 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1123120000 Highpressure Gates LS<br />
1123130000 Hinged Leaf Gates LS<br />
1123140000 Radial Gates LS<br />
1123150000 Slide Gates LS<br />
1123160000 Sluice Gates LS<br />
1123170000 Spillway Crest Gates LS<br />
1123180000 Vertical Lift Gates LS<br />
1123200000 Hydraulic Valves LS<br />
1123210000 Butterfly Valves LS<br />
1123220000 Regulating Valves LS<br />
1130000000 Maintenance Equipment LS<br />
1131000000 Automotive Service Equipment LS<br />
1132000000 Rail Vehicle Maintenance Equipment LS<br />
1133000000 Airplane Service Equipment LS<br />
1134000000 Vehicle Service Equipment LS<br />
1134100000 Compressed Air Equipment LS<br />
1134200000 Fuel Dispensing Equipment LS<br />
1134300000 Lubrication Equipment LS<br />
1134400000 Tire Changing Equipment LS<br />
1134500000 Vehicle Washing Equipment LS<br />
1140000000 Residential Appliances LS<br />
1141000000 Residential Equipment LS<br />
1141100000 Residential Appliances ea<br />
1141110000 Washers ea<br />
1141120000 Dryers ea<br />
1141200000 Residential Kitchen Equipment ea<br />
1141210000 Stoves ea<br />
1141220000 Refridgerators ea<br />
1141230000 Freezers ea<br />
1141240000 Dish Washers ea<br />
1141250000 Microwave Ovens ea<br />
1141300000 Retractable Stairs LM<br />
1142000000 Unit Kitchens LS<br />
1143000000 Athletic Equipment LS<br />
1143100000 Backstops m2<br />
1143200000 Bowling Alley Equipment LS<br />
1143300000 Exercise Equipment LS<br />
1143400000 Gymnasium Dividers m2<br />
1143500000 Gymnasium Equipment LS<br />
1143600000 Scoreboards ea<br />
1143700000 Shooting Range Equipment LS<br />
1143800000 Therapeutic Equipment LS<br />
1150000000 Athletic Equipment LS<br />
1151000000 Backstops m2<br />
1152000000 Bowling Alley Equipment LS<br />
1153000000 Exercise Equipment LS<br />
1154000000 Gymnasium Dividers m2<br />
1155000000 Gymnasium Equipment LS<br />
1156000000 Scoreboards ea<br />
1157000000 Shooting Range Equipment LS<br />
1158000000 Therapeutic Equipment LS<br />
1160000000 Laboratory & Office Equipment LS<br />
1161000000 Laboratory Equipment LS<br />
1161100000 Laboratory Service Fittings ea<br />
1161200000 Laboratory Fume Hoods m2<br />
1161300000 Laboratory Incubators ea<br />
1161400000 Laboratory Sterilizers ea<br />
1161500000 Laboratory Refrigerators ea<br />
1161600000 Laboratory Safety Appliances ea<br />
1162000000 Office Equipment LS<br />
1162100000 Computers ea<br />
1162200000 Printers ea<br />
1162300000 Photocopiers ea<br />
1162400000 Drafting Equipment ea<br />
1162500000 Plotters ea<br />
1162700000 Scanners ea<br />
1162800000 Routers ea<br />
1170000000 Medical Equipment LS<br />
1171000000 Medical Sterilizing Equipment LS<br />
1172000000 Examination & Treatment Equipment LS<br />
1173000000 Patient Care Equipment LS<br />
03/01/2009 1:04:57 PM Page No 22 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1174000000 Dental Equipment LS<br />
1175000000 Optical Equipment LS<br />
1176000000 Operating Room Equipment LS<br />
1177000000 Radiology Equipment LS<br />
1178000000 Mortuary Equipment LS<br />
1180000000 Navigation & Agricultural Equipment LS<br />
1181000000 Navigation Equipment LS<br />
1182000000 Agricultural Equipment LS<br />
1190000000 Food Processing Equipment LS<br />
1191000000 Food Processing Equipment LS<br />
1192000000 Food Weighing Equipment LS<br />
1193000000 Food Service Equipment LS<br />
1193100000 Food Storage Equipment LS<br />
1193110000 Refridgerators ea<br />
1193120000 Freezers ea<br />
1193130000 Walk-In-Coolers ea<br />
1193140000 Walk-In-Freezers ea<br />
1193200000 Food Preparation Equipment LS<br />
1193400000 Food Delivery Equipment LS<br />
1193500000 Food Cooking Equipment LS<br />
1193600000 Hood & Ventilation Equipment LS<br />
1193700000 Food Dispensing Equipment LS<br />
1193710000 Bar Equipment LS<br />
1193720000 Service Line Equipment LS<br />
1193730000 Soda Fountain Equipment LS<br />
1193800000 Ice Machines ea<br />
1200000000 Furnishings m2<br />
1210000000 Artwork & Fabrics LS<br />
1211000000 Murals m2<br />
1212000000 Wall Decorations ea<br />
1213000000 Fabrics m2<br />
1214000000 Sculptures ea<br />
1217000000 Art Glass m2<br />
1219000000 Ecclesiastical Art ea<br />
1230000000 Manufactured Casework LS<br />
1231000000 Metal Casework m2<br />
1232000000 Wood Casework m2<br />
1232100000 Wood-Veneer-Faced Casework m2<br />
1232200000 Plastic-Laminate-Faced Casework m2<br />
1235000000 Specialty Casework ea<br />
1235100000 Bank Casework ea<br />
1235200000 Dental Casework ea<br />
1235300000 Display Casework ea<br />
1235400000 Dormitory Casework ea<br />
1235500000 Educational Facility Casework ea<br />
1235600000 Hospital Casework ea<br />
1235700000 Kitchen Casework ea<br />
1235800000 Laboratory Casework ea<br />
1235900000 Library Casework ea<br />
1236000000 Medical Casework ea<br />
1236100000 Nurse Station Casework ea<br />
1236200000 Religious Casework ea<br />
1236300000 Residential Casework ea<br />
1236400000 Study Carrels ea<br />
1240000000 Furnishings & Accessories LS<br />
1241000000 Desk Accessories ea<br />
1242000000 Table Accessories ea<br />
1242100000 China ea<br />
1242200000 Flatware ea<br />
1242300000 Glassware ea<br />
1242400000 Holloware ea<br />
1242500000 Napery ea<br />
1242600000 Silverware ea<br />
1242700000 Table Linens ea<br />
1243000000 Portable Lamps ea<br />
1243100000 Desk Lamps ea<br />
1243200000 Floor Lamps ea<br />
1243300000 Table Lamps ea<br />
1244000000 Bath Furnishings ea<br />
1244100000 Bath Linens ea<br />
1244200000 Bath Mats ea<br />
03/01/2009 1:04:57 PM Page No 23 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1244300000 Bath Towels ea<br />
1244400000 Shower Curtains ea<br />
1245000000 Bedroom Furnishings ea<br />
1245100000 Bed Linens ea<br />
1245200000 Blankets ea<br />
1245300000 Comforters ea<br />
1245400000 Pillows ea<br />
1246000000 Furnishing Accessories ea<br />
1246100000 Ash Receptacles ea<br />
1246200000 Bowls ea<br />
1246300000 Clocks ea<br />
1246400000 Decorative Crafts ea<br />
1246500000 Decorative Screens ea<br />
1246600000 Vases ea<br />
1246700000 Waste Receptacles ea<br />
1248000000 Rugs & Mats m2<br />
1248100000 Floor Mats m2<br />
1248200000 Rugs m2<br />
1248300000 Runners m2<br />
1249000000 Window Treatments m<br />
1249100000 Blinds m2<br />
1249200000 Curtains & Drapes m2<br />
1249300000 Interior Shutters m2<br />
1249400000 Shades m2<br />
1249500000 Solar-Control Film m2<br />
1249600000 Window Treatment Hardware ea<br />
1250000000 Furniture LS<br />
1251000000 Office Furniture LS<br />
1251100000 Custom Office Furniture ea<br />
1251200000 Office Case Goods ea<br />
1252000000 Seating LS<br />
1252100000 Chairs ea<br />
1252200000 Custom Upholstered Seating ea<br />
1252300000 Upholstered Seating ea<br />
1254000000 Hospitality Furniture LS<br />
1254100000 Hotel Furniture ea<br />
1254200000 Motel Furniture ea<br />
1254300000 Restaurant Furniture LS<br />
1256000000 Institutional Furniture LS<br />
1256100000 Book Shelves ea<br />
1256200000 Classroom Furniture LS<br />
1256300000 Dormitory Furniture LS<br />
1256400000 Health Care Furniture LS<br />
1256500000 Index Card File Cabinets ea<br />
1256600000 Laboratory Furniture LS<br />
1256700000 Library Furniture LS<br />
1256800000 Study Carrels ea<br />
1258000000 Residential Furniture LS<br />
1260000000 Multiple Seating LS<br />
1261000000 Fixed Audience Seating ea<br />
1262000000 Portable Audience Seating ea<br />
1262100000 Folding Chairs ea<br />
1262200000 Interlocking Chairs ea<br />
1262300000 Stacking Chairs ea<br />
1263000000 Stadium & Arena Seating ea<br />
1264000000 Booths & Tables ea<br />
1265000000 Multiple-Use Fixed Seating ea<br />
1266000000 Telescoping Stands LS<br />
1266100000 Telescoping Beachers LS<br />
1266200000 Telescoping Chair Platforms LS<br />
1267000000 Pews & Benches m<br />
1268000000 Seat & Table Assemblies ea<br />
1270000000 Systems Furniture LS<br />
1271000000 Panel-Hung Component Systems LS<br />
1272000000 Free-Standing Component System Furniture LS<br />
1273000000 Beam System Furniture LS<br />
1274000000 Desk System Furniture LS<br />
1280000000 Interior Plants & Planters LS<br />
1281000000 Interior Live Plants ea<br />
1282000000 Interior Artificial Plants ea<br />
1283000000 Interior Planters ea<br />
03/01/2009 1:04:57 PM Page No 24 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1284000000 Interior Landscape Accessories LS<br />
1285000000 Interior Plant Maintenance Month<br />
1290000000 Furniture Restoration LS<br />
1291000000 Furniture Restoration LS<br />
1292000000 Playground Equipment LS<br />
1292100000 Recreational Screening m2<br />
1292200000 Playground Equipment LS<br />
1293000000 Site Furnishings ea<br />
1293100000 Bicycle Racks ea<br />
1293200000 Garbage Recepticals ea<br />
1293300000 Prefabricated Planters ea<br />
1293400000 Benches & Seating ea<br />
1293500000 Shelters ea<br />
1293510000 Bus Stop Shelters ea<br />
1293520000 Park Shelters ea<br />
1293600000 Tables ea<br />
1300000000 Special Construction m2<br />
1310000000 Special Purpose Rooms LS<br />
1311000000 Electrical Protection LS<br />
1311100000 Lightning Protection LS<br />
1311200000 Cathodic Ptrotection LS<br />
1312000000 Pre-Engineered <strong>Structure</strong>s m2<br />
1312100000 Pre-Engineered Buildings m2<br />
1312200000 Portable & Mobile Buildings m2<br />
1312300000 Metal Building Systems m2<br />
1312400000 Grandstands & Bleachers m2<br />
1312500000 Glazed <strong>Structure</strong>s m2<br />
1312600000 Modular Mezzanines m2<br />
1312700000 Prefabricated Control Booths m2<br />
1312800000 Fabric <strong>Structure</strong>s m2<br />
1312900000 Cable Supported <strong>Structure</strong>s m2<br />
1315000000 Swimming Pools ea<br />
1315100000 Below Grade Pools ea<br />
1315200000 Elevated Pools ea<br />
1315300000 On-Grade Pools ea<br />
1315400000 Recirculating Gutter Systems ea<br />
1315500000 Pool Accessories ea<br />
1315600000 Pool Cleaning Systems ea<br />
1316000000 Aquariums LS<br />
1316500000 Aquatic Park Facilities LS<br />
1317000000 Tubs & Pools ea<br />
1317100000 Hot Tubs ea<br />
1317200000 Therapeutic Pools ea<br />
1317300000 Whirlpool Tubs ea<br />
1317500000 Ice Rinks LS<br />
1318500000 Kennels & Animal Shelters LS<br />
1319000000 Site Constructed Incinerators LS<br />
1319100000 Sludge Incinerators LS<br />
1319200000 Solid Waste Incinerators LS<br />
1320000000 Storage & Treatment Systems LS<br />
1321000000 Storage Tanks LS<br />
1321100000 Underground Storage Tanks ea<br />
1321200000 At Grade Storage Tanks ea<br />
1321300000 Elevated Storage Tanks ea<br />
1321400000 Tank Lining m2<br />
1322000000 Filter Underdrains & Media LS<br />
1322100000 Filter Bottoms LS<br />
1322200000 Filter Media LS<br />
1322300000 Package Filters LS<br />
1323000000 Digester Covers & Appurtenances LS<br />
1323100000 Fixed Digester Covers LS<br />
1323200000 Floating Digester Covers LS<br />
1323300000 Gas Holder Covers LS<br />
1324000000 Oxygen Systems LS<br />
1324100000 Oxygen Dissolution System LS<br />
1324200000 Oxygen Generators LS<br />
1324300000 Oxygen Storage Facility LS<br />
1326000000 Sludge Conditioning Systems LS<br />
1327000000 Pumping Stations ea<br />
1328000000 Hazardous Material Remediation LS<br />
1330000000 Environmentally Controlled <strong>Structure</strong>s LS<br />
03/01/2009 1:04:57 PM Page No 25 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1301000000 Air Supported <strong>Structure</strong>s m2<br />
1302000000 Building Modules ea<br />
1302100000 Prison Cells ea<br />
1302200000 Hotel Units ea<br />
1302300000 Dormitory Units ea<br />
1303000000 Special Purpose Rooms ea<br />
1303100000 Athletic Rooms ea<br />
1303200000 Steam Rooms ea<br />
1303300000 Saunas ea<br />
1303400000 Cold Storage Rooms ea<br />
1303500000 Planetariums ea<br />
1303600000 Sound Rooms ea<br />
1303700000 Vaults ea<br />
1303800000 Hyperbaric Rooms ea<br />
1303900000 Clean Rooms ea<br />
1308000000 Sound, Vibration & Seismic Control LS<br />
1309000000 Radiation Protection LS<br />
1340000000 Measurement & Control Instrumentation LS<br />
1341000000 Control Instrumentation Material LS<br />
1341100000 Electronic Wire & Cable LS<br />
1341200000 Instrument Air Accessories LS<br />
1341300000 Instrument Air Tubing LS<br />
1341400000 Optical Fiber Cable LS<br />
1342000000 Control Instruments LS<br />
1342050000 Control Valves ea<br />
1342100000 Differential Pressure Instruments ea<br />
1342150000 Flowmeters ea<br />
1342200000 Gage Glasses & Cocks ea<br />
1342250000 Level Instruments ea<br />
1342300000 Oriface Plates & Flanges ea<br />
1342400000 Potentiometric Instruments ea<br />
1342500000 Pressure Instruments ea<br />
1342600000 Receiver Instruments ea<br />
1342700000 Temperature Instruments ea<br />
1342800000 Traps & Drainers ea<br />
1343000000 Control Centers LS<br />
1344000000 Control Indicators LS<br />
1344100000 Annunciators ea<br />
1344200000 Controllers ea<br />
1344300000 Indicators ea<br />
1344400000 Recorders ea<br />
1345000000 Central Control LS<br />
1348000000 Instrument Reports LS<br />
1348100000 Instrument Diagrams LS<br />
1348200000 Instrument Layouts LS<br />
1348300000 Instrument Lists LS<br />
1349000000 Controls Commissioning LS<br />
1350000000 Transportation Control & Instrumentation LS<br />
1352000000 Seismic Instrumentation LS<br />
1353000000 Meteorological Instrumentation LS<br />
1356000000 Airport Control Instrumentation LS<br />
1357000000 Railroad Control Instrumentation LS<br />
1358000000 Subway Control Instrumentation LS<br />
1359000000 Transit Vehicle Control Instrumentation LS<br />
1360000000 Solar & Wind Energy LS<br />
1361000000 Solar Flat Plat Collectors LS<br />
1362000000 Solar Concentrating Collectors LS<br />
1363000000 Solar Collector Components LS<br />
1364000000 Packaged Solar Equioment LS<br />
1365000000 Photovoltaic Collectors LS<br />
1366000000 Wind Energy Equipment LS<br />
1370000000 Security Access & Surveillance LS<br />
1370100000 Door Answering Equipment LS<br />
1370200000 Intrusion Detection LS<br />
1370300000 Security Access LS<br />
1370400000 Video Surveillance LS<br />
1370500000 Radio Equipment LS<br />
1380000000 Building Automation & Control LS<br />
1381000000 Clock Control LS<br />
1382000000 Door Control LS<br />
1383000000 Elevator Control LS<br />
03/01/2009 1:04:57 PM Page No 26 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1384000000 Energy Monitoring LS<br />
1385000000 Environmental Control LS<br />
1386000000 Escalator Control LS<br />
1387000000 Lighting Control LS<br />
1388000000 Detection & Alarm LS<br />
1388100000 Fire Alarm ea<br />
1388200000 Gas Detection ea<br />
1388300000 Leak Detection ea<br />
1388400000 Smoke Alarm ea<br />
1390000000 Fire Suppression LS<br />
1392000000 Fire Pumps LS<br />
1393000000 Pipe Sprinkler Systems LS<br />
1393100000 Wet-Pipe Sprinkler Systems LS<br />
1393200000 Dry Pipe Sprinkler Systems LS<br />
1393900000 Alternative Fire Extinguishing Systems LS<br />
1393910000 Halon Fire Extinguishing System LS<br />
1393920000 Water Mist Fire Extinguishing System LS<br />
1394000000 Pre-Action Sprinkler Systems LS<br />
1395000000 Deluge Sprinkler Systems LS<br />
1396000000 Carbon Dioxide Fire Extinguishing LS<br />
1397000000 Dry Chemical Fire Extinguishing LS<br />
1398000000 Foam Fire Extinguishing LS<br />
1400000000 Conveying Systems m2<br />
1410000000 Dumpwaiters LS<br />
1411000000 Manual Dumbwaiters ea<br />
1412000000 Electric Dumbwaiters ea<br />
1414000000 Hydraulic Dumbwaiters ea<br />
1420000000 Elevators LS<br />
1421000000 Electric Traction Elevators ea<br />
1421100000 Electric Traction Freight Elevators ea<br />
1421200000 Electric Traction Passenger Elevators ea<br />
1421300000 Electric Traction Residential Elevators ea<br />
1421400000 Electric Traction Service Elevators ea<br />
1424000000 Hydraulic Elevators ea<br />
1424100000 Hydraulic Freight Elevators ea<br />
1424200000 Hydraulic Passenger Elevators ea<br />
1424300000 Hydraulic Residential Elevators ea<br />
1424400000 Hydraulic Service Elevators ea<br />
1427000000 Custom Elevator Cabs ea<br />
1428000000 Elevator Equipment & Controls LS<br />
1428100000 Elevator Doors ea<br />
1428200000 Elevator Controls LS<br />
1429000000 Elevator Renovation LS<br />
1430000000 Escalators & Moving Walkways LS<br />
1431000000 Escalators m<br />
1432000000 Moving Sidewalks m<br />
1433000000 Motorized Ramps m<br />
1434000000 Powered Ramps m<br />
1440000000 Lifts LS<br />
1441000000 People Lifts ea<br />
1442000000 Wheelchair Lifts ea<br />
1443000000 Platform Lifts ea<br />
1444000000 Sidewalk Lifts ea<br />
1445000000 Vehicle Lifts ea<br />
1450000000 Material Handling LS<br />
1451000000 Material Transport LS<br />
1453000000 Postal Conveying LS<br />
1454000000 Baggage Conveying LS<br />
1455000000 Conveyors m<br />
1455100000 Belt Conveyors m<br />
1455200000 Bucket Conveyors m<br />
1455300000 Container Conveyors m<br />
1455400000 Hopper & Track Conveyors m<br />
1455500000 Monorail Conveyors m<br />
1455600000 Oscillating Conveyors m<br />
1455700000 Pneumatic Conveyors m<br />
1455800000 Roller Conveyors m<br />
1455900000 Scoop Conveyors m<br />
1455930000 Screw Conveyors m<br />
1455950000 Selective Vertical Conveyors m<br />
1456000000 Chutes m<br />
03/01/2009 1:04:57 PM Page No 27 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
1456100000 Coal Chutes m<br />
1456200000 Dry Bulk Material Chutes m<br />
1456300000 Escape Chutes m<br />
1456400000 Laundry & Linen Chutes m<br />
1456500000 Package Chutes m<br />
1456600000 Refuse Chutes m<br />
1457000000 Feeders m<br />
1457100000 Apron Feeders m<br />
1457200000 Reciprocating Plate Feeders m<br />
1457300000 Rotary Flow Feeders m<br />
1457400000 Vibratory Feeders m<br />
1458000000 Pneumatic Tube Systems LS<br />
1460000000 Permanent Hoists & Cranes LS<br />
1461000000 Crane Rails ea<br />
1462000000 Trolley Hoists ea<br />
1462100000 Air-Powered Trolley Hoists ea<br />
1462200000 Electric Trolley Hoists ea<br />
1462300000 Manual Trolley Hoists ea<br />
1463000000 Bridge Cranes ea<br />
1463100000 Top-Running Overhead Cranes ea<br />
1463200000 Underslung Overhead Cranes ea<br />
1464000000 Fixed Hoists ea<br />
1461100000 Air-Powered Fixed Hoists ea<br />
1461200000 Electric Fixed Hoists ea<br />
1461300000 Manual Fixed Hoists ea<br />
1465000000 Gantry Cranes ea<br />
1467000000 Tower Cranes ea<br />
1468000000 Mobile Cranes ea<br />
1469000000 Derricks ea<br />
1470000000 Turntables LS<br />
1471000000 Turntables ea<br />
1480000000 Permanent Scaffold Systems LS<br />
1481000000 Suspended Scaffolding LS<br />
1481100000 Beam Scaffolding LS<br />
1481200000 Carriage Scaffolding LS<br />
1481300000 Hook Scaffolding LS<br />
1482000000 Rope Climbers ea<br />
1482100000 Manual Rope Climbers ea<br />
1482200000 Powered Rope Climbers ea<br />
1483000000 Telescoping Platforms ea<br />
1483100000 Electric & Battery Telescoping Platforms ea<br />
1483200000 Pneumatic Telescoping Platforms ea<br />
1484000000 Powered Scaffolding LS<br />
1490000000 Passenger Movement Systems LS<br />
1491000000 People Mover Systems m<br />
1492000000 Monorail Systems m<br />
1493000000 Funiculars LS<br />
1494000000 Aerial Tramway Systems m<br />
1495000000 Aircraft Passenger Loading Systems ea<br />
1495100000 Loading Bridges ea<br />
1495200000 Loading Stairway Systems ea<br />
2000 Facility Services LS<br />
2100 Mechanical m2<br />
2100000000 Fire Suppression m2<br />
2110000000 Water Based Fire Suppression m2<br />
2111000000 Water Service Piping m<br />
2112000000 Fire-Suppression Standpipes m<br />
2113000000 Sprinkler Systems ea<br />
2120000000 Fire Extinguishing Systems m2<br />
2121000000 Carbon-Dioxide Fire-Extinguishing Systems LS<br />
2122000000 Clean-Agent Fire-Extinguishing Systems LS<br />
2130000000 Fire Pumps m2<br />
2131000000 Centrifugal Fire Pumps ea<br />
2132000000 Vertical-Turbine Fire Pumps LS<br />
2133000000 Positive-Displacement Fire Pumps LS<br />
2140000000 Water Storage m2<br />
2141000000 Storage Tanks for Fire-Suppression Water LS<br />
2200000000 Plumbing m2<br />
2210000000 Plumbing Pipe Accessories m2<br />
2205000000 Hangers & Supports m<br />
03/01/2009 1:04:57 PM Page No 28 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
2207000000 Pipe Insulation m<br />
2220000000 Plumbing Piping m2<br />
2211000000 Copper Domestic Water Piping m<br />
2211100000 Type K Copper Pipe & Tubing m<br />
2211200000 Type L Copper Pipe & Tubing m<br />
2211300000 Type Dwv Copper Pipe & Tubing m<br />
2212000000 Fittings ea<br />
2212100000 Backflow Preventers ea<br />
2212200000 Cleanouts ea<br />
2212300000 Drains ea<br />
2212400000 Faucets ea<br />
2212500000 Hydrants ea<br />
2212600000 Traps ea<br />
2213000000 Valves ea<br />
2213100000 Bronze Valves ea<br />
2213200000 Cast Iron Valves ea<br />
2213300000 Plastic Valves ea<br />
2213400000 Steel Valves ea<br />
2214000000 Piping Specialties LS<br />
2215000000 Pumps ea<br />
2216000000 Plastic Waste Piping m<br />
2216100000 PVC Pipe m<br />
2216200000 DWV Pipe m<br />
2216300000 Fibreglass Reinforced m<br />
2217000000 Storm Drainage Piping m<br />
2217100000 PVC Storm Drainage Pipe m<br />
2217200000 Concrete Storm Drainage Pipe m<br />
2218000000 Plastic Pool & Fountain Piping m<br />
2230000000 Plumbing Fixtures & Equipment m2<br />
2231000000 Plumbing Fixtures ea<br />
2231100000 Baths ea<br />
2231200000 Lavatories ea<br />
2231300000 Laundry Sinks ea<br />
2231400000 Showers ea<br />
2231500000 Sinks ea<br />
2231600000 Urinals ea<br />
2231700000 Water Closets ea<br />
2234000000 Plumbing Pumps ea<br />
2234100000 Circulating Pumps ea<br />
2234200000 Utility Pumps ea<br />
2234300000 Booster Pumps ea<br />
2234400000 Sewage Ejector ea<br />
2234500000 Sump Pumps ea<br />
2234600000 Well Pumps ea<br />
2235000000 Potable Water Storage Tanks ea<br />
2236000000 Domestic Water Conditioning LS<br />
2237000000 Domestic Water Filtrating LS<br />
2238000000 Domestic Water Heaters ea<br />
2238100000 Electric Water Heaters ea<br />
2238200000 Gas Fired Water Heaters ea<br />
2238300000 Oil Fired Water Heaters ea<br />
2239000000 Pool & Fountain Equipment LS<br />
2240000000 Process Piping m2<br />
2261000000 Industrial Process Piping m2<br />
2261100000 Stainless Steel Threaded Pipe m<br />
2261200000 Black Steel Threaded Pipe m<br />
2261300000 Black Steel Welded Pipe m<br />
2261400000 Black Steel Grooved Pipe m<br />
2261500000 Flanged Cast Iron Pipe m<br />
2261600000 Galvanized Steel Grooved Pipe m<br />
2261700000 Aluminum Pipe m<br />
2262000000 Process Water & Waste Piping m2<br />
2262100000 Corrosion Resistant Waste Water Pipe m<br />
2262200000 Waste Water Pipe m<br />
2300000000 Heating Ventilating & Air Conditioning m2<br />
2320000000 HVAC Piping m2<br />
2321000000 Steel Heating & Cooling Steel Piping m<br />
2321100000 Stainless Steel Threaded Pipe m<br />
2321200000 Black Steel Threaded Pipe m<br />
2321300000 Black Steel Welded Pipe m<br />
2321400000 Black Steel Grooved Pipe m<br />
03/01/2009 1:04:57 PM Page No 29 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
2321500000 Galvanized Steel Threaded Pipe m<br />
2321600000 Galvanized Steel Grooved Pipe m<br />
2330000000 Air Distribution m2<br />
2331000000 Ducts m<br />
2331100000 Aluminum Alloy Ducts m<br />
2331200000 Galvanized Steel Ducts m<br />
2331300000 Stainless Steel Ducts m<br />
2332000000 Duct Accessories LS<br />
2333000000 Fans ea<br />
2333100000 Axial Flow Fans ea<br />
2333200000 In-Line Centrifucal Fans ea<br />
2333300000 Ceiling Fans ea<br />
2333400000 Propeller Exhaust Fans ea<br />
2334000000 Air Terminal Units ea<br />
2335000000 Air Outlets & Inlets ea<br />
2335100000 Air Diffusers ea<br />
2335200000 Air Grilles ea<br />
2335300000 Air Registers ea<br />
2335400000 Air Dampers ea<br />
2336000000 Air Filters ea<br />
2336100000 Electronic Air Cleaners ea<br />
2336200000 Media Filtration Units ea<br />
2336300000 Throwaway Media Filters ea<br />
2350000000 Heat Generation Equipment m2<br />
2351000000 Boilers & Accessories ea<br />
2351100000 Electric Boilers ea<br />
2351200000 Gas Fired Boilers ea<br />
2351300000 Oil Fired Boilers ea<br />
2352000000 Feedwater Equipment LS<br />
2353000000 Furnaces ea<br />
2353100000 Electric Furnaces ea<br />
2353200000 Gas Furnaces ea<br />
2353300000 Oil Furnaces ea<br />
2354000000 Fuel-Fired Heaters ea<br />
2355000000 Breechings Chimneys & Stacks ea<br />
2355100000 Gas Vent Chimney ea<br />
2355200000 All Fuel Vent Chimney ea<br />
2355300000 High Temperature Vent Chimney ea<br />
2356000000 Warm Air Systems m2<br />
2356100000 Draft Fans ea<br />
2356200000 Duct Furnaces ea<br />
2356300000 Duct Heaters ea<br />
2356400000 Heating & Ventilating Units ea<br />
2356500000 Make-Up Air Units ea<br />
2356600000 Space Heaters ea<br />
2360000000 Refridgeration & Cooling Equipment m2<br />
2361000000 Refridgeration Compressors ea<br />
2362000000 Packaged Water Chillers ea<br />
2363000000 Refrigerant Monitoring Systems ea<br />
2364000000 Packaged Cooling Towers ea<br />
2365000000 Field-Erected Cooling Towers ea<br />
2366000000 Liquid Coolers & Condensers ea<br />
2367000000 Refrigerant Condensing Units ea<br />
2370000000 Heating, Ventilating & Air Conditioning Equipment m2<br />
2371000000 Heat Exchangers ea<br />
2372000000 Air Handling Units ea<br />
2373000000 Air Conditioning Units ea<br />
2374000000 Heat Pumps ea<br />
2374100000 Air To Air Split Heat Pumps ea<br />
2374200000 Water Source To Air Heat Pumps ea<br />
2375000000 Humidity Control Equipment LS<br />
2376000000 Cooling Towers ea<br />
2376100000 Galvanized Steel Cooling Towers ea<br />
2376200000 Fiberglass Cooling Towers ea<br />
2376300000 Stainless Steel Cooling Towers ea<br />
2377000000 Floor Heating & Snow Melting Equipment LS<br />
2378000000 Energy Recovery Equipment LS<br />
2500000000 Integrated Automation m2<br />
2590000000 Instrumentation, Controls, Testing & Balancing m2<br />
2590500000 HVAC Instrumentation LS<br />
2591000000 HVAC Direct Digital Controls LS<br />
03/01/2009 1:04:57 PM Page No 30 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
2591500000 HVAC Electric Control LS<br />
2592000000 HVAC Pneumatic Controls LS<br />
2592500000 HVAC Electric & Pneumatic Controls LS<br />
2593000000 HVAC Self Powered Controls LS<br />
2593500000 Building Systems Controls LS<br />
2595100000 Test Mechanical Equipment LS<br />
2595200000 Balance Mechanical Equipment LS<br />
2600 Electrical LS<br />
2600000000 Electrical m2<br />
2610000000 Transmission & Distribution m2<br />
2611000000 Transmission Accessories LS<br />
2612000000 High-Voltage Switching LS<br />
2613000000 Medium-Voltage Switching LS<br />
2614000000 Medium Voltage Assemblies ea<br />
2616000000 Unit Substations ea<br />
2620000000 Low Voltage Distribution m2<br />
2621000000 Enclosed Switches & Circuit Breakers ea<br />
2622000000 Enclosed Controllers ea<br />
2623000000 Low-Voltage Switchgear LS<br />
2624000000 Switchboards & Control Centers ea<br />
2625000000 Enclosed Bus Assemblies ea<br />
2626000000 Low-Voltage Transformers ea<br />
2627000000 Power Distribution Units LS<br />
2629000000 Low Voltage Components LS<br />
2630000000 Electrical Power m2<br />
2631000000 Utility Services ea<br />
2632000000 Motors & Generators ea<br />
2633000000 Boards & Switches ea<br />
2634000000 Battery Equipment ea<br />
2636000000 Static Power Converters ea<br />
2637000000 Transformers ea<br />
2638000000 Power Filters ea<br />
2639000000 Power Measurement ea<br />
2640000000 Electrical Wiring m2<br />
2642000000 Conductors & Cables m<br />
2642100000 Armoured Cable m<br />
2642200000 Control Cable m<br />
2642300000 Mineral Insulated Cable m<br />
2642400000 Non-Metallic Sheathed Cable m<br />
2642500000 Shielded Cable m<br />
2642600000 Wire m<br />
2642700000 Cable Terminators m<br />
2643000000 Raceway & Conduit m<br />
2643100000 Cable Tray m<br />
2643200000 Conduit m<br />
2643300000 Concrete Embedded Conduit m<br />
2643400000 Buried Conduit m<br />
2644000000 Wiring Pull Boxes & Cabinets ea<br />
2644100000 Outlet Boxes ea<br />
2644200000 Pull Boxes & Cabinets ea<br />
2645000000 Wiring Connections ea<br />
2650000000 Lighting m2<br />
2651000000 Interior Luminaires ea<br />
2652000000 Exterior Luminaires ea<br />
2653000000 Emergency Lighting ea<br />
2654000000 Classified Location Lighting ea<br />
2655000000 Special Purpose Lighting ea<br />
2656000000 Signal Lighting ea<br />
2657000000 Dimming Control LS<br />
2658000000 Lighting Accessories LS<br />
2659000000 Lighting Restoration ea<br />
2700000000 Communications m2<br />
2671000000 Communications Circuits LS<br />
2672000000 Telephone Equipment LS<br />
2674000000 Data Processing Equipment LS<br />
2677000000 Cable Transmission Equipment LS<br />
2678000000 Broadcast Transmission Equipment LS<br />
2679000000 Microwave Transmission Equipment LS<br />
2681000000 Sound & Video Circuits LS<br />
2682000000 Sound Reinforcement LS<br />
03/01/2009 1:04:57 PM Page No 31 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
2683000000 Broadcast Audio Equipment LS<br />
2684000000 Broadcast Video Equipment LS<br />
2685000000 Television Equipment LS<br />
2688000000 Multimedia Equipment LS<br />
2800000000 Electronic Saftety & Security m2<br />
2810000000 SCADA System LS<br />
2820000000 CCTV Security Camera System ea<br />
3000 Site & Infrastructure LS<br />
3110 Site Preparation LS<br />
3111000000 Site Investigation LS<br />
3111100000 Test Holes m<br />
3111110000 Bore Holes m<br />
3111120000 Core Drilling m<br />
3111200000 Test Pits ea<br />
3111210000 Test Pits ea<br />
3111220000 Hydrovac Utility Line ea<br />
3111400000 Seismic Investigation ea<br />
3112000000 Clearing & Grubbing ha<br />
3112100000 Clearing ha<br />
3112110000 Selective Clearing ea<br />
3112111000 Close Crop Clearing ea<br />
3112112000 Prune Trees ea<br />
3112120000 Clearing ha<br />
3112121000 Light Density Clearing of Trees ha<br />
3112122000 Medium Density Clearing of Trees ha<br />
3112123000 Heavy Density Clearing of Trees ha<br />
3112124000 Heavy Clearing of Dense Forest ha<br />
3112130000 Reservoir Clearing ha<br />
3112200000 Grubbing ha<br />
3112210000 Grubb Heavy Tree Roots & Haul On Site ha<br />
3112220000 Grubb Light Tree Roots & Haul to Stock Pile ha<br />
3112230000 Grubb Light Tree Roots & Haul Off Site ha<br />
3113000000 Site Instrumentation LS<br />
3113100000 Instrumentation LS<br />
3113110000 Piezometers m<br />
3113120000 Extensometer m<br />
3113130000 Inclinometer m<br />
3113140000 Thermocouplers ea<br />
3113150000 Strain Gauges ea<br />
3113160000 Bench Marks ea<br />
3113170000 Tiltmeters ea<br />
3113180000 Accelerometers ea<br />
3113190000 Frost Indicators ea<br />
3113200000 Monitoring Operations Month<br />
3113210000 Monitor Groundwater Month<br />
3113220000 Monitor Slopes & Settlement Month<br />
3113230000 Monitor Tunnels Month<br />
3113300000 Pile Load Testing ea<br />
3114000000 Removals m2<br />
3114100000 Site Removals m<br />
3114110000 Fence Removals m<br />
3114111000 Remove Chainlink Fence m<br />
3114112000 Remove Highway Fence m<br />
3114120000 Guiderail Removals m<br />
3114121000 Remove Cable Guide Rails m<br />
3114122000 Remove Steel Guiderail m<br />
3114123000 Remove Delineator Posts ea<br />
3114124000 Remove Anchor Blocks ea<br />
3114125000 Remove Guide Rail End Treatments ea<br />
3114130000 Barrier Removals m<br />
3114131000 Remove Concrete Barriers m<br />
3114132000 Remove Precast Barriers m<br />
3114140000 Sign Removals ea<br />
3114141000 Remove Sign Footings ea<br />
3114142000 Remove Sign Support <strong>Structure</strong>s ea<br />
3114143000 Remove Small Signs ea<br />
3114150000 Gabion Wall Removals m3<br />
3114151000 Gabion Wall Removals m3<br />
3114152000 Earthwall Removal m2<br />
3114160000 Debris Removals m3<br />
03/01/2009 1:04:57 PM Page No 32 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3114161000 Remove Concrete Rubble m3<br />
3114162000 Remove Building Debris m3<br />
3114200000 Pavement Removals LS<br />
3114210000 Asphalt Pavement Removal LS<br />
3114211000 Partial Depth Asphalt Removal m2<br />
3114211100 Sawcut Asphalt Partial Depth m<br />
3114211200 Mill Asphalt Partial Depth m2<br />
3114212000 Full Depth Asphalt Removal m2<br />
3114212100 Sawcut Asphalt Full Depth m<br />
3114212200 Pulverize Asphalt Full Depth m2<br />
3114212300 Excavate Asphalt Full Depth m2<br />
3114212400 Haul to Disposal m3<br />
3114212500 Haul to Granular Stockpile m3<br />
3114212600 Spread at Granular Stockpile m3<br />
3114212700 Trim & Fine Grade Before Traffic m2<br />
3114213000 Asphalt Removal from Concrete m2<br />
3114213100 Sawcut Asphalt Partial Depth m<br />
3114213200 Mill Asphalt off Concrete m2<br />
3114213300 Haul to Disposal m3<br />
3114220000 Concrete Pavement Removal LS<br />
3114221000 Partial Depth Concrete Removal m2<br />
3114221100 Sawcut Concrete Partial Depth m<br />
3114221200 Mill Concrete Partial Depth m2<br />
3114221300 Concrete Pavement Disposal t<br />
3114222000 Full Depth Concrete Removal m2<br />
3114222100 Sawcut Concrete Partial Depth m<br />
3114222200 Mill Concrete Full Depth m2<br />
3114222300 Excavate Concrete Full Depth m2<br />
3114222400 Concrete Pavement Disposal m3<br />
3114230000 Curb & Gutter Removal m<br />
3114231000 Excavate Concrete Curb & Gutter m<br />
3114232000 Concrete Curb Disposal m3<br />
3114240000 Sidewalk Removal m2<br />
3114241000 Excavate Concrete Full Depth m2<br />
3114242000 Concrete Pavement Disposal m3<br />
3114250000 Crush Pavement m3<br />
3114261000 Handle Rubble at Crusher m3<br />
3114262000 Crush Rubble m3<br />
3114263000 Crush RAP t<br />
3114300000 Utility Removals LS<br />
3114310000 Sewer & Watermain Removals m<br />
3114311000 Remove Subdrains m<br />
3114312000 Remove Watermains m<br />
3114313000 Remove Culverts m<br />
3114314000 Remove Sewers < 500mm m<br />
3114315000 Remove Sewers 500-1000mm m<br />
3114316000 Remove Sewers > 1000mm m<br />
3114320000 Manhole & Catchbasin Removals ea<br />
3114321000 Remove Manholes ea<br />
3114322000 Remove Catchbasins ea<br />
3114323000 Remove Headwalls ea<br />
3114400000 Concrete Removals LS<br />
3114410000 Remove Mass Concrete m3<br />
3114411000 Breakout Concrete m3<br />
3114412000 Load Rubble m3<br />
3114413000 Concrete Disposal m3<br />
3114420000 Remove Footing Concrete m3<br />
3114422000 Load Rubble m3<br />
3114423000 Concrete Disposal m3<br />
3120421000 Breakout Concrete m3<br />
3114430000 Remove Substructure Concrete m3<br />
3114431000 Breakout Concrete m3<br />
3114432000 Load Rubble m3<br />
3114433000 Concrete Disposal m3<br />
3114440000 Remove Deck Concrete m3<br />
3114441000 Sawcut Concrete m<br />
3114442000 Lift Off Concrete Slabs m3<br />
3114443000 Breakout Concrete m3<br />
3114444000 Load Rubble m3<br />
3114445000 Concrete Disposal m3<br />
3114450000 Remove Approach Slab Concrete m3<br />
03/01/2009 1:04:57 PM Page No 33 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3114451000 Breakout Concrete m3<br />
3114452000 Concrete Disposal m3<br />
3114452000 Load Rubble m3<br />
3114460000 Remove Barrier Wall Concrete m3<br />
3114461000 Breakout Concrete m3<br />
3114462000 Load Rubble m3<br />
3114463000 Concrete Disposal m3<br />
3114470000 Remove Wall Concrete m3<br />
3114471000 Breakout Concrete m3<br />
3114472000 Load Rubble m3<br />
3114473000 Concrete Disposal m3<br />
3114480000 Remove Culvert Concrete m3<br />
3114481000 Breakout Concrete m3<br />
3114482000 Load Rubble m3<br />
3114483000 Concrete Disposal m3<br />
3114490000 Remove Utility Chambers m3<br />
3114491000 Breakout Concrete m3<br />
3114492000 Load Rubble m3<br />
3114493000 Concrete Disposal m3<br />
3114500000 Building Removals m3<br />
3114510000 Demolish Building Shell m3<br />
3114511000 Demolish Exterior Walls m2<br />
3114511100 Breakout Walls m2<br />
3114511200 Load Rubble m3<br />
3114511300 Disposal m3<br />
3114512000 Demolish Concrete Frame m3<br />
3114512100 Breakout Concrete m3<br />
3114512200 Load Rubble m3<br />
3114512300 Concrete Disposal m3<br />
3114513000 Demolish Building Structural Steel t<br />
3114473000 Dispose of Structural Steel m3<br />
3114513100 Cut Structural Steel t<br />
3114513200 Load Cut Steel m3<br />
3114520000 Gut Building Interior m3<br />
3114521000 Remove Ceilings m2<br />
3114522000 Remove Partition Walls m2<br />
3114523000 Remove Masonry Walls m2<br />
3114524000 Remove Windows m2<br />
3114600000 Pile & Shoring Removals LS<br />
3114610000 Remove Soldier Pile Wall m2<br />
3114611000 Extract H- Piles m<br />
3114612000 Remove Lagging m2<br />
3114613000 Remove Anchors ea<br />
3114614000 Remove Walers & Bracing t<br />
3114615000 Dispose of Shoring Rubble m2<br />
3114616000 Load Shoring Rubble m2<br />
3114620000 Remove Sheetpile Wall m2<br />
3114621000 Extract Sheetpiles m2<br />
3114622000 Remove Anchors ea<br />
3114623000 Remove Walers & Bracing t<br />
3114624000 Dispose of Shoring Rubble m2<br />
3114625000 Load Shoring Rubble m2<br />
3115000000 Utility Adjustments ea<br />
3115100000 Cleanout Manholes & Catchbasins ea<br />
3115200000 Cleanout Sewers m<br />
3115300000 Break Into Manholes & Catchbasins ea<br />
3115400000 Adjust Manholes & Catchbasins ea<br />
3115500000 Adjust Valve Boxes ea<br />
3115600000 Plug Utilities ea<br />
3115700000 Inspect Utilities m<br />
3115800000 Grout Utility Line m3<br />
3115900000 Sandfill Utility Line m3<br />
3116000000 Site Remediation m2<br />
3115100000 Environmental Mitigation ha<br />
3115200000 Hazardous Cleanup t<br />
3120 Earthwork LS<br />
3121000000 Dewatering month<br />
3121100000 Casual Dewatering Month<br />
3121110000 Casual Dewatering 2" Pump Month<br />
3121120000 Casual Dewatering 4" Pump Month<br />
03/01/2009 1:04:57 PM Page No 34 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3121200000 Sump Pumping Month<br />
3121210000 Excavate & Install Sump ea<br />
3121220000 Sump Pumping 6" Pump Month<br />
3121230000 Sump Pumping 8" Pump Month<br />
3121300000 Deep Relief Well Dewatering ea<br />
3121310000 Install Deepwells m<br />
3121320000 Operate Deepwells Day<br />
3121400000 French Drains m<br />
3121410000 Excavate Trench m<br />
3121420000 Supply Place Washed Stone t<br />
3121500000 Well Point Dewatering m<br />
3121510000 Well Points ea<br />
3121512000 Jet Points & Install Headers ea<br />
3121513000 Extract Points ea<br />
3121530000 Operate Pump Day<br />
3121600000 Horizontal Dewatering m<br />
3121610000 Drill Horizontal Dewatering Holes m<br />
3121620000 Install Horizontal Dewatering Pipe m<br />
3121700000 Wick Drains m<br />
3121810000 Supply Install Wickdrains m<br />
3121820000 Monitor Wickdrains Month<br />
3122000000 Site Grading m2<br />
3122100000 Grade Roads m2<br />
3122110000 Rough Grade Roads m2<br />
3122111000 Rough Grade Mainline m2<br />
3122112000 Rough Grade Service Roads m2<br />
3122120000 Fine Grade Roads m2<br />
3122121000 Fine Grade Mainline m2<br />
3122122000 Fine Grade Ramps m2<br />
3122123000 Fine Grade Service Roads m2<br />
3122124000 Fine Grade Parking Lots m2<br />
3122200000 Grade Site m2<br />
3122210000 Rough Grade Site m2<br />
3122220000 Fine Grade Site m2<br />
3122300000 Shape Ditches m<br />
3122310000 Shape Deep Ditches m<br />
3122320000 Fine Grade Shallow Ditches m<br />
3123000000 Common Excavation m3<br />
3123100000 Stripping m3<br />
3123110000 Load & Haul Topsoil with Trucks m3<br />
3123111000 Load Topsoil m3<br />
3123112000 Haul Topsoil m3<br />
3123113000 Spread Topsoil at Stockpile m3<br />
3123120000 Stripping With Scrapers m3<br />
3123121000 Load & Haul with Scapers m3<br />
3123122000 Spread Topsoil at Stockpile m3<br />
3123200000 Earth Excavation m3<br />
3123210000 Cut To Fill With Trucks m3<br />
3123211000 Mass Cut to Fill m3<br />
3123211100 Load Trucks at Cut m3<br />
3123211110 Excavate Cut with Backhoe m3<br />
3123211120 Excavate Cut with Loader m3<br />
3123211200 Haul with Trucks m3<br />
3123211210 Truck Haul (0-500m) 800 ft m3<br />
3123211220 Truck Haul (500-1000m) 2500 ft m3<br />
3123211230 Truck Haul (1000-1500m) 4100ft m3<br />
3123211240 Truck Haul (1500-2000m) 5700 ft m3<br />
3123211250 Truck Haul (2000-3000m) 8200 ft m3<br />
3123211260 Truck Haul (3000-4000m) 11500 ft m3<br />
3123211270 Truck Haul (4000-5000m) 14750 ft m3<br />
3123211280 Truck Haul (5000-6000m) 18000 ft m3<br />
3123211300 Spread & Compact Fill m3<br />
3123211310 Spread & Compact Fill with D10 m3<br />
3123211320 Spread & Compact Fill with D9 m3<br />
3123212000 Grade Cut to Fill m3<br />
3123112100 Load Trucks at Cut m3<br />
3123112110 Excavate Cut with Backhoe m3<br />
3123112120 Excavate Cut with Loader m3<br />
3123112200 Haul with Off Highway Trucks m3<br />
3123112210 Truck Haul (0-500m) 800 ft m3<br />
3123112220 Truck Haul (500-1000m) 2500 ft m3<br />
03/01/2009 1:04:57 PM Page No 35 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3123112230 Truck Haul (1000-1500m) 4100ft m3<br />
3123112240 Truck Haul (1500-2000m) 5700 ft m3<br />
3123112250 Truck Haul (2000-3000m) 8200 ft m3<br />
3123112260 Truck Haul (3000-4000m) 11500 ft m3<br />
3123112270 Truck Haul (4000-5000m) 14750 ft m3<br />
3123112280 Truck Haul (5000-6000m) 18000 ft m3<br />
3123112300 Spread & Compact Fill m3<br />
3123112310 Spread & Compact Fill with D9 m3<br />
3123112320 Spread & Compact Fill with D8 m3<br />
3123213000 Road Cut to Fill m3<br />
3123113100 Load Trucks at Cut m3<br />
3123113110 Excavate Cut with Backhoe m3<br />
3123113120 Excavate Cut with Loader m3<br />
3123113200 Haul with Highway Trucks m3<br />
3123113210 Truck Haul (0-500m) 800 ft m3<br />
3123113220 Truck Haul (500-1000m) 2500 ft m3<br />
3123113230 Truck Haul (1000-1500m) 4100ft m3<br />
3123113240 Truck Haul (1500-2000m) 5700 ft m3<br />
3123113250 Truck Haul (2000-3000m) 8200 ft m3<br />
3123113260 Truck Haul (3000-4000m) 11500 ft m3<br />
3123113270 Truck Haul (4000-5000m) 14750 ft m3<br />
3123113280 Truck Haul (5000-6000m) 18000 ft m3<br />
3123113300 Spread & Compact Fill m3<br />
3123113310 Spread & Compact Fill with D7 m3<br />
3123113320 Spread & Compact Fill with D6 m3<br />
3123220000 Cut To Fill With Scrapers m3<br />
3123221000 Mass Cut to Fill with Scapers m3<br />
3123221100 Load Haul with Scrapers m3<br />
3123221110 Scraper Haul (0-300m) 500ft m3<br />
3123221120 Scraper Haul (300-600m) 1500ft m3<br />
3123221130 Scraper Haul (600-900m) 2500ft m3<br />
3123221140 Scraper Haul (900-1200m) 3800ft m3<br />
3123221150 Scraper Haul (1200-1500m) 4500ft m3<br />
3123221200 Push, Spread & Compact m3<br />
3123221210 Push Scrapers m3<br />
3123221220 Spread & Compact Fill m3<br />
3123222000 Grade Cut to Fill with Scapers m3<br />
3123122100 Load Haul with Scrapers m3<br />
3123122110 Scraper Haul (0-300m) 500ft m3<br />
3123122120 Scraper Haul (300-600m) 1500ft m3<br />
3123122130 Scraper Haul (600-900m) 2500ft m3<br />
3123122140 Scraper Haul (900-1200m) 3800ft m3<br />
3123122150 Scraper Haul (1200-1500m) 4500ft m3<br />
3123122200 Push, Spread & Compact m3<br />
3123122210 Push Scrapers m3<br />
3123122220 Spread & Compact Fill m3<br />
3123223000 Road Cut to Fill with Scapers m3<br />
3123123100 Load Haul with Scrapers m3<br />
3123123110 Scraper Haul (0-300m) 500ft m3<br />
3123123120 Scraper Haul (300-600m) 1500ft m3<br />
3123123130 Scraper Haul (600-900m) 2500ft m3<br />
3123123140 Scraper Haul (900-1200m) 3800ft m3<br />
3123123150 Scraper Haul (1200-1500m) 4500ft m3<br />
3123123200 Push, Spread & Compact m3<br />
3123123210 Push Scrapers m3<br />
3123123220 Spread & Compact Fill m3<br />
3123230000 Dozer Push m3<br />
3123231000 Push with Dozer m3<br />
3123231000 Push with D8 Dozer m3<br />
3123232000 Push with D9 Dozer m3<br />
3123233000 Push with D10 Dozer m3<br />
3123234000 Push with D11 Dozer m3<br />
3123232000 Spread with Dozer m3<br />
3123232100 Spread Dirt 250 Hsp D7 Dozer m3<br />
3123232200 Spread Dirt 305 Hsp D8 Dozer m3<br />
3123232300 Spread Dirt 400 Hsp D9 Dozer m3<br />
3123232400 Spread Dirt 570 Hsp D10 Dozer m3<br />
3123232500 Spread Dirt 850 Hsp D11 Dozer m3<br />
3123233000 Tram with Loader m3<br />
3123233100 Tram with 7.5CY 988 Loader m3<br />
3123233200 Tram with 13.5CY 992 Loader m3<br />
03/01/2009 1:04:57 PM Page No 36 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3123240000 Sidecast m3<br />
3123410000 Sidecast with 2CY Dragline m3<br />
3123420000 Sidecast with 4CY Dragline m3<br />
3123300000 Condition Embankment m3<br />
3123310000 Scarify & Recondition m3<br />
3123320000 Apply Water to Fill m3<br />
3123321000 Apply Water 1000 Gallon Truck m3<br />
3123322000 Apply Water 3000 Gallon Truck m3<br />
3123323000 Apply Water 5000 Gallon Tanker m3<br />
3123324000 Apply Water 8000 Gallon Tanker m3<br />
3123330000 Trim Embankment Fill m3<br />
3123400000 Grade Slopes m2<br />
3123410000 Rough Grade Slopes m2<br />
3123420000 Fine Grade Slopes m2<br />
3123500000 Maintain Haul Roads m2<br />
3123510000 Grade Haul Roads m2<br />
3123520000 Sweep and Clean Roads hr<br />
3124000000 Structural Excavation m3<br />
3124100000 Structural Excavation m3<br />
3124100000 Footing Excavation m3<br />
3124110000 Excavate Pad Footings m3<br />
3124111000 Excavate & Stockpile m3<br />
3124111100 Excavate m3<br />
3124111110 Haul m3<br />
3124111120 Spread m3<br />
3124111100 Excavate & Dispose m3<br />
3124111100 Excavate m3<br />
3124111110 Haul m3<br />
3124111120 Dump m3<br />
3124111000 Excavate Strip Footings m3<br />
3124111000 Excavate & Stockpile m3<br />
3124111100 Excavate m3<br />
3124111110 Haul m3<br />
3124111120 Spread m3<br />
3124111100 Excavate & Dispose m3<br />
3124111100 Excavate m3<br />
3124111110 Haul m3<br />
3124111120 Dump m3<br />
3124112000 Excavate Spread Footings m3<br />
3124112100 Excavate & Stockpile m3<br />
3124112110 Excavate m3<br />
3124112120 Haul m3<br />
3124112130 Spread m3<br />
3124112200 Excavate & Dispose m3<br />
3124112210 Excavate m3<br />
3124112220 Haul m3<br />
3124112230 Dump m3<br />
3124110000 Building Excavation m3<br />
3124111000 Excavate & Stockpile m3<br />
3124111100 Excavate m3<br />
3124111200 Haul m3<br />
3124111300 Spread m3<br />
3124112000 Excavate & Dispose m3<br />
3124112100 Excavate m3<br />
3124112200 Haul m3<br />
3124112300 Dump m3<br />
3124120000 Excavate for Building Services m3<br />
3124121000 Excavate For Mechanical Piping m3<br />
3711311000 Excavate m3<br />
3711312000 Haul m3<br />
3711313000 Spread m3<br />
3124122000 Excavate for Electrical Services m3<br />
3711321000 Excavate m3<br />
3711322000 Haul m3<br />
3711323000 Spread m3<br />
3124200000 Foundation Preparation m2<br />
3124210000 Prepare Earth Subgrade m2<br />
3124220000 Clean Rock for Concrete m2<br />
3124300000 Structural Backfill m3<br />
3124310000 Native Backfill m3<br />
3124311000 Load Backfill m3<br />
03/01/2009 1:04:57 PM Page No 37 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3124312000 Haul Backfill m3<br />
3124313000 Place Backfill m3<br />
3124320000 Granular Backfill m3<br />
3124321000 Compacted Granular Backfill m3<br />
3124322000 Unshrinkable Backfill m3<br />
3125000000 Erosion Control m2<br />
3125100000 Geotextile Fabrics m2<br />
3125110000 Filter Fabric m2<br />
3125120000 Erosion Mats m2<br />
3125130000 Geogrids m2<br />
3125200000 Silt Fences m<br />
3125210000 Light Duty Silt Fence m<br />
3125220000 Heavy Duty Silt Fences m<br />
3125300000 Sediment Traps ea<br />
3125310000 Straw Bale Flow Checks ea<br />
3125320000 Rock Flow Checks ea<br />
3125400000 Aquatic Habitat m2<br />
3125410000 Riparian Planting m2<br />
3125500000 Dust Control m2<br />
3125510000 Apply Water for Dust Control m2<br />
3125520000 Apply Calcium for Dust Control t<br />
3126000000 Subgrade Preparation m2<br />
3126100000 Subgrade Preparation Roads m2<br />
3126110000 Subgrade Preparation Roads m2<br />
3126120000 Scarify & Compact Road Subgrade m2<br />
3126200000 Subgrade Preparation for Curb m<br />
3126210000 Fine Grade For Curbs m<br />
3126220000 Backfill Behind Curbs m<br />
3126300000 Subgrade Preparation Sidewalks m2<br />
3126310000 Fine Grade For Sidewalk m2<br />
3126320000 Place Granular Under Sidewalk t<br />
3126330000 Backfill Behind Sidewalk m2<br />
3126400000 Subgrade Preparation Pavers m2<br />
3126410000 Fine Grade for Pavers m2<br />
3126420000 Place Granular Under Pavers t<br />
3126500000 Subgrade Preparation Slab on Grade m2<br />
3126510000 Fine Grade For Slab on Grade m2<br />
3126520000 Place Granular under Slab on Grade t<br />
3126600000 Subgrade Preparation Foundations m2<br />
3126410000 Prepare Earth for Foundations m2<br />
3126420000 Clean Rock for Foundations m2<br />
3132000000 Soil Stabilization m3<br />
3132100000 Asphalt Soil Stabilization m3<br />
3132200000 Lime Soil Stabilization m3<br />
3132300000 Cement Stabilized Base m3<br />
3133000000 Rock Stabilization m2<br />
3133100000 Rock Anchors m<br />
3133110000 Drill Rock Anchors m<br />
3133120000 Grout Rock Anchors m<br />
3133200000 Drill & Grout Rock Bolts m<br />
3133210000 Drill & Grout Rock Bolts off High Face m<br />
3133220000 Drill & Grout Rock Bolts with Winch m<br />
3133230000 Drill & Grout Rock Bolts off Muckpile m<br />
3133240000 Drill & Grout Rock Bolts with Hydraulic Drill m<br />
3133300000 Wire Mesh m2<br />
3133310000 Drill Mesh Pins ea<br />
3133320000 Install Mesh of Muckpile m2<br />
3133330000 Hoist & Drape Mesh m2<br />
3133400000 Shotcrete m3<br />
3133410000 Wet Mix Shotcrete m3<br />
3133420000 Dry Mix Shotcrete m3<br />
3133500000 Rockfall Fence m<br />
3133510000 Drill Rockfall Fence Posts ea<br />
3133520000 Supply Place Rockfall Fence m<br />
3134000000 Rock Excavation m3<br />
3134100000 Drill & Blast Rock m3<br />
3134101000 Drill Blast Quarry Rock m3<br />
3134101100 Drill Blast Quarry Rock m<br />
3134101200 Handle Blasting Mats m3<br />
3134102000 Drill & Blast Mass Rock m3<br />
3134101100 Drill Blast Mass Rock m<br />
03/01/2009 1:04:57 PM Page No 38 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3134101200 Handle Blasting Mats m3<br />
3134102500 Drill & Blast Bulk Powerhouse m3<br />
3134101100 Drill Blast Mass Rock m<br />
3134101200 Handle Blasting Mats m3<br />
3134103000 Drill & Blast Grade Rock m3<br />
3134103100 Drill Blast Grade Rock m<br />
3134103200 Handle Blasting Mats m3<br />
3134104000 Drill & Blast Intake Channel m3<br />
3134104100 Drill Blast Grade Rock m<br />
3134104200 Handle Blasting Mats m3<br />
3134105000 Drill & Blast Powerhouse Rock m3<br />
3134105100 Drill Blast Powerhouse Rock m<br />
3134105200 Handle Blasting Mats m3<br />
3134106000 Drill & Blast Sliver Rock m3<br />
3134106100 Drill Blast Sliver Rock m<br />
3134106200 Handle Blasting Mats m3<br />
3134107000 Drill & Blast Road Rock m3<br />
3134107100 Drill Blast Road Rock m<br />
3134107200 Handle Blasting Mats m3<br />
3134108000 Drill & Blast Ditch Rock m3<br />
3134108100 Drill Blast Ditch Rock m<br />
3134108200 Handle Blasting Mats m3<br />
3134109000 Drill & Blast Trench Rock m3<br />
3134109100 Drill Blast Trench Rock m<br />
3134109200 Handle Blasting Mats m3<br />
3134110000 Drill & Blast Structural Rock m3<br />
3134110100 Drill Blast Structural Rock m<br />
3134110200 Handle Blasting Mats m3<br />
3134200000 Prepare Rock Face m2<br />
3139210000 Drill Blast Preshear m<br />
3139220000 Scaling Rock Face m2<br />
3134300000 Excavate Blasted Rock m3<br />
3139310000 Excavate Quarry Rock m3<br />
3139311000 Load Rock m3<br />
3139312000 Haul Rock m3<br />
3139313000 Spread Rock m3<br />
3139314000 Maintain Haul Road m3<br />
3139315000 Trim Rock m3<br />
3139320000 Excavate Mass Rock m3<br />
3139321000 Load Rock m3<br />
3139322000 Haul Rock m3<br />
3139323000 Spread Rock m3<br />
3139324000 Maintain Haul Road m3<br />
3139325000 Trim Rock m3<br />
3139330000 Excavate Grade Rock m3<br />
3139331000 Load Rock m3<br />
3139332000 Haul Rock m3<br />
3139333000 Spread Rock m3<br />
3139334000 Maintain Haul Road m3<br />
3139335000 Trim Rock m3<br />
3139340000 Excavate Sliver Rock m3<br />
3139341000 Load Rock m3<br />
3139342000 Haul Rock m3<br />
3139343000 Spread Rock m3<br />
3139344000 Maintain Haul Road m3<br />
3139345000 Trim Rock m3<br />
3139350000 Excavate Road Rock m3<br />
3139351000 Load Rock m3<br />
3139352000 Haul Rock m3<br />
3139353000 Spread Rock m3<br />
3139354000 Maintain Haul Road m3<br />
3139355000 Trim Rock m3<br />
3139360000 Excavate Trench Rock m3<br />
3139361000 Load Rock m3<br />
3139362000 Haul Rock m3<br />
3139363000 Spread Rock m3<br />
3139364000 Maintain Haul Road m3<br />
3139365000 Trim Rock m3<br />
3139370000 Excavate Ditch Rock m3<br />
3139371000 Load Rock m3<br />
3139372000 Haul Rock m3<br />
03/01/2009 1:04:57 PM Page No 39 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3139373000 Spread Rock m3<br />
3139374000 Maintain Haul Road m3<br />
3139375000 Trim Rock m3<br />
3139380000 Excavate Structural Rock m3<br />
3139381000 Load Rock m3<br />
3139382000 Haul Rock m3<br />
3139383000 Spread Rock m3<br />
3139384000 Maintain Haul Road m3<br />
3139385000 Trim Rock m3<br />
3134400000 Break Rock m3<br />
3139410000 Break Rock- Hydraulic Breaker m3<br />
3139420000 Break Rock- Jackhammer m3<br />
3135000000 Slope Protection m2<br />
3135100000 Geosynthetic Slope Protection m2<br />
3135110000 Geogrid Slope Protrection m2<br />
3135120000 Geotextile Slope Protection m2<br />
3135130000 Mulch & Netting Slope Protection m2<br />
3135200000 Slope Paving m2<br />
3135210000 Concrete Slope Ptrotection m2<br />
3135220000 Precast Concrete Slope Protection m2<br />
3135230000 Masonry Slope Protection m2<br />
3135300000 Gabions m3<br />
3135310000 Gabion Walls m3<br />
3135320000 Gabion Erosion Protection m3<br />
3135400000 Riprap m3<br />
3135410000 Handplaced Riprap m3<br />
3135420000 Machine Placed Riprap m3<br />
3135500000 Armour Stone t<br />
3135510000 Sort Armour Stone t<br />
3135520000 Rehandle Armour Stone t<br />
3135530000 Haul Armour Stone t<br />
3135540000 Place Armour Stone t<br />
3140 Shoring m2<br />
3141100000 Soldier Piles & Lagging m2<br />
3141110000 Soldier Piles vm<br />
3141111000 Mobilize Piling Equipment LS<br />
3141112000 Drive Soldier Piles vm<br />
3141113000 Splice Soldier Piles ea<br />
3141114000 Extract Soldier Piles vm<br />
3141115000 Supply Soldier Piles t<br />
3141116000 Auger For Soldier Piles vm<br />
3141117000 Concrete Infill m3<br />
3141120000 Lagging m2<br />
3141121000 Supply Install Lagging m2<br />
3141121100 Supply Lagging BF<br />
3141121200 Place Lagging m2<br />
3141122000 Remove Lagging m2<br />
3141123000 Salvage Lagging m2<br />
3141200000 Sheetpiling m2<br />
3141210000 Mobilize Sheetpiling Equipment LS<br />
3141220000 Drive Sheetpiles m2<br />
3141221000 Drive Sheetpiles m2<br />
3141222000 SheetpileTemplate t<br />
3141230000 Splice Sheetpiles ea<br />
3141240000 Cut Off Sheetpiles m<br />
3141250000 Extract Sheetpiles m2<br />
3141260000 Supply Sheetpiles t<br />
3141270000 Boulder Removals Hour<br />
3141300000 Shotcrete & Soil Nailing m2<br />
3141310000 Apply Shotcrete m3<br />
3141320000 Apply Wire Mesh m2<br />
3141330000 Drill Soil Nails m<br />
3141340000 Grout Soil Nails m<br />
3141400000 Tieback Anchors m<br />
3141410000 Drill Tieback Anchors m<br />
3141420000 Grout Tieback Anchors m<br />
3141500000 Walers & Bracing m2<br />
3141510000 Supply Walers and Bracing LS<br />
3141520000 Install Walers and Bracing LS<br />
3141530000 Remove Walers and Bracing LS<br />
03/01/2009 1:04:57 PM Page No 40 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3141600000 Underpinning LS<br />
3141700000 Support Existing Utilities m2<br />
3160 Piling LS<br />
3162000000 Driven Piles vm<br />
3162100000 Mobe For Pile Driving ea<br />
3162200000 Precast Concrete Piles m<br />
3162210000 Supply Sheet Piles t<br />
3162220000 Unload & Handle Sheet Piles t<br />
3162230000 Drive Piles m<br />
3162300000 Steel H-Piles m<br />
3162310000 Supply H-Piles t<br />
3162320000 Unload & Handle Piles t<br />
3162330000 Drive Piles m<br />
3162400000 Steel Tube Piles m<br />
3162410000 Supply Pipe Piles t<br />
3162420000 Unload & Handle Piles t<br />
3162430000 Drive Piles m<br />
3162500000 Steel Sheet Piles vm<br />
3162510000 Supply Sheet Piles t<br />
3162520000 Unload & Handle Sheet Piles t<br />
3162530000 Drive Sheet Piles m2<br />
3162600000 Timber Piles vm<br />
3162700000 Cut Off Piles m<br />
3162710000 Cut Off H-Piles ea<br />
3162720000 Cut Off Sheet Piles m<br />
3162800000 Pile Shoes ea<br />
3162810000 Rock Points ea<br />
3162820000 Shoe Plates ea<br />
3162900000 Pile Splices ea<br />
3163000000 Pile Shafts m<br />
3163100000 Drive Large Diameter Pipe Piles (concrete partial depth) m<br />
3163110000 Supply 1800 mm Pipe Piles (25mm wall) m<br />
3163120000 Handle Large Dia Pipe Piles t<br />
3163130000 Splice Piles ea<br />
3163131000 Horizontal Splices ea<br />
3163131100 Setup Splice Beds LS<br />
3163131200 Horizontal Splices ea<br />
3163131300 Purchase Track Welder ea<br />
3163132000 Vertical Splices ea<br />
3163133000 Pile Splice Accessories ea<br />
3163134000 Splice Testing ea<br />
3163140000 Drive 1800 mm Pipe Piles m<br />
3163141000 Mobe Pile Driving Rig ea<br />
3163142000 Assemble Template ea<br />
3163143000 Move & Reset Template ea<br />
3163144000 Stick & Drive Piles ea<br />
3163145000 PDA Testing Downtime ea<br />
3163146000 Cutoff Piles ea<br />
3163147000 Move Operation to Next Pier ea<br />
3163150000 Excavate & Cleanout Piles (top 60%) m3<br />
3163151000 Setup to Clean Piles ea<br />
3163152000 Excavate Piles m3<br />
3163153000 Supply Place Bottom Plugs ea<br />
3163154000 Dewater Piles ea<br />
3163155000 Dispose of Spoil m3<br />
3163156000 Move Operation to Next Pier ea<br />
3163160000 Concrete Piles (top 60%) m3<br />
3163161000 Supply Place Rebar Cages t<br />
3163161100 Supply Assemble Rebar Cages t<br />
3163161200 Place Rebar Cages ea<br />
3163162000 Supply Place Concrete m3<br />
3163200000 Drilled Shafts (concrete full depth) m<br />
3163210000 Supply 1800 mm Permanent Casing m<br />
3163220000 Handle Large Dia Pipe Piles t<br />
3163230000 Splice Piles ea<br />
3163231000 Horizontal Splices ea<br />
3163231100 Setup Splice Beds LS<br />
3163231200 Horizontal Splices ea<br />
3163231300 Purchase Track Welder ea<br />
3163232000 Vertical Splices ea<br />
03/01/2009 1:04:57 PM Page No 41 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3163233000 Pile Splice Accessories ea<br />
3163234000 Splice Testing ea<br />
3163240000 Drill 1800 mm Casing m<br />
3163241000 Mobe Pile Driving Rig ea<br />
3163242000 Supply Install Crane Matts ea<br />
3163243000 Assemble Template ea<br />
3163244000 Move & Reset Template ea<br />
3163245000 Weld on Cutting Teeth ea<br />
3163246000 Drill & Sink Casing ea<br />
3163247000 Cutoff Piles ea<br />
3163250000 Excavate & Cleanout Piles m3<br />
3163251000 Mobe Cleanout Rig ea<br />
3163252000 Cleanout Bottom ea<br />
3163253000 Conduct Load Tests ea<br />
3163254000 Dispose of Spoil m3<br />
3163255000 Onsite Moves ea<br />
3163260000 Concrete Piles m3<br />
3163261000 Supply Place Rebar Cages t<br />
3163261100 Supply Assemble Rebar Cages t<br />
3163261200 Place Rebar Cages ea<br />
3163262000 Supply Install CSL (Cross Hole Sonic Logging) Tubes m<br />
3163263000 Supply Place Concrete m3<br />
3163264000 Prepare Construction Joints ea<br />
3163265000 Grout CSL (Cross Hole Sonic Logging) Tubes m<br />
3163266000 Conduct CSL (Cross Hole Sonic Logging) Tests ea<br />
3163270000 Static Load Test ea<br />
3164000000 Caissons m<br />
3164100000 Box Caissons m<br />
3164200000 Open Caissons m<br />
3164300000 Sheeted Caissons m<br />
3164400000 Remove Spoils m3<br />
3164500000 Other Caissons m<br />
3168000000 Foundation Anchors m<br />
3168100000 Tendon Anchor Systems m<br />
3168200000 Bar Anchor Systems m<br />
3168300000 Other Foundation Anchors m<br />
3210 Paving m2<br />
3211000000 Aggregate Base Courses t<br />
3211100000 Supply Aggregates t<br />
3211110000 Purchase Aggregates t<br />
3211120000 Process Aggregates t<br />
3211121000 Pit Preparation m2<br />
3211121100 Construct Access Road LS<br />
3211121200 Clear Borrow Pit ha<br />
3211121300 Strip Borrow Pit m2<br />
3211121400 Pit Restoration m2<br />
3211122000 Move & Setup Plant t<br />
3211122100 Move Plant In LS<br />
3211122200 Set Up Plant ha<br />
3211122300 Relocate Plant LS<br />
3211122400 Tear Down Plant LS<br />
3211122500 Move Plant Out LS<br />
3211122600 Set-Up / Start Up Crusher ea<br />
3211122700 Move Crusher For Blasting ea<br />
3211123000 Supply Raw Material m3<br />
3211123100 Produce Shot Rock t<br />
3211123200 Produce Pitrun Gravel t<br />
3211123300 Royalties t<br />
3211124000 Process Aggregates t<br />
3211124100 Load Raw Material t<br />
3211124200 Crush Screenings t<br />
3211124300 Stockpile Product t<br />
3211124400 Haul Aggregates In Pit t<br />
3211124500 Change Product t<br />
3211124600 Other Processing t<br />
3211124700 Additional Wear Factor t<br />
3211125000 Load Product t<br />
3211126000 Crushing Quality Control t<br />
3211127000 Operate Scales t<br />
3211128000 Wayside Permits LS<br />
03/01/2009 1:04:57 PM Page No 42 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3211129000 Rehandle In Stockpiles t<br />
3211200000 Haul Aggregates t<br />
3211210000 Haul Granular Base t<br />
3211220000 Haul Granular Sub Base t<br />
3211230000 Haul Crushed Stone t<br />
3211240000 Haul Pitrun (SSM) t<br />
3211250000 Haul Aggregate From Stockpiles t<br />
3211300000 Place Aggregates t<br />
3211310000 Place Runway Base Course t<br />
3211311000 Place Runway Base t<br />
3211311100 Spread & Compact Aggregate t<br />
3211311200 Fine Grade Aggregate m2<br />
3211311300 Moisture Condition Aggregates t<br />
3211312000 Place Runway Sub Base t<br />
3211312100 Spread & Compact Aggregate t<br />
3211312200 Moisture Condition Aggregates t<br />
3211320000 Place Highway Base Courses t<br />
3211321000 Place Highway Base t<br />
3211321100 Spread & Compact Aggregate t<br />
3211321200 Fine Grade Aggregate m2<br />
3211321300 Moisture Condition Aggregates t<br />
3211322000 Place Highway Subbase t<br />
3211322100 Spread & Compact Aggregate t<br />
3211322200 Moisture Condition Aggregates t<br />
3211330000 Place Road Base Courses t<br />
3211331000 Place Road Base t<br />
3211331100 Spread & Compact Aggregate t<br />
3211331200 Fine Grade Aggregate m2<br />
3211331300 Moisture Condition Aggregates t<br />
3211332000 Place Road Subbase t<br />
3211332100 Spread & Compact Aggregate t<br />
3211332200 Moisture Condition Aggregates t<br />
3211340000 Place Ramp Base Courses t<br />
3211341000 Place Ramp Base t<br />
3211341100 Spread & Compact Aggregate t<br />
3211341200 Fine Grade Aggregate m2<br />
3211341300 Moisture Condition Aggregates t<br />
3211342000 Place Ramp Subbase t<br />
3211342100 Spread & Compact Aggregate t<br />
3211342200 Moisture Condition Aggregates t<br />
3211350000 Place Detour Base Courses t<br />
3211351000 Place Detour Base t<br />
3211351100 Spread & Compact Aggregate t<br />
3211351200 Fine Grade Aggregate m2<br />
3211351300 Moisture Condition Aggregates t<br />
3211352000 Place Detour Subbase t<br />
3211352100 Spread & Compact Aggregate t<br />
3211352200 Moisture Condition Aggregates t<br />
3211360000 Place Shoulder Base Course t<br />
3211361000 Place Shoulder Base t<br />
3211361100 Spread & Compact Aggregate t<br />
3211361200 Fine Grade Aggregate m2<br />
3211361300 Moisture Condition Aggregates t<br />
3211362000 Place Shoulder Subbase t<br />
3211362100 Spread & Compact Aggregate t<br />
3211362200 Moisture Condition Aggregates t<br />
3211370000 Place Parking Base Course t<br />
3211371000 Place Parking Lot Base t<br />
3211371100 Spread & Compact Aggregate t<br />
3211371200 Fine Grade Aggregate m2<br />
3211371300 Moisture Condition Aggregates t<br />
3211372000 Place Parking Lot Subbase t<br />
3211372100 Spread & Compact Aggregate t<br />
3211372200 Moisture Condition Aggregates t<br />
3211380000 Place Granular Under Sidewalk & Curbs t<br />
3211381000 Place Granular Under Sidewalk m2<br />
3211382000 Place Granular Under Curbs m<br />
3211400000 Treated Base Courses t<br />
3211410000 Cement Treated Base t<br />
3211420000 Bituminous Base t<br />
3212000000 Asphalt Pavement t<br />
03/01/2009 1:04:57 PM Page No 43 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3212100000 Supply Asphalt LS<br />
3212110000 Purchase Asphalt t<br />
3212111000 Buy External Asphalt t<br />
3212112000 Buy Internal Asphalt t<br />
3212120000 Batch Asphalt t<br />
3212121000 Move & Setup Asphalt Plant t<br />
3212121100 Mobe-Demobe Asphalt Plant LS<br />
3212121200 Rent & Prepare Plant Site Month<br />
3212121300 Setup Asphalt Plant LS<br />
3212122000 Supply Bunker Fuel t<br />
3212123000 Asphalt Quality Control t<br />
3212123100 Asphalt Mix Testing t<br />
3212123200 Asphalt Smoothness Testing t<br />
3212124000 Sales Taxes t<br />
3212124100 Sales Tax On Asphalt Cement t<br />
3212124200 Sales Tax On Bunker Fuel L<br />
3212124300 Sales Tax On Aggregates t<br />
3212124400 Sales Tax On Mixing t<br />
3212125000 Supply Aggregates t<br />
3212125100 Buy Aggregate t<br />
3212125200 Haul Asphalt Aggregates t<br />
3212125300 Process Aggregates t<br />
3212125400 Stockpile Aggregates t<br />
3212126000 Mix Asphalt t<br />
3212127000 Supply Asphalt Cement t<br />
3212127100 Purchase Asphalt Cement t<br />
3212127200 Deliver Asphalt Cement t<br />
3212128000 Operate Scales t<br />
3212128100 Setup Scales & Inspection LS<br />
3212128200 Operate Scales t<br />
3212200000 Haul Asphalt t<br />
3212210000 Haul Asphalt Mainline t<br />
3212220000 Haul Asphalt Service Roads t<br />
3212230000 Haul Asphalt Ramps t<br />
3212240000 Haul Asphalt Detours t<br />
3212250000 Haul Asphalt To Shoulders t<br />
3212260000 Haul Asphalt Padding t<br />
3212270000 Haul Asphalt Parking Lots t<br />
3212280000 Haul Asphalt Bridge Decks t<br />
3212290000 Haul Commercial Asphalt t<br />
3212300000 Place Asphalt t<br />
3212310000 Place Runway Asphalt t<br />
3212311000 Place Runway Surface Course t<br />
3212312000 Place Runway Upper Binder t<br />
3212313000 Place Runway Lower Binder t<br />
3212320000 Place Asphalt Mainline t<br />
3212321000 Place Mainline Surface Asphalt t<br />
3212322000 Place Mainline Upper Binder t<br />
3212323000 Place Mainline Lower Binder t<br />
3212330000 Place Asphalt Service Roads t<br />
3212331000 Place Service Road Surface Asphalt t<br />
3212332000 Place Service Road Base Asphalt t<br />
3212340000 Place Asphalt Ramps t<br />
3212341000 Place Ramps Surface Asphalt t<br />
3212342000 Place Ramps Upper Binder Course t<br />
3212343000 Place Ramps Lower Binder Course t<br />
3212350000 Place Asphalt Detours t<br />
3212360000 Place Asphalt To Shoulders t<br />
3212361000 Place Shoulder Surface Asphalt t<br />
3212362000 Place Shoulder Binder Asphalt t<br />
3212363000 Place Asphalt Spillways t<br />
3212370000 Place Asphalt Padding t<br />
3212380000 Place Asphalt Bridge Decks t<br />
3212390000 Place Commercial Asphalt t<br />
3212391000 Place Asphalt Driveways t<br />
3212392000 Place Asphalt Parking Lots t<br />
3212392000 Place Asphalt Handwork t<br />
3212400000 Temporary Asphalt m2<br />
3212410000 Temporary Rampdowns t<br />
3212420000 Temporary Padding t<br />
3212430000 Temporary Hot Mix t<br />
03/01/2009 1:04:57 PM Page No 44 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3212500000 Grind Asphalt Pavement m2<br />
3212500000 Rehandle RAP t<br />
3212510000 Stockpile RAP Onsite t<br />
3212520000 Screen Rap Onsite t<br />
3212530000 Rehandle RAP Onsite t<br />
3212540000 Haul RAP t<br />
3212550000 Place RAP t<br />
3212500000 Cold Plane Asphalt m2<br />
3212500000 Sawcut Asphalt Pavement m<br />
3212500000 Grind Asphalt Partial Depth m2<br />
3212510000 Grind Mainline m2<br />
3212520000 Grind Tapers & Ramps m2<br />
3212530000 Grind Lap Joint m<br />
3212540000 Grind Butt Joints m<br />
3212600000 Asphalt Surface Preparation m2<br />
3212610000 Clean & Sweep Asphalt m2<br />
3212620000 Asphalt Base Course Prime Coat m2<br />
3212630000 Asphalt Surface Course Tack Coat m2<br />
3212640000 Asphalt Binder m2<br />
3212700000 Pavement Joint Treatment m<br />
3212800000 Pavement Sealing & Patching m2<br />
3212810000 Flexible Pavement Coating m2<br />
3212811000 Chip Seal m2<br />
3212812000 Sand Seal m2<br />
3212820000 Liquid Sealants litre<br />
3212821000 Latex Modified Emulsion m2<br />
3212822000 Slurry Seal m2<br />
3212830000 Asphalt Patching m2<br />
3212831000 Hot Mix Patching m2<br />
3212832000 Cold Mix Patching m2<br />
3212840000 Granular Sealing m2<br />
3212900000 Adjust Utilitiy Covers ea<br />
3212910000 Adjust Manholes ea<br />
3212920000 Adjust Catchbasins ea<br />
3212930000 Adjust Valve Boxes ea<br />
3213000000 Concrete Paving m2<br />
3213100000 Supply Pavement Concrete m3<br />
3213110000 Purchase Ready Mix Concrete m3<br />
3213120000 Batch Concrete m3<br />
3213121000 Move & Setup Concrete Plant m3<br />
3213121100 Move Concrete Plant LS<br />
3213121200 Rent & Prepare Plant Site Month<br />
3213121300 Setup Concrete Plant LS<br />
3213122000 Supply Concrete Materials m3<br />
3213122100 Supply Cement t<br />
3213122200 Supply Coarse Aggregate t<br />
3213122300 Supply Fine Aggregate t<br />
3213122400 Supply Additives m3<br />
3213123000 Batch Concrete m3<br />
3213123100 Handle Aggregates t<br />
3213123200 Operate Batch Plant t<br />
3213124000 Sales Taxes m3<br />
3213125000 Concrete Quality Control m3<br />
3213200000 Haul Pavement Concrete m3<br />
3213300000 Place Concrete Pavement m3<br />
3213310000 Trim Subgrade m2<br />
3213320000 Lay Concrete m3<br />
3213330000 Secondary Finishing m2<br />
3213340000 Cure Concrete Pavement m<br />
3213400000 Sawcut Joints m<br />
3213500000 Joint Fillers m<br />
3213600000 Pavement Reinforcing t<br />
3213610000 Insert Dowels ea<br />
3213620000 Continuous Reinforcing t<br />
3214000000 Unit Pavers m2<br />
3214100000 Pavers m2<br />
3214110000 Brick Pavers m2<br />
3214111000 Fine Grade For Sidewalks m2<br />
3214112000 Place Granular Under Sidewalks t<br />
3214113000 Supply Lay Pavers m2<br />
3214120000 Interlocking Precast Pavers m2<br />
03/01/2009 1:04:57 PM Page No 45 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3214121000 Fine Grade For Sidewalks m2<br />
3214122000 Place Granular Under Sidewalks t<br />
3214123000 Supply Lay Pavers m2<br />
3214130000 Precast Concrete Pavers m2<br />
3214131000 Fine Grade For Sidewalks m2<br />
3214132000 Place Granular Under Sidewalks t<br />
3214133000 Supply Lay Pavers m2<br />
3214140000 Stone Pavers m2<br />
3214141000 Fine Grade For Sidewalks m2<br />
3214142000 Place Granular Under Sidewalks t<br />
3214143000 Supply Lay Pavers m2<br />
3214200000 Bollards ea<br />
3214210000 Concrete Piers ea<br />
3214220000 Pipe Bollards ea<br />
3216000000 Curb & Sidewalk m<br />
3216100000 Concrete Curb & Gutter m<br />
3216110000 Handplaced Concrete Curb & Gutter m<br />
3216111000 Handplaced Concrete Curb with Gutter m<br />
3216112000 Handplaced Barrier Curb m<br />
3216113000 Concrete Gutter Outlets ea<br />
3216120000 Extruded Concrete Curb & Gutter m<br />
3216121000 Extruded Concrete Curb with Gutter m<br />
3216122000 Extruded Barrier Curb m<br />
3216123000 Extruded Gutter m<br />
3216200000 Asphalt Curbs m<br />
3216210000 Asphalt Curbs m<br />
3216220000 Asphalt Spillway m<br />
3216300000 Prefabricated Curbs m<br />
3216310000 Precast Concrete Curb m<br />
3216320000 Curbstone m<br />
3216330000 Timber Curbs m<br />
3216400000 Sidewalks m2<br />
3216410000 Concrete Sidewalks m2<br />
3216411000 Fine Grade For Sidewalks m2<br />
3216412000 Place Granular Under Sidewalks t<br />
3216413000 Sidewalk Joint Fillers m<br />
3216414000 Place & Finish Concrete m3<br />
3216414100 Handplaced Concrete Sidewalk LS<br />
3216414110 Set Strip Edge Forms m2<br />
3216414120 Place Concrete Sidewalk m3<br />
3216414200 Extrude Concrete Sidewalk LS<br />
3216420000 Concrete Wheel Chair Ramp m2<br />
3216430000 Patterned Concrete Sidewalks m2<br />
3216440000 Concrete Islands m2<br />
3216450000 Asphalt Sidewalks m2<br />
3216460000 Wooden Sidewalks m2<br />
3217000000 Paving Markings m<br />
3217100000 Durable Pavement Markings m<br />
3217110000 Durable Pavement Markings m<br />
3217120000 Durable Pavement Symbols LS<br />
3217200000 Painted Traffic Lines m<br />
3217300000 Rumble Strips m2<br />
3217400000 Obliterate Pavement Markings m<br />
3217410000 Blacken Pavement Markings m<br />
3217420000 Grind Pavement Markings m<br />
3217430000 Remove Pavement Markings m<br />
3217440000 Shotblast Pavement Markings m<br />
3217500000 Recessed Pavement Markings m<br />
3217600000 Raised Pavement Markers m<br />
3217700000 Temporary Pavement Markings m<br />
3217710000 Temporary Pavement Marking m<br />
3217720000 Temporary Pavement Symbols ea<br />
3218000000 Special Surfaces m2<br />
3218100000 Synthetic Running Track Surfaces m2<br />
3218200000 Tennis Court Surfacing m2<br />
3218300000 Synthedic Grass Surfacing m2<br />
3230 Site Improvements LS<br />
3231000000 Fences & Gates m<br />
3231100000 Chainlink Fence m<br />
3231110000 Chainlink Fence m<br />
03/01/2009 1:04:57 PM Page No 46 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3231120000 Chainlink Gates ea<br />
3231130000 Relocate Chainlink Fence m<br />
3231140000 Barrier Mounted Chainlink Fence m<br />
3231150000 Chainlink Accessories ea<br />
3231200000 Highway Fence m<br />
3231300000 Barbed Wire Fence m<br />
3231310000 Farm Fence m<br />
3231320000 Brace Panels ea<br />
3231400000 Snow Fence m<br />
3231500000 Plastic Fence m<br />
3231600000 Ornamental Metal Fence m<br />
3231700000 Wood Fence m<br />
3232000000 Guide Rail m<br />
3232100000 Post & Rail m<br />
3232110000 Metal Post & Beam Guide Rail m<br />
3232111000 SBGR W/O Channel m<br />
3232112000 SBGR With Channel m<br />
3232120000 Box Beam m<br />
3232130000 W-Beam Guide Rail m<br />
3232140000 Post & Cable Guide Rail m<br />
3232200000 Guide Posts ea<br />
3232210000 Delineator Posts ea<br />
3232220000 Flexible Guide Posts ea<br />
3232221000 Temporary Flexible Guide Posts ea<br />
3232222000 Relocated Temporary Guide Posts ea<br />
3232300000 End Treatment ea<br />
3232310000 Impact Attenuating Devices ea<br />
3232311000 Transition Rails ea<br />
3232312000 Energy Attenuation Devices ea<br />
3232312100 Eccentric Loaders ea<br />
3232312200 Trend End Treatment ea<br />
3232312300 C.I.A.S. ea<br />
3232312400 Temporary Great ea<br />
3232312500 Temporary Crash Cushion ea<br />
3232313000 Relocate Energy Attenuators ea<br />
3232313100 Relocate Temp Great ea<br />
3232313200 Relocate Crush Cushion ea<br />
3232320000 Anchor Blocks ea<br />
3232330000 Eccentric Loaders ea<br />
3232340000 Extruder ea<br />
3233000000 Concrete Barrier m<br />
3233100000 Cast in Place Concrete Barrier m<br />
3233200000 Precast Concrete Barrier m<br />
3234000000 Traffic Signs ea<br />
3234100000 Post Mounted Signs ea<br />
3234110000 Speed Limit Signs ea<br />
3234120000 Advisory Signs ea<br />
3234130000 Warning Signs ea<br />
3234200000 Breakaway Sign Support <strong>Structure</strong>s ea<br />
3234300000 <strong>Structure</strong> Mounted Signs ea<br />
3234310000 Sign Support Footings ea<br />
3234320000 Overhead Sign Support <strong>Structure</strong>s ea<br />
3234330000 Overhead Signs ea<br />
3235000000 Traffic Signals LS<br />
3235100000 Traffic Signal Heads ea<br />
3235200000 Traffic Signal Controllers ea<br />
3235300000 Flashers & Beacons ea<br />
3235400000 Pedestrian Signal Heads ea<br />
3235500000 Traffic Signal Cables m<br />
3235600000 Predestrian Pushbuttons ea<br />
3235700000 Loop Detectors ea<br />
3236000000 Sound Walls m2<br />
3280 Landscaping LS<br />
3280000000 Irrigation Systems LS<br />
3281000000 Lawn Sprinkler Systems m2<br />
3281100000 Irrigation Pipe m<br />
3281200000 Sprinkler Heads ea<br />
3281300000 Other Sprinkler Costs LS<br />
3282000000 Farm Irrigation Systems m2<br />
3283000000 Drip Irrigation Systems m2<br />
03/01/2009 1:04:57 PM Page No 47 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3291000000 Topsoil m3<br />
3291100000 Supply Place Topsoil on Grade m3<br />
3291110000 Supply Topsoil m3<br />
3291120000 Load Topsoil m3<br />
3291130000 Haul Topsoil m3<br />
3291140000 Spread Topsoil m3<br />
3291200000 Supply Place Topsoil on Slopes m3<br />
3291210000 Supply Topsoil m3<br />
3291220000 Load Topsoil m3<br />
3291230000 Haul Topsoil m3<br />
3291240000 Spread Topsoil m3<br />
3291300000 Supply Place Topsoil in Ditches m3<br />
3291310000 Supply Topsoil m3<br />
3291320000 Load Topsoil m3<br />
3291330000 Haul Topsoil m3<br />
3291340000 Spread Topsoil m3<br />
3292000000 Seed & Sod m2<br />
3292100000 Sodding m2<br />
3292110000 Sodding Staked m2<br />
3292120000 Sodding Unstaked m2<br />
3292200000 Seeding m2<br />
3292210000 Seeding m2<br />
3292220000 Seed & Mulch m2<br />
3292300000 Mulching m2<br />
3293000000 Trees & Plants ea<br />
3293100000 Trees ea<br />
3293110000 Plant New Trees ea<br />
3293120000 Transplant Trees ea<br />
3293200000 Shrubs ea<br />
3293300000 Plants ea<br />
3293500000 Ground Cover m2<br />
3293600000 Riparian Planting LS<br />
3294000000 Landscape Maintenance HA<br />
3294100000 Fertilizing m2<br />
3294200000 Mowing m2<br />
3294300000 Pruning ea<br />
3294400000 Watering MO<br />
3294500000 Landscape Warranty ha<br />
3295000000 Landscaping Accessories m2<br />
3295100000 Landscape Edging m<br />
3295200000 Landscape Timbers m<br />
3295300000 Landscape Planters ea<br />
3295400000 Landscape Grates & Grids m2<br />
3295500000 Landscape Fabrics m2<br />
3296000000 Landscape Walls m2<br />
3300 Utilities LS<br />
3310 Water LS<br />
3311000000 Watermains m<br />
3311100000 Trunk Watermains m<br />
3311110000 Watermain Pipe m<br />
3311111000 400mm Watermain m<br />
3311112000 450mm Watermain m<br />
3311113000 600mm Watermain m<br />
3311120000 Valves & Fittings ea<br />
3311200000 Watermain Distribution m<br />
3311210000 Watermain Pipe m<br />
3311211000 100 mm Watermain m<br />
3311212000 150 mm Watermain m<br />
3311213000 200 mm Watermain m<br />
3311214000 300 mm Watermain m<br />
3311220000 Valves & Fittings ea<br />
3312000000 Water Services ea<br />
3312100000 Municipal Water Services ea<br />
3312200000 Domestic Water Services ea<br />
3312300000 Industrial Water Services ea<br />
3313000000 Fire Hydrants ea<br />
3314000000 Test & Clean Watermain m<br />
3314100000 Pressure Test Watermain m<br />
3314200000 Clean & Disinfect Watermain m<br />
3315000000 Watermain Chambers ea<br />
03/01/2009 1:04:57 PM Page No 48 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3315100000 Valve Chambers ea<br />
3315200000 Drain Chambers ea<br />
3315300000 Air Release Chambers ea<br />
3316000000 Watermain Insulation m3<br />
3320000000 Wells vm<br />
3330 Sanitary LS<br />
3333100000 Sanitary Forcemains m<br />
3333110000 300 mm Sanitary Forcemain m<br />
3333120000 375mm Sanitary Forcemain m<br />
3333200000 Sanitary Sewers m<br />
3333210000 150mm Sanitary Sewer m<br />
3333220000 200mm Sanitary Sewer m<br />
3333230000 250mm Sanitary Sewers m<br />
3333300000 Sanitary Services ea<br />
3333310000 Residential Sanitary Services ea<br />
3333320000 Municipal Sanitary Service ea<br />
3333400000 Sanitary Manholes ea<br />
3333410000 Install Manholes ea<br />
3333420000 Bench Manholes ea<br />
3333430000 Adjust Frames & Grates ea<br />
3336000000 Septic Systems LS<br />
3340 Drainage LS<br />
3342000000 Culverts m<br />
3342100000 Corrugated Pipe Culverts m<br />
3342110000 Small Dia CSP Culverts (
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3342421000 Supply Culvert Concrete m3<br />
3342422000 Place Culvert Invert Concrete m3<br />
3342423000 Place Culvert Box Concrete m3<br />
3342430000 Finish Culvert Concrete m2<br />
3342431000 Point & Patch Culvert m2<br />
3342432000 Rub Finish Culvert m2<br />
3344000000 Storm Sewers m<br />
3344100000 Storm Sewer Mains m<br />
3344110000 Small Dia Storm Sewer (
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3349151000 Supply Place Concrete For Manhole m3<br />
3349153000 Set Strip Formwork For Manholes m2<br />
3349154000 Rebar For Manholes t<br />
3349160000 Adjust Rebuild Manholes ea<br />
3349170000 Break Into Manholes ea<br />
3349200000 Catchbasins ea<br />
3349210000 Supply & Install Catchbasins ea<br />
3349211000 Catchbasins 600 * 1200 ea<br />
3349212000 Catchbasins 600 * 600 ea<br />
3349213000 Catchbasins 600 * 1450 ea<br />
3349220000 Bench Catchbasins ea<br />
3349230000 Adjust Catchbasins ea<br />
3349240000 Catchbasin Frame & Grates ea<br />
3349300000 Headwalls ea<br />
3349500000 Cast in Place Drainage <strong>Structure</strong>s ea<br />
3349510000 Cast in Place Manholes ea<br />
3349520000 Trench Drains ea<br />
3349530000 Airport Runway Manholes ea<br />
3349700000 Concrete Appurtenances m3<br />
3349710000 Supply Set Strip Forms m2<br />
3349720000 Supply Place Concrete Concrete m3<br />
3349730000 Finish Concrete m2<br />
3349800000 Oil Water Separators ea<br />
3349900000 Maintenance & Utility Chambers ea<br />
3349910000 Box Size Utility Chambers ea<br />
3349911000 2400 X 1800 Mm Utility Chamber ea<br />
3349912000 3000 X 2400 Mm Utility Chamber ea<br />
3349920000 Special Box Size Manholes ea<br />
3349921000 3000 X 3800 Mm Utility Manholes ea<br />
3349922000 4200 X 2400 Mm Utility Manhole ea<br />
3349923000 8215 X 5000 Mm Utility Manhole ea<br />
3349930000 Sanitary Blowoff Chambers ea<br />
3350 Pipeline LS<br />
3351000000 Mainline Gas Pipeline m<br />
3351100000 Prepare Right of Way m<br />
3351110000 Clear Right of Way m<br />
3351120000 Salvage Hauling m<br />
3351130000 Right of Way Access m<br />
3351140000 Grade Access m<br />
3351150000 Grade Common m<br />
3351200000 Ditch Right Of Way m<br />
3351210000 Ditch Common m<br />
3351220000 Trench in Rock m<br />
3351300000 Haul, Weld & Lay Pipe m<br />
3351310000 Haul & String Pipe m<br />
3351320000 Bend Pipe m<br />
3351330000 Weld Pipe m<br />
3351340000 Coat Pipe m<br />
3351350000 Lower In Pipe m<br />
3351400000 Tie In Pipe m<br />
3351500000 Bedding & Backfill m<br />
3351510000 Process Aggregate m3<br />
3351520000 Place Padding m<br />
3351530000 Backfill m<br />
3351600000 Crossings m<br />
3351610000 Road & Rail Crossings m<br />
3351620000 Water Crossings m<br />
3351621000 Minor Water Crossings m<br />
3351622000 Major Water Crossings m<br />
3351722000 HDD Pre-Test & Support m<br />
3351700000 Valves & Stations m<br />
3351710000 Valve Assemblies m<br />
3351720000 Station Piping m<br />
3351800000 Restore Right of Way m<br />
3351900000 Right of Way Maintenance m<br />
3352000000 Distribution Pipeline km<br />
3352100000 Prepare Right of Way ha<br />
3352110000 Clear Right of Way ha<br />
3352120000 Strip Right of Way m2<br />
3352200000 Grade Right Of Way m3<br />
03/01/2009 1:04:57 PM Page No 51 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3352300000 Trench Right Of Way m<br />
3352310000 Trench in Earth m<br />
3352320000 Trench in Rock m<br />
3352400000 Lay Pipe m<br />
3352410000 String Pipe m<br />
3352420000 Bend Pipe ea<br />
3352430000 Coat Pipe m<br />
3352440000 Lower In Pipe m<br />
3352500000 Tie In Pipe ea<br />
3352600000 Backfill Trench m<br />
3352700000 Restore Right Of Way m2<br />
3352800000 Supply Pipe LS<br />
3352900000 Bedding LS<br />
3354000000 Gas Services ea<br />
3353100000 Municipal Gas Service m<br />
3353110000 Excavate Municipal Service m<br />
3353120000 Drill Municipal Service m<br />
3353200000 Residential Gas Service ea<br />
3353210000 Excavate Residential Service ea<br />
3353220000 Drill Residential Service ea<br />
3353300000 Other Gas Services ea<br />
3355000000 Boring & Jacking m<br />
3357100000 Excavate Jacking Pit ea<br />
3357200000 Prepare Jacking Bed LS<br />
3357300000 Bore & Jack m<br />
3356000000 Directional Drilling m<br />
3358100000 Excavate Drill Pit ea<br />
3358200000 Bore & Ream Pilot Hole m<br />
3358210000 Drill & Handle Steel m<br />
3358220000 Mix Bentonite m<br />
3358300000 String & Handle Pipe m<br />
3358400000 Fuse Pipe ea<br />
3358500000 Pull Pipe m<br />
3358600000 Other Directional Drilling m<br />
3360 Site Electrical LS<br />
3370 Distribution LS<br />
3371000000 Site Lighting ea<br />
3371100000 Roadway Lighting Luminaires ea<br />
3371200000 High Mast Luminares ea<br />
3371300000 Loop Detectors LS<br />
3371300000 Underpass Luminaires ea<br />
3371400000 Flashers & Beacons ea<br />
3371500000 Traffic Counting Station ea<br />
3371600000 Roadway Light Brackets ea<br />
3372000000 Utility Poles ea<br />
3372100000 Poles ea<br />
3372110000 Steel Poles ea<br />
3372120000 Wood Poles ea<br />
3372130000 High Mast Poles ea<br />
3372140000 Frangible Pole Bases ea<br />
3372200000 Pole Foundations ea<br />
3372300000 Pole Guy Anchors ea<br />
3372400000 Pole Accessories ea<br />
3372410000 Single Member Arms ea<br />
3372420000 Double Arm Brackets ea<br />
3372430000 Highway Signal Heads ea<br />
3372440000 Other Pole Accessories ea<br />
3373000000 Underground <strong>Structure</strong>s ea<br />
3373100000 Electrical Handholes ea<br />
3373200000 Electrical Chamber Drains ea<br />
3373300000 Electrical Manholes ea<br />
3374000000 Ductbanks m<br />
3374100000 Direct Buried Ducts m<br />
3374200000 Concrete Encased Ducts m<br />
3374300000 Surface Mounted Ducts m<br />
3375000000 Electrical Towers ea<br />
3375100000 Antenna Towers ea<br />
3375200000 Transmission Towers ea<br />
3376000000 Low Voltage Cables m<br />
3376100000 Low Voltage Cables In Ducts m<br />
03/01/2009 1:04:57 PM Page No 52 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3376200000 Low Voltage Cables Aerial m<br />
3377000000 Cathodic Protection LS<br />
3377100000 Anodes ea<br />
3377200000 Ground Electrodes ea<br />
3377300000 Ground Wires m<br />
3377400000 Ground Rods ea<br />
3378000000 Controllers ea<br />
3378100000 Traffic Signal Controllers ea<br />
3378200000 Site Lighting Controllers ea<br />
3380 Transmission km<br />
3381 230 kv Transmission Lines LS<br />
3382 450 kv Transmission Lines km<br />
3382100000 Tower Foundations tower<br />
3382110000 Tangent Tower Foundations ea<br />
3382111000 Tangent Tower Steel Rock Anchor Foundation ea<br />
3382111100 Excavate Foundation m3<br />
3382111200 Concrete Pad m3<br />
3382111300 Supply Install Steel Grid t<br />
3382111400 Supply Drill Rock Anchors m<br />
3382111500 Backfill Foundation m3<br />
3382112000 Tangent Tower Steel Grid Foundations ea<br />
3382112100 Steel Grid Foundations - Strong Soil ea<br />
3382112110 Excavate Foundation m3<br />
3382112120 Supply Install Steel Grid t<br />
3382112130 Backfill Foundation m3<br />
3382112200 Steel Grid Foundations - Week Soil ea<br />
3382112210 Excavate Foundation m3<br />
3382112220 Supply Install Steel Grid t<br />
3382112230 Backfill Foundation m3<br />
3382113000 Tangent Tower Piled Foundations ea<br />
3382113100 Excavate Foundation m3<br />
3382113200 Supply Drive H-Piles m<br />
3382113300 Concrete Foundation m3<br />
10 Supply Place Concrete m3<br />
20 Fabricate Set Strip Formwork m2<br />
10 Fabricate Forms m2<br />
20 Set Strip Forms m2<br />
30 Point Patch Concrete m2<br />
40 Rebar Dowels kg<br />
3382113400 Anchor Bolts ea<br />
3382113500 Backfill Foundation m3<br />
3382120000 Rigid Tower Foundations ea<br />
3382121000 Rigid Tower Steel Rock Anchor Foundation ea<br />
3382121100 Excavate Foundation m3<br />
3382121200 Concrete Pad m3<br />
3382121300 Supply Install Steel Grid t<br />
3382121400 Supply Drill Rock Anchors m<br />
3382121500 Backfill Foundation m3<br />
3382122000 Rigid Tower Steel Grid Foundations ea<br />
3382122100 Steel Grid Foundations - Strong Soil ea<br />
3382122100 Excavate Foundation m3<br />
3382122110 Supply Install Steel Grid t<br />
3382122120 Backfill Foundation m3<br />
3382122200 Steel Grid Foundations - Week Soil ea<br />
3382122210 Excavate Foundation m3<br />
3382122220 Supply Install Steel Grid t<br />
3382122230 Backfill Foundation m3<br />
3382123000 Rigid Tower Piled Foundations ea<br />
3382123100 Supply Drive H-Piles m<br />
3382123200 Concrete Foundation m3<br />
3382123210 Supply Place Concrete m3<br />
3382123220 Fabricate Set Strip Formwork m2<br />
3382123221 Fabricate Forms m2<br />
3382123222 Set Strip Forms m2<br />
3382123230 Point Patch Concrete m2<br />
3382123300 Anchor Bolts ea<br />
3382123400 Rebar Dowels kg<br />
3382200000 Transmission Towers tower<br />
3382210000 Guyed Tangent Tower (43.5 m high) ea<br />
3382211000 Guyed Tangent Tower t<br />
03/01/2009 1:04:57 PM Page No 53 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3382211100 Purchase Transmission Tower Steel t<br />
3382211200 Deliver Transmission Tower Steel t<br />
3382211300 Handle Transmission Tower Steel t<br />
3382211400 Assemble Transmission Tower Steel t<br />
3382211500 Erect Guyed Transmission Tower Steel t<br />
3382220000 Guyed Tangent Tower (0-10 degree) (43.5 m high) ea<br />
3382221000 Guyed Tangent Tower (0-10 degree) t<br />
3382221100 Purchase Transmission Tower Steel t<br />
3382221200 Deliver Transmission Tower Steel t<br />
3382221300 Handle Transmission Tower Steel t<br />
3382221400 Assemble Transmission Tower Steel t<br />
3382221500 Erect Guyed Transmission Tower Steel t<br />
3382230000 Rigid Tower (0-60 degree) (40.7 m high) ea<br />
3382231000 Rigid Tower (0-60 degree) t<br />
3382231100 Purchase Transmission Tower Steel t<br />
3382231200 Deliver Transmission Tower Steel t<br />
3382231300 Handle Transmission Tower Steel t<br />
3382231400 Assemble Transmission Tower Steel t<br />
3382231500 Erect Rigid Transmission Tower Steel t<br />
3382240000 Rigid Tower (60-90 degree) (40.7 m high) ea<br />
3382241000 Rigid Tower (60-90 degree) t<br />
3382241100 Purchase Transmission Tower Steel t<br />
3382241200 Deliver Transmission Tower Steel t<br />
3382241300 Handle Transmission Tower Steel t<br />
3382241400 Assemble Transmission Tower Steel t<br />
3382241500 Erect Rigid Transmission Tower Steel t<br />
3382250000 Anti-Cascade or Dead End Tower ea<br />
3382251000 Anti-Cascade or Dead End Tower t<br />
3382251100 Purchase Transmission Tower Steel t<br />
3382251200 Deliver Transmission Tower Steel t<br />
3382251300 Handle Transmission Tower Steel t<br />
3382251400 Assemble Transmission Tower Steel t<br />
3382251500 Erect Rigid Transmission Tower Steel t<br />
3382300000 Conductors km<br />
3992310000 Purchase Conductors m<br />
3992311000 Purchase Pole Conductors m<br />
3992312000 Purchase Metallic Return Conductors m<br />
3992320000 Deliver Reels load<br />
3992330000 Handle Reels loads<br />
3992340000 String Conductors m<br />
3992350000 Sag & Clamp Conductors m<br />
3992360000 Transmission Line Jumpers ea<br />
3992370000 Anchor Conductors setup<br />
3382400000 Optical Ground Wires km<br />
3382410000 Purchase Optical Ground Wires m<br />
3382420000 Deliver Reels load<br />
3382430000 Handle Reels loads<br />
3382440000 Tension Sag & Clamp OPGW m<br />
3382450000 Connect Optical Groundwire m<br />
3382500000 Counterpoise km<br />
3382510000 Purchase Counterpoise m<br />
3382520000 Deliver Reels load<br />
3382530000 Handle Reels loads<br />
3382540000 Install Counterpoise m<br />
3382600000 Transmission Line Insulators km<br />
3382610000 Purchase Insulators ea<br />
3382620000 Deliver Loads load<br />
3382630000 Handle Loads loads<br />
3382640000 Assemble & Install Insulators tower<br />
3382700000 Transmission Line Hardware tower<br />
3992710000 Purchase Hardware tower<br />
3992720000 Deliver Loads load<br />
3992730000 Handle Loads loads<br />
3992740000 Assemble & Install Hardware tower<br />
3383 750 kv Transmission Lines LS<br />
3400 Railwork LS<br />
3411 Trackwork LS<br />
3411100000 Track Rails m<br />
3411110000 Standard Track Rails m<br />
3411111000 Track Rails m<br />
03/01/2009 1:04:57 PM Page No 54 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3411112000 Light Rail Track m<br />
3411113000 Heavy Rail Track m<br />
3411120000 Welded Track Rails m<br />
3411121000 Welding Rail m<br />
3411161300 In-Track Butt-Welded Track Rail m<br />
3411161600 Pressure-Welded Track Rail m<br />
3411161900 Thermite-Welded Track Rail m<br />
3411122000 Welding Equipment LS<br />
3411130000 Track Rail Joints ea<br />
3411140000 Special Trackwork m<br />
3411141000 Ballasted Special Track Rail m<br />
3411142000 Direct-Fixation Track m<br />
3411143000 Running Rail m<br />
3411144000 Precurved Running Rail m<br />
3411150000 Embedded Track Rail m<br />
3411151000 Grooved Rail m<br />
3411152000 Elastic Layings ea<br />
3411200000 Ballast m3<br />
3411210000 Track Rail Ballast m3<br />
3411220000 Track Rail Subballast m3<br />
3411300000 Cross Ties ea<br />
3411310000 Ties ea<br />
3411311000 Precast Concrete Ties ea<br />
3411312000 Timber Ties ea<br />
3411313000 Resilient Ties ea<br />
3411320000 Fasteners ea<br />
3411321000 Direct-Fixation Fasteners ea<br />
3411400000 Turnouts ea<br />
3411410000 Turnout Heaters ea<br />
3411420000 Turnout Equipment ea<br />
3411400000 Track Accessories ea<br />
3411410000 Track Collector Pans ea<br />
3411420000 Drainage Boxes ea<br />
3411421000 Drainage Boxes (2 Tubes, drainage of groove) ea<br />
3411422000 Drainage Boxes (1 Tube, drainage of groove) ea<br />
3411423000 Drainage Boxes (1 Tube, drainage of groove & surface) ea<br />
3411500000 Switches ea<br />
3411510000 Switch Machines ea<br />
3411520000 Earth Box for Switch Machine ea<br />
3411600000 Stop Blocks ea<br />
3411700000 Dilation Devices ea<br />
3412 Monorail LS<br />
3412100000 Elevated Monorails m<br />
3412200000 On-Grade Monorails m<br />
3412300000 Below-Grade Monorails m<br />
3412400000 Maglev Monorail m<br />
3412500000 Monorail Track m<br />
3414 Cableways LS<br />
3414130000 Aerial Tramways m<br />
3414190000 Gondolas m<br />
3414260000 Funitels m<br />
3414330000 Chairlifts m<br />
3414390000 Surface Lifts m<br />
3414460000 Ropeway Tows m<br />
3414530000 Cable Car Systems m<br />
3420 Traction Power LS<br />
3421000000 Traction Power Distribution m<br />
3421100000 Traction Power Substations ea<br />
3421110000 DC Traction Power Substations ea<br />
3421111000 Transformers ea<br />
3421112000 Rectifiers ea<br />
3421113000 DC Switchgear LS<br />
3421114000 MV Switchgear LS<br />
3421115000 Low Voltage Switchgear LS<br />
3421116000 Substation Cable m<br />
3421117000 Substation Accessories LS<br />
3421120000 AC Traction Power Substations ea<br />
3421200000 Traction Power Switchgear ea<br />
03/01/2009 1:04:57 PM Page No 55 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3421210000 DC Traction Power Switchgear ea<br />
3421220000 AC Traction Power Switchgear ea<br />
3421300000 Frequency Changer ea<br />
3423000000 Overhead Traction Power m<br />
3423100000 Catenary Poles ea<br />
3423200000 Catenary Supports ea<br />
3423300000 Catenary Cable Suspension Spans m<br />
3423400000 Catenary Cables m<br />
3423500000 Catenary Accessories LS<br />
3424000000 Third Rail Traction Power m<br />
3424100000 Bottom-Contact Third Rail m<br />
3424200000 Side-Contact Third Rail m<br />
3424300000 Top-Contact Third Rail m<br />
3442 Signaling & Control LS<br />
3442100000 Signal Cabling m<br />
3442200000 Train Borne Signaling Equipment ea<br />
3442300000 Point Heaters & TS Equipment ea<br />
3442400000 Wayside AVL & Traffic Pre-emption Equipment LS<br />
3442500000 Wayside Passenger Information System LS<br />
3442600000 Interlocking Equipment LS<br />
3442610000 Interlocking Logic Controlers ea<br />
3442620000 Interlocking Railway Control Equipment LS<br />
3442630000 Integrated Control Equipment LS<br />
3442700000 AVLS Equipment LS<br />
3442710000 Central Automated Vehicle locator System (AVLS) LS<br />
3442720000 Onboard AVLS Equipment ea<br />
3442800000 Communication Equipment LS<br />
3442810000 Analog Radio Equipment ea<br />
3442820000 Telephone System ea<br />
3442900000 Operations Control Centre Equipment LS<br />
3442910000 Yard Train Control Room Equipment LS<br />
3442920000 Mainline Control Equipment LS<br />
3442930000 Supervisory Control and Data Acquisition LS<br />
3440 Airfield LS<br />
3443 Airfield Signaling & Controls LS<br />
3443131000 Airfield Runway Identification Lights ea<br />
3443132000 Airfield Runway and Taxiway Inset Lighting ea<br />
3443161000 Microwave Airfield Landing Equipment LS<br />
3443162000 Instrument Airfield Landing Equipment LS<br />
3443163000 Airfield Visual-Approach Slope Indicator LS<br />
3443164000 Airfield Short-Approach Lighting Equipment LS<br />
3443165000 Airfield Omni-Directional-Approach Lighting LS<br />
3443166000 Airfield Low-Intensity -Approach Lighting LS<br />
3443167000 Airfield High-Intensity -Approach Lighting LS<br />
3443168000 Airfield Precision-Approach Path Indicator LS<br />
3443190000 Airfield Control Tower Equipment LS<br />
3443231000 Automatic Weather Observation Equipment LS<br />
3443232000 Airfield Wind Cones LS<br />
3443261000 Airfield Lighting Control Equipment LS<br />
3443262000 Airfield Lighting PLC Control Equipment LS<br />
3443263000 Airfield Lighting Regulator Assembly LS<br />
3473 Airfield Specialties LS<br />
3473130000 Aircraft Tiedowns ea<br />
3473190000 Jet Blast Barriers m2<br />
3473260000 Manufactured Helipads ea<br />
3477 Passenger Loading & Baggage Handling LS<br />
3477131000 Fixed Aircraft Passenger Loading Bridges ea<br />
3477132000 Movable Aircraft Passenger Loading Bridges ea<br />
3477161000 Baggage Conveying Equipment LS<br />
3477161000 Baggage Scanning Equipment LS<br />
3477162000 Baggage Scales LS<br />
3480 Tolling LS<br />
3481 Electronic Tolling Systems LS<br />
3481100000 Underground <strong>Structure</strong>s ea<br />
3481110000 Electrical Handholes ea<br />
3481120000 Electrical Chamber Drains ea<br />
03/01/2009 1:04:57 PM Page No 56 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3481130000 Electrical Manholes ea<br />
3481200000 Ductbanks m<br />
3481210000 Direct Buried Ducts m<br />
3481220000 Concrete Encased Ducts m<br />
3481230000 Surface Mounted Ducts m<br />
3481300000 Communication Cables m<br />
3481310000 Tolling Cables In Ducts m<br />
3481320000 Tolling Cables Aerial m<br />
3481400000 Tolling Gantrys ea<br />
3481410000 Gantry Foundations ea<br />
3481420000 Gantry Overhead <strong>Structure</strong>s ea<br />
3481500000 ETTM Equipment LS<br />
3481510000 Tolling Equipment LS<br />
3481520000 Traffic Management (TMS) LS<br />
3481530000 Operations Management & Control Equipment (OMC) LS<br />
3481540000 Vehicle Detection Stations (VDS) LS<br />
3482 Passenger Fare Collection LS<br />
3482100000 Passenger Ticket Vending Machines ea<br />
3482200000 Passenger Addfare Machines ea<br />
3482300000 Passenger Intermodal Transfer Machines ea<br />
3482400000 Passenger Coin Fare Collection Equipment ea<br />
3482500000 Passenger Electronic Fare Collection Equipment ea<br />
3482600000 Passenger Fare Gates ea<br />
3483 Vehicle Fare Collection LS<br />
3483100000 Vehicle Ticket Vending Machines ea<br />
3483200000 Vehicle Electronic Fare Collection Equipment ea<br />
3483300000 Vehicle Coin Fare Collection Equipment ea<br />
3483400000 Vehicle Fare Gates ea<br />
3483500000 Revenue Management Systems (RMS) LS<br />
3500 Marine LS<br />
3510 Marine Signalling & Controls LS<br />
3512130000 Marine Signaling Equipment LS<br />
3512330000 Marine Navigation Equipment LS<br />
3512530000 Marine Control Equipment LS<br />
3520 Hydraulic Fabrications LS<br />
3520131000 Hydraulic Bifurcation Panels m2<br />
3520132000 Hydraulic Bulkheads m2<br />
3520133000 Hydraulic Manifolds t<br />
3520134000 Hydraulic Penstocks t<br />
3520135000 Hydraulic Trashracks m2<br />
3520160000 Hydraulic Gates m2<br />
3520190000 Hydraulic Valves ea<br />
3530 Marine Dredging LS<br />
3530231000 Integrated Dredging and Dewatering m3<br />
3530231000 Hydraulic Dredging m3<br />
3530231000 Mechanical Dredging m3<br />
3540 Floating Construction LS<br />
3541130000 Floating Piers ea<br />
3541230000 Pontoons ea<br />
3550 Offshore Platforms LS<br />
3552130000 Fixed Offshore Platform Construction LS<br />
3552230000 Semi-Submersible Offshore Platform Construction LS<br />
3552330000 Floating Offshore Platform Construction LS<br />
3560 Marine Specialties LS<br />
3569130000 Marine Fenders m<br />
3569230000 Buoys ea<br />
3569290000 Mooring Devices LS<br />
3569330000 Marine Bollards and Cleats m<br />
3569930000 Marine Chain and Accessories m<br />
3600 Walls m2<br />
3610 Bin & Crib Walls m2<br />
3611100000 Bin & Crib Walls m2<br />
03/01/2009 1:04:57 PM Page No 57 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3611110000 Form Levelling Pad m2<br />
3611120000 Concrete Levelling Pad m3<br />
3611130000 Erect Wall System m2<br />
3611140000 Granular Backfill m3<br />
3611150000 Precast Coping m<br />
3620 Mechanically Stabilized Earth Walls m2<br />
3621100000 Stone Faced Earth Walls m2<br />
3621110000 Form Levelling Pad m2<br />
3621120000 Concrete Levelling Pad m3<br />
3621130000 Erect Wall System m2<br />
3621140000 Granular Backfill m3<br />
3621200000 Precast Panel Earth Walls m2<br />
3621210000 Form Levelling Pad m2<br />
3621220000 Concrete Levelling Pad m3<br />
3621230000 Erect Wall System m2<br />
3621240000 Granular Backfill m3<br />
3621250000 Precast Coping m<br />
3621300000 Mesh Earth Walls m2<br />
3621310000 Erect Wall System m2<br />
3621320000 Granular Backfill m3<br />
3630 Cast in Place Concrete Walls m2<br />
3631100000 Footing Excavation m3<br />
3631110000 Footing Earth Excavation m3<br />
3631111000 Excavate & Dispose m3<br />
3631111000 Excavate m3<br />
3631111100 Haul m3<br />
3631111200 Dump m3<br />
3631112000 Excavate & Stockpile m3<br />
3631112100 Excavate m3<br />
3631112200 Haul m3<br />
3631112300 Spread m3<br />
3631120000 Footing Rock Excavation m3<br />
3631121000 Drill & Blast Structural Rock m3<br />
3631121100 Drill Structural Rock m<br />
3631121200 Load & Shoot Structural Rock m3<br />
3631121300 Handle Blasting Mats m3<br />
3631122000 Excavate Structural Rock m3<br />
3631122100 Load Rock m3<br />
3631122200 Haul Rock m3<br />
3631122300 Spread Rock m3<br />
3631122400 Maintain Haul Road m3<br />
3631122500 Trim Rock m3<br />
3631200000 Wall Backfill m3<br />
3631210000 Wall Native Backfill m3<br />
3631211000 Load Backfill m3<br />
3631212000 Haul Backfill m3<br />
3631213000 Place Backfill m3<br />
3631220000 Wall Granular Backfill m3<br />
3631221000 Supply Granular Backfill t<br />
3631222000 Place Granular Backfill t<br />
3631230000 Unshrinkable Backfill m3<br />
3631231000 Supply Unshrinkable Fill m3<br />
3631232000 Place Unshrinkable Fill m3<br />
3631300000 Foundation Preparation m2<br />
3631310000 Subgrade Preparation m2<br />
3631311000 Prepare Earth Subgrade m2<br />
3631312000 Clean Rock for Concrete m2<br />
3631320000 Supply Place Mudslab Concrete m3<br />
3631400000 Mass Concrete m2<br />
3631410000 Subgrade Preparation m2<br />
3631411000 Prepare Earth Subgrade m2<br />
3631412000 Clean Rock for Concrete m2<br />
3631420000 Form Mass Concrete m2<br />
3631421000 Supply Set Strip Edge Forms m2<br />
3631422000 Supply Set Strip Forms Off Rock m2<br />
3631430000 Mass Concrete m3<br />
3631431000 Supply Place Mudslab m3<br />
3631432000 Supply Place Mass Concrete m3<br />
3631500000 Footing Concrete m3<br />
03/01/2009 1:04:57 PM Page No 58 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3631510000 Subgrade Preparation m2<br />
3631511000 Prepare Earth Subgrade m2<br />
3631512000 Clean Rock for Concrete m2<br />
3631520000 Supply Set Strip Footing Forms m2<br />
3631530000 Supply Place Footing Concrete m3<br />
3631600000 Wall Concrete m3<br />
3631610000 Supply Set Strip Wall Forms m2<br />
3631611000 Fabricate Wall Forms m2<br />
3631612000 Set Strip Wall Forms m2<br />
3631613000 Form Architectural Finish m2<br />
3631620000 Supply Place Wall Concrete m3<br />
3631621000 Supply Wall Concrete m3<br />
3631622000 Place Wall Concrete m3<br />
3631630000 Finish Wall Concrete m2<br />
3631631000 Point & Patch Walls m2<br />
3631632000 Rub Finish Walls m2<br />
3631700000 Reinforcing Steel t<br />
3631710000 Supply & Place Reinforcing Steel t<br />
3631711000 Plain Reinforcing Steel t<br />
3631711100 Fabricate Plain Rebar t<br />
3631711200 Deliver Plain Rebar t<br />
3631711300 Place Plain Rebar t<br />
3631712000 Epoxy Coated Reinforcing Steel t<br />
3631712100 Fabricate Epoxy Coated Rebar t<br />
3631712200 Deliver Epoxy Coated Rebar t<br />
3631712300 Place Epoxy Coated Rebar t<br />
3631713000 Stainless Reinforcing Steel t<br />
3631713100 Fabricate Stainless Rebar t<br />
3631713200 Deliver Stainless Rebar t<br />
3631713300 Place Stainless Rebar t<br />
3631714000 Mechanical Connectors ea<br />
3631715000 Rebar Accessories ea<br />
3631720000 Handle Reinforcing Steel t<br />
3631730000 Rebar Templates Up & Down t<br />
3631800000 Dowels kg<br />
3631810000 Concrete Dowels ea<br />
3631820000 Rock Dowels ea<br />
3631900000 Tieback Anchors m<br />
3631910000 Drill Tieback Anchors m<br />
3631920000 Grout Tieback Anchors m<br />
3700 Bridges LS<br />
3720 Bridge Concrete m3<br />
3721000000 Substructure Concrete m3<br />
3721100000 Mudslab Concrete m2<br />
3721200000 Footing Concrete m3<br />
3721210000 Footing Forms m2<br />
3721211000 Fabricate Footing Forms m2<br />
3721212000 Set Strip Footing Forms m2<br />
3721220000 Supply Place Footing Concrete m3<br />
3721300000 Abutment & Wingwall Concrete m3<br />
3721310000 Abutment & Wingwall Forms m2<br />
3721311000 Fabricate Abutment & Wingwall Forms m2<br />
3721312000 Set Strip Abutment & Wingwall Forms m2<br />
3721313000 Premium Form Shear Keys m2<br />
3721314000 Premium Form Architectural Finish m2<br />
3721320000 Supply Place Abutment Concrete m3<br />
3721330000 Finish Abutment & Wingwall Concrete m2<br />
3721331000 Point & Patch Abutment & Wingwalls m2<br />
3721332000 Rub Finish Abutment & Wingwalls m2<br />
3721400000 Pier Concrete m3<br />
3721410000 Crash Wall Concrete m3<br />
3721411000 Supply Set Strip Crashwall Forms m2<br />
3721411100 Fabricate Crashwall Forms m2<br />
3721411200 Set Strip Crashwall Forms m2<br />
3721412000 Supply Place Crashwall Concrete m3<br />
3721413000 Finish Crashwall Concrete m2<br />
3721413100 Point & Patch Crashwalls m2<br />
3721413200 Rub Finish Crashwalls m2<br />
3721420000 Pier Stem Concrete m3<br />
3721421000 Supply Set Strip Pier Forms m2<br />
03/01/2009 1:04:57 PM Page No 59 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3721421100 Fabricate Pier Stem Forms m2<br />
3721421200 Set Strip Pier Stem Forms m2<br />
3721421300 Form Architectural Finish m2<br />
3721422000 Supply Place Pier Concrete m3<br />
3721423000 Finish Pier Concrete m2<br />
3721423100 Point & Patch Pier Stems m2<br />
3721423200 Rub Finish Pier Stems m2<br />
3721430000 Pier Cap Concrete m3<br />
3721431000 Pier Cap Falsework m2<br />
3721431100 Scaffold Frames Up & Down ea<br />
3721431200 Steel Falsework Up & Down t<br />
3721432000 Supply Set Strip Pier Cap Forms m2<br />
3721432100 Fabricate Pier Cap Forms m2<br />
3721432200 Set Strip Pier Cap Soffit m2<br />
3721432300 Set Strip Pier Cap Sides m2<br />
3721432400 Premium Form Shear Keys m2<br />
3721433000 Supply Place Pier Cap Concrete m3<br />
3721434000 Finish Pier Cap Concrete m2<br />
3721434100 Point & Patch Pier Caps m2<br />
3721434200 Rub Finish Pier Caps m2<br />
3722000000 Falsework m2<br />
3722100000 Scaffold Systems m2<br />
3722110000 Falsework under Wings m2<br />
3722111000 Subgrade Preparation m2<br />
3722112000 Granular Base t<br />
3722113000 Scaffold Frames Up & Down m2<br />
3722120000 Falsework under Deck m2<br />
3722121000 Subgrade Preparation m2<br />
3722122000 Granular Base t<br />
3722123000 Scaffold Frames Up & Down ea<br />
3722200000 Traffic Openings m2<br />
3722210000 Heavy Duty Frames Up & Down ea<br />
3722220000 Steel Beams Up & Down t<br />
3722300000 Highload Systems m2<br />
3722310000 Deliver & Handle High Load Steel t<br />
3722311000 Deliver Highload Steel t<br />
3722312000 Handle Highload Steel t<br />
3722320000 Concrete Sills m3<br />
3722321000 Set Strip Forms for Concrete Sills m2<br />
3722322000 Place Concrete in Sills m3<br />
3722330000 Set Strip High Load Towers t<br />
3722331000 Erect High Load Towers ea<br />
3722332000 Dismantle High Load Towers ea<br />
3722340000 Set Strip Steel Cap Beams t<br />
3722341000 Set Steel Cap Beams t<br />
3722342000 Strip Steel Cap Beams t<br />
3723000000 Deck Concrete m3<br />
3723100000 Slab on Girder Deck m3<br />
3723110000 Deck Formwork m2<br />
3723111000 Soffit Forms m2<br />
3723111100 Supply Set Strip Interior Soffit Forms m2<br />
3723111200 Supply Set Strip Overhang Forms m2<br />
3723112000 Edge Forms m2<br />
3723112100 Supply Set Strip Exterior Edge Forms m2<br />
3723112200 Supply Set Strip Sidewalk Forms m2<br />
3723113000 Diaphram Forms m2<br />
3723113100 Supply Set Strip Abutment Diaphrams m2<br />
3723113200 Supply Set Strip Pier Diaphrams m2<br />
3723114000 Bulkhead Forms m2<br />
3723114100 Form Deck Construction Joints m2<br />
3723114200 Form Expansion Joint Boxouts m2<br />
3723120000 Deck Concrete m3<br />
3723121000 Deck & Diaphram Concrete m3<br />
3723121100 Supply Deck & Diaphram Concrete m3<br />
3723121200 Set Screed Rails m<br />
3723121300 Mobe Demobe Deck Finisher ea<br />
3723121400 Dry Run Deck Finisher ea<br />
3723121500 Place Deck & Diaphram Concrete m3<br />
3723122000 Sidewalk Concrete m3<br />
3723122100 Supply Place Sidewalk Concrete m3<br />
3723122200 Screed Finish Sidewalk Concrete m2<br />
03/01/2009 1:04:57 PM Page No 60 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3723130000 Finish Deck Concrete m2<br />
3723131000 Point Patch Deck Concrete m2<br />
3723132000 Rub Finish Deck Concrete m2<br />
3723200000 Cast in Place Postensioned Deck m3<br />
3723210000 Deck Falsework m2<br />
3723211000 Falsework under Deck m2<br />
3723211100 Subgrade Preparation m2<br />
3723211200 Granular Base t<br />
3723211300 Scaffold Frames Up & Down ea<br />
3723212000 Falsework under Wings m2<br />
3723212100 Subgrade Preparation m2<br />
3723212200 Granular Base t<br />
3723212300 Scaffold Frames Up & Down m2<br />
3723220000 Deck Formwork m2<br />
3723221000 Soffit Forms m2<br />
3723221100 Supply Set Strip Soffit on Falsework m2<br />
3723221200 Supply Set Strip Wing Overhang Forms m2<br />
3723221300 Supply Set Strip Interior Void Soffit m2<br />
3723222000 Side Forms m2<br />
3723222100 Supply Set Strip Exterior Side Forms m2<br />
3723222200 Supply Set Strip Interior Void Walls m2<br />
3723223000 Edge Forms m2<br />
3723223100 Supply Set Strip Exterior Edge Forms m2<br />
3723223200 Supply Set Strip Sidewalk Forms m2<br />
3723224000 Bulkhead Forms m2<br />
3723224100 Form Deck Construction Joints m2<br />
3723224200 Form Expansion Joint Boxouts m2<br />
3723224300 Form Stressing Boxes m2<br />
3723230000 Deck Concrete m3<br />
3723231000 Deck Concrete m3<br />
3723231100 Supply Deck Concrete m3<br />
3723231200 Place 1rst Stage Concrete m3<br />
3723231300 Set Screed Rails m<br />
3723231400 Mobe Demobe Deck Finisher ea<br />
3723231500 Dry Run Deck Finisher ea<br />
3723231600 Place Deck & Web Concrete m3<br />
3723232000 Sidewalk Concrete m3<br />
3524232100 Supply Place Sidewalk Concrete m3<br />
3524232200 Screed Finish Sidewalk Concrete m2<br />
3723240000 Finish Deck Concrete m2<br />
3723241000 Point Patch Deck Concrete m2<br />
3723242000 Rub Finish Deck Concrete m2<br />
3723300000 Cast in Place Rigid Frame Deck m3<br />
3723310000 Deck Falsework m2<br />
3723311000 Falsework under Deck m2<br />
3723311100 Subgrade Preparation m2<br />
3723311200 Granular Base t<br />
3723311300 Scaffold Frames Up & Down m2<br />
3723311400 Sills & Ledgers Up & Down m3<br />
3723312000 Traffic Openings m2<br />
3723312100 Heavy Duty Frames Up & Down ea<br />
3723312200 Steel Beams Up & Down t<br />
3723320000 Deck Formwork m2<br />
3723321000 Soffit Forms on Falsework m2<br />
3723322000 Side Forms m2<br />
3723323000 Sidewalk Forms m2<br />
3723324000 Bulkhead Forms m2<br />
3723330000 Deck Concrete m3<br />
3723331000 Deck Concrete m3<br />
3723331100 Supply Deck Concrete m3<br />
3723331200 Mobe Demobe Deck Finisher ea<br />
3723331300 Dry Run Deck Finisher ea<br />
3723331400 Supply Place Deck Concrete m3<br />
3723331500 Screed Finish Deck Concrete m2<br />
3723332000 Sidewalk Concrete m3<br />
3723332100 Supply Place Sidewalk Concrete LS<br />
3723332200 Screed Finish Sidewalk Concrete m2<br />
3723340000 Finish Deck Concrete m2<br />
3723341000 Point Patch Deck Concrete m2<br />
3723342000 Rub Finish Deck Concrete m2<br />
3723400000 Cast-in-Place Segmental Units m3<br />
03/01/2009 1:04:57 PM Page No 61 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3723500000 Deck Falsework m2<br />
3723510000 Falsework under Deck m2<br />
3723511000 Subgrade Preparation m2<br />
3723512000 Granular Base t<br />
3723513000 Scaffold Frames Up & Down ea<br />
3723520000 Falsework under Wings m2<br />
3723521000 Subgrade Preparation m2<br />
3723522000 Granular Base t<br />
3723523000 Scaffold Frames Up & Down m2<br />
3723530000 Traffic Openings m2<br />
3723531000 Heavy Duty Frames Up & Down ea<br />
3723532000 Steel Beams Up & Down t<br />
3723540000 Highload Systems m2<br />
3723541000 Deliver Steel Falsework t<br />
3723542000 Handle Steel Falsework t<br />
3723543000 Concrete Sills m3<br />
3723543100 Set Strip Forms for Concrete Sills m2<br />
3723543200 Place Concrete in Sills m3<br />
3723544000 Set Strip High Load Towers t<br />
3723544100 Erect High Load Towers ea<br />
3723544200 Dismantle High Load Towers ea<br />
3723545000 Set Strip Steel Cap Beams t<br />
3723546000 Heavy Duty Frames Up & Down ea<br />
3723547000 Steel Beams Up & Down t<br />
3723550000 Scaffold Systems m2<br />
3723551000 Falsework under Wings m2<br />
3723551100 Subgrade Preparation m2<br />
3723551200 Granular Base t<br />
3723551300 Scaffold Frames Up & Down m2<br />
3723552000 Falsework under Deck m2<br />
3723552100 Subgrade Preparation m2<br />
3723552200 Granular Base t<br />
3723552300 Scaffold Frames Up & Down ea<br />
3724000000 Approach Slab Concrete m3<br />
3724100000 Foundation Preparation m2<br />
3724200000 Supply Set Strip Edge Forms m2<br />
3724300000 Supply Place Approach Slab Concrete m3<br />
3725000000 Barrier Wall Concrete m3<br />
3725100000 Supply Set Strip Barrier Wall Forms m2<br />
3725110000 Fabricate Barrier Forms m2<br />
3725120000 Set Strip Barrier Forms m2<br />
3725130000 Set Strip Bulkheads m2<br />
3725200000 Supply Place Barrier Concrete m3<br />
3725300000 Rub Finish Barrier Wall Concrete m2<br />
3726000000 Concrete Slope Paving m3<br />
3726100000 Fine Grade For Slope Paving m2<br />
3726200000 Place Granular Under Slope Paving m3<br />
3726300000 Supply Set Strip Edge Forms m2<br />
3726400000 Supply Place Concrete m3<br />
3726500000 Screed Finish Concrete m2<br />
3727000000 Concrete Accessories m3<br />
3727100000 Waterstop m<br />
3727200000 Joint Fillers m2<br />
3727210000 Cork Filler m2<br />
3727220000 Foam Filler m2<br />
3727300000 Joint Sealers m<br />
3727400000 Backer Rods m<br />
3728000000 Foundation Preparation m2<br />
3728100000 Subgrade Preparation m2<br />
3728110000 Prepare Earth Subgrade m2<br />
3728120000 Clean Rock for Concrete m2<br />
3728200000 Supply Place Mudslab Concrete m3<br />
3730 Reinforcement kg<br />
3731000000 Welded Wire Fabric m2<br />
3732000000 Dowels kg<br />
3732100000 Concrete Dowels ea<br />
3732200000 Rock Dowels ea<br />
3733000000 Reinforcing Steel t<br />
3733100000 Supply & Place Reinforcing Steel t<br />
3733110000 Plain Reinforcing Steel t<br />
03/01/2009 1:04:57 PM Page No 62 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3733111000 Supply Plain Rebar t<br />
3733112000 Place Plain Rebar t<br />
3733120000 Epoxy Coated Reinforcing Steel t<br />
3733121000 Supply Epoxy Coated Rebar t<br />
3733122000 Place Epoxy Coated Rebar t<br />
3733130000 Stainless Reinforcing Steel t<br />
3533131000 Supply Stainless Rebar t<br />
3533132000 Place Stainless Rebar t<br />
3733140000 Mechanical Connectors ea<br />
3733150000 Rebar Accessories ea<br />
3733200000 Handle Reinforcing Steel t<br />
3733300000 Rebar Templates Up & Down t<br />
3740 Precast Concrete m3<br />
3741000000 Precast Beams m<br />
3741100000 Precast I-Girders m<br />
3741110000 Supply Precast m<br />
3741120000 Deliver Precast m<br />
3741130000 Erect Precast ea<br />
3741200000 Precast Bathtub U-Girders m<br />
3741210000 Supply Precast m<br />
3741220000 Deliver Precast m<br />
3741230000 Erect Precast Beams ea<br />
3741300000 Precast Box Girders m<br />
3741310000 Supply Precast m<br />
3741320000 Deliver Precast m<br />
3741330000 Erect Precast ea<br />
3741400000 Bulb Tee Girders m<br />
3741410000 Supply Precast m<br />
3741420000 Deliver Precast m<br />
3741430000 Erect Precast m<br />
3742000000 Precast Deck Slabs m2<br />
3742100000 Supply & Deliver Precast m2<br />
3742200000 Erect Precast Deck Slabs m2<br />
3743000000 Precast Coping m<br />
3743100000 Supply Precast m<br />
3743200000 Deliver Precast m<br />
3743300000 Erect Precast m<br />
3744000000 Precast Foundations ea<br />
3744100000 Supply Precast m<br />
3744200000 Deliver Precast m<br />
3744300000 Erect Precast m<br />
3745000000 Precast Segments ea<br />
3745100000 Supply Precast m<br />
3745200000 Deliver Precast m<br />
3745210000 Handle & Load Precast Units LS<br />
3745220000 Deliver Precast Units LS<br />
3745300000 Erect Precast Segments m<br />
3545310000 Freight Gantry to Site ea<br />
3545320000 Setup Erection Gantry ea<br />
3545330000 Move Gantry to Other Piers ea<br />
3545340000 Temp. Falsework at Abutments ea<br />
3545350000 Erect Precast Segments ea<br />
3545360000 Dismantle Erection Gantry ea<br />
3545370000 Shipped Gantry Backed ea<br />
3746000000 Grout Precast Elements ea<br />
3746100000 Grout Beam Joints m<br />
3746200000 Grout Match Cast Joints m2<br />
3747000000 Fabricate Precast m3<br />
3747100000 Prepare Casting Bed m2<br />
3747110000 Site Preparation m2<br />
3747120000 Casting Slab m3<br />
3747121000 Subgrade Preparation m2<br />
3747122000 Granular Base m3<br />
3747123000 Supply Set Forms m3<br />
3747124000 Supply Place Slab on Grade m3<br />
3747125000 Finish Slab m2<br />
3747130000 Soffit Beams m<br />
3747140000 Tie Down Anchors m<br />
3747150000 Stressing Heads ea<br />
3747200000 Supply Concrete For Precast m3<br />
03/01/2009 1:04:57 PM Page No 63 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3747210000 Move & Setup Concrete Plant m3<br />
3747220000 Supply Concrete Materials m3<br />
3747230000 Batch Concrete m3<br />
3747240000 Sales Taxes m3<br />
3747250000 Deliver Concrete m3<br />
3747260000 Concrete Quality Control m3<br />
3747300000 Handle Precast m<br />
3747310000 Handle & Stockpile ea<br />
3747320000 Load ea<br />
3747400000 Cast Precast Elements ea<br />
3747410000 Fabricate Forms m2<br />
3747420000 Set Strip Forms m2<br />
3747430000 Install Rebar t<br />
3747440000 Supply Install Strands kg<br />
3747450000 Place Concrete m3<br />
3747460000 Cure Concrete m3<br />
3747470000 Finish Concrete m2<br />
3750 Stressing Systems kg<br />
3751000000 Post Tensioned Strands t<br />
3751100000 Supply & Place Strand kg<br />
3751110000 Supply Stand & Accessories kg<br />
3751120000 Place & Grout Strand kg<br />
3751200000 Supply & Place Stressing Duct m<br />
3752000000 Cable Stays t<br />
3752100000 Cable Stay Dampers ea<br />
3752200000 Supply & Place Stays kg<br />
3752210000 Supply Stays & Ducts kg<br />
3752220000 Place & Grout Stays kg<br />
3753000000 Prestressed Strands t<br />
3754000000 Post Tensioned Bars t<br />
3760 Structural Steel t<br />
3761000000 Structural Steel t<br />
3761100000 Fabricate Structural Steel LS<br />
3761200000 Deliver Structural Steel LS<br />
3761300000 Erect Structural Steel LS<br />
3761310000 Erect Teardown Falsework LS<br />
3761320000 Mobe Demobe Crane ea<br />
3761330000 Handle Steel t<br />
3761340000 Erect Steel t<br />
3761400000 Coat New Structural Steel LS<br />
3762000000 Stay in Place Deck Pans m2<br />
3763000000 Handrails m<br />
3764000000 Gratings m2<br />
3764100000 Metal Traffic Gratings m2<br />
3764200000 Metal Plates In Paving m2<br />
3765000000 Access Hatches ea<br />
3766000000 Pier Protection m2<br />
3767000000 Anchor Bolts kg<br />
3767100000 Supply Install Anchor Bolts kg<br />
3767110000 Anchors Bolts for Gates & Trash Racks kg<br />
3767120000 Anchors Bolts Heavy Structural Steel kg<br />
3767130000 Anchor Bolts Light Steel ea<br />
3767200000 Grout Anchor Bolts ea<br />
3770 Expansion Control LS<br />
3771000000 Bearings ea<br />
3771100000 Prepare Bearing Seats ea<br />
3771200000 Supply Install Bearings ea<br />
3771210000 Pot Bearings ea<br />
3771220000 Sliding Bearings ea<br />
3771230000 Sole Plates ea<br />
3771240000 Elastomeric Bearings ea<br />
3771250000 Neoprene Pads ea<br />
3771300000 Grout Bearings ea<br />
3772000000 Expansion Joint Assemblies m<br />
3772100000 Elastomeric Joint Assemblies m<br />
3772200000 Metal Plate Cover Assemblies m<br />
3772300000 Strip Seal Floor Joints m<br />
3772400000 Gasket Assemblies m<br />
03/01/2009 1:04:57 PM Page No 64 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3772500000 Watertest Joints m<br />
3772600000 Modular Expansion Joint Assemblies m<br />
3772700000 Cycle Joints m<br />
3780 Waterproofing & Drainage LS<br />
3781000000 Waterproofing m2<br />
3581100000 Sheet Waterproofing m2<br />
3581110000 Bridge Deck Waterprooking m2<br />
3581120000 Bituminous Sheet Waterproofing m2<br />
3581130000 Elastomeric Sheet Waterproofing m2<br />
3581140000 Thermoplastic Sheet Waterproofing m2<br />
3581150000 Membrane Reinforcement m<br />
3581200000 Bentonite Waterproofing m2<br />
3581210000 Bentonite Panel Waterproofing m2<br />
3581220000 Bentonite Sheet Waterproofing m2<br />
3782000000 Rigid Insulation m2<br />
3783000000 Void Drains ea<br />
3784000000 Tunnel Drain Systems ea<br />
3785000000 Geodrain m2<br />
3786000000 Deck Drains ea<br />
3787000000 Dampproofing m2<br />
3790 Structural Restoration m3<br />
3791000000 Breakout Concrete m3<br />
3791100000 Breakout Concrete Deck m3<br />
3791110000 Full Depth Deck Removal LS<br />
3791120000 Partial Depth Deck Removal LS<br />
3791130000 Chip Out Deck Joints LS<br />
3791140000 Chip Underside Deck LS<br />
3791150000 Scarify Concrete Deck m2<br />
3791200000 Breakout Abutment & Walls m2<br />
3791210000 Chip High Walls & Piers m2<br />
3791220000 Chip Abutments m2<br />
3791300000 Breakout Slab Concrete m3<br />
3791310000 Sawcut Floor Slabs m<br />
3791320000 Breakout Floor Slabs m3<br />
3791330000 Core Drill Floor Slabs ea<br />
3792000000 Clean Rebar m2<br />
3793000000 Concrete Resurfacing m2<br />
3793100000 Concrete Resurfacing m2<br />
3793200000 Concrete Patches m3<br />
3793210000 Concrete Patches - Unformed Surfaces m3<br />
3793220000 Concrete Patches - Formed Surfaces m3<br />
3793300000 Concrete Overlay m3<br />
3793310000 Supply Concrete Overlay m3<br />
3793320000 Place Concrete Overlay m3<br />
3793330000 Supply & Place Concrete Overlay m3<br />
3793340000 Finish & Cure Concrete Overlay m3<br />
3794000000 Concrete Rehabilitation m2<br />
3794100000 Epoxy Injected Crack Repair m<br />
3794200000 Shotcrete Restoration m2<br />
3794300000 Low Pressure Grout m2<br />
3795000000 Metal Cleaning m2<br />
3795100000 Pressure Water Blast Steel m2<br />
3795200000 Sand Blast Steel m2<br />
3795300000 Grind Steel m2<br />
3796000000 Metal Restoration m2<br />
3796100000 Exposed Joist Restoration m2<br />
3796200000 Bridge Girder Restoration m2<br />
3797000000 Concrete Cleaning m2<br />
3800 Tunnels m3<br />
3810 Tunnel Drill & Blast m3<br />
3811000000 Full Face Hardrock Tunnel (4 m dia ) m3<br />
3811100000 Full Face Hardrock Tunnel (approx 4 m dia - 12.5 m3/m) m<br />
3811110000 Drill Blast Full Face Class 1 Support (Rockbolts) m<br />
3811120000 Drill Blast Full Face Class 2 Support (Rockbolts & Shotcrete) m<br />
3811130000 Drill Blast Full Face Class 3a Support (Lattice Girders) m<br />
3812000000 Full Face Hardrock Tunnel (6 m dia ) m3<br />
3812100000 Full Face Hardrock Tunnel (approx 6 m dia - 28 m3/m) m<br />
3811110000 Drill Blast Full Face Class 1 Support (Rockbolts) m<br />
03/01/2009 1:04:57 PM Page No 65 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3811120000 Drill Blast Full Face Class 2 Support (Rockbolts & Shotcrete) m<br />
3811130000 Drill Blast Full Face Class 3a Support (Lattice Girders) m<br />
3813000000 Full Face Hardrock Tunnel (8 m dia ) m3<br />
3813100000 Full Face Hardrock Tunnel (approx 8 m dia - 50 m3/m) m<br />
3812110000 Drill Blast Full Face Class 1 Support (Rockbolts) m<br />
3812120000 Drill Blast Full Face Class 2 Support (Rockbolts & Shotcrete) m<br />
3812130000 Drill Blast Full Face Class 3a Support (Lattice Girders) m<br />
3814000000 Full Face Hardrock Tunnel (12 m dia ) m3<br />
3814100000 Full Face Hardrock Tunnel (approx 12 m dia - 113 m3/m) m<br />
3813110000 Drill Blast Full Face Class 1 Support (Rockbolts) m<br />
3813120000 Drill Blast Full Face Class 2 Support (Rockbolts & Shotcrete) m<br />
3813130000 Drill Blast Full Face Class 3a Support (Lattice Girders) m<br />
3815000000 Heading, Slash & Bench Hardrock Tunnel (18 m dia) m3<br />
3815100000 Heading, Slash & Bench Hardrock Tunnel (approx 18 m dia - 2 m<br />
3814110000 Heading m<br />
3814111000 Drill Blast Heading Class 1 Support (Rockbolts) m<br />
3814112000 Drill Blast Heading Class 2 Support (Rockbolts & Shotcrete) m<br />
3814113000 Drill Blast Heading Class 3a Support (Lattice Girders) m<br />
3814120000 Slash m<br />
3814121000 Drill Blast Slash Class 1 Support (Rockbolts) m<br />
3814122000 Drill Blast Slash Class 2 Support (Rockbolts & Shotcrete) m<br />
3814123000 Drill Blast Heading Class 3a Support (Lattice Girders) m<br />
3814130000 Bench m<br />
3814131000 Drill Blast Bench Class 1 Support (Rockbolts) m<br />
3814132000 Drill Blast Bench Class 2 Support (Rockbolts & Shotcrete) m<br />
3814133000 Drill Blast Bench Class 3a Support (Lattice Girders) m<br />
3814134000 Muck Bench m3<br />
3820 Tunnel Boring m3<br />
3821000000 Bore 5.5 m dia Tunnel m3<br />
3821100000 Purchase Specialized Tunnel Equipment LS<br />
3821110000 Purchase Specialized Tunnel Equipment LS<br />
3821120000 Salvage Specialized Tunnel Equipment LS<br />
3821200000 Mobilize Tunnel Boring Machine ea<br />
3821210000 Install Tunnel Portal Services LS<br />
3821220000 Cast Portal <strong>Work</strong> Slabs m3<br />
3821221000 Supply Place Mudslab m3<br />
3821221100 Foundation Preparation m2<br />
3821221200 Supply Place Drainage Rock m3<br />
3821221300 Place & Cure Concrete m3<br />
3821222000 Supply Place Concrete Propel Slab m3<br />
3821222100 Subgrade Preparation m2<br />
3821222110 Prepare Earth Subgrade for Concrete m2<br />
3821222200 Fabricate Set Strip Formwork m2<br />
3821222210 Supply Set Strip Forms m2<br />
3821222300 Supply Place Concrete m3<br />
3821222310 Supply Concrete m3<br />
3821222320 Place Concrete m3<br />
3821222330 Screed Concrete m2<br />
3821222400 Supply Place Rebar t<br />
3821222410 Handle Rebar t<br />
3821222420 Supply Place Rebar t<br />
3821222500 Concrete Accessories m3<br />
3821222510 Joint Filler m2<br />
3821222520 Joint Sealer m<br />
3821222600 Drill Rock Anchors m<br />
3821230000 Install TBM and Backup ea<br />
3821240000 Supply Install TBM Push Frame ea<br />
3821250000 Install Portal Conveyors ea<br />
3821251000 Foundation Concrete m3<br />
3821251100 Subgrade Preparation m2<br />
3821251110 Prepare Earth Subgrade for Concrete m2<br />
3821251200 Fabricate Set Strip Formwork m2<br />
3821251210 Supply Set Strip Forms m2<br />
3821251300 Supply Place Concrete m3<br />
3821251310 Supply Concrete m3<br />
3821251320 Place Concrete m3<br />
3821251330 Screed Concrete m2<br />
3821251400 Supply Place Rebar t<br />
3821251410 Handle Rebar t<br />
3821251420 Supply Place Rebar t<br />
03/01/2009 1:04:57 PM Page No 66 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3821251500 Concrete Accessories m3<br />
3821251510 Joint Filler m2<br />
3821251520 Joint Sealer m<br />
3821251600 Drill Rock Anchors m<br />
3821252000 Install Conveyors & Belts ea<br />
3821260000 Install Muck Surge Bins ea<br />
3821261000 Excavate Muck Pit m3<br />
3821261100 Excavate m3<br />
3821261200 Haul m3<br />
3821261300 Spread m3<br />
3821262000 Foundation Concrete m3<br />
3821262100 Subgrade Preparation m2<br />
3821262110 Prepare Earth Subgrade for Concrete m2<br />
3821262200 Fabricate Set Strip Formwork m2<br />
3821262210 Supply Set Strip Forms m2<br />
3821262300 Supply Place Concrete m3<br />
3821262310 Supply Concrete m3<br />
3821262320 Place Concrete m3<br />
3821262330 Screed Concrete m2<br />
3821262400 Supply Place Rebar t<br />
3821262410 Handle Rebar t<br />
3821262420 Supply Place Rebar t<br />
3821262500 Concrete Accessories m3<br />
3821262510 Joint Filler m2<br />
3821262520 Joint Sealer m<br />
3821262600 Drill Rock Anchors m<br />
3821270000 Install Soil Conditioning Equipment ea<br />
3821271000 Foundation Concrete m3<br />
3821271100 Subgrade Preparation m2<br />
3821271110 Prepare Earth Subgrade for Concrete m2<br />
3821271200 Fabricate Set Strip Formwork m2<br />
3821271210 Supply Set Strip Forms m2<br />
3821271300 Supply Place Concrete m3<br />
3821271310 Supply Concrete m3<br />
3821271320 Place Concrete m3<br />
3821271330 Screed Concrete m2<br />
3821271400 Supply Place Rebar t<br />
3821271410 Handle Rebar t<br />
3821271420 Supply Place Rebar t<br />
3821271500 Concrete Accessories m3<br />
3821271510 Joint Filler m2<br />
3821271520 Joint Sealer m<br />
3821271600 Drill Rock Anchors m<br />
3821272000 Install Soil Conditioning Equipment ea<br />
3821300000 Move Tunnel Boring Machine ea<br />
3821310000 Remove TBM & Backup ea<br />
3821320000 Reinstall TBM & Backup ea<br />
3821330000 Reinstall TBM Push Frame ea<br />
3821400000 Excavate & Support Tunnel m<br />
3821500000 Excavate Niches & Cross Passages m3<br />
3821510000 Excavate Niches & Cross Passages m3<br />
3821511000 Drill & Blast Structural Rock m3<br />
3821511100 Drill Blast Structural Rock m<br />
3821512000 Muck Niche m3<br />
3821520000 Concrete Cross Passages m3<br />
3821521000 Fabricate Set Strip Formwork m2<br />
3821521100 Fabricate Forms m2<br />
3821521200 Set Strip Forms m2<br />
3821522000 Supply Place Concrete m3<br />
3821522100 Supply Concrete m3<br />
3821522200 Place Concrete m3<br />
3821522300 Cure Concrete m3<br />
3821523000 Finish Concrete m2<br />
3821523100 Point Patch Concrete m2<br />
3821523200 Rub Concrete m2<br />
3821524000 Supply Place Rebar t<br />
3821524100 Handle Rebar t<br />
3821524200 Supply Place Rebar t<br />
3821525000 Concrete Accessories m3<br />
3821525100 Joint Filler m2<br />
3821525200 Joint Sealer m<br />
03/01/2009 1:04:57 PM Page No 67 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3821525300 Waterstop m<br />
3821600000 Rehandle Tunnel Muck m3<br />
3821610000 Load Tunnel Muck m3<br />
3821620000 Haul Tunnel Muck m3<br />
3821630000 Spread Tunnel Muck m3<br />
3821700000 Tunnel Services m<br />
3821800000 Demobilize Tunnel Facilities LS<br />
3822000000 Bore 10.0 m dia Tunnel m3<br />
3822100000 Purchase Specialized Tunnel Equipment LS<br />
3822110000 Purchase Specialized Tunnel Equipment LS<br />
3822120000 Salvage Specialized Tunnel Equipment LS<br />
3822200000 Mobilize Tunnel Boring Machine ea<br />
3822210000 Install Tunnel Portal Services LS<br />
3822220000 Cast Portal <strong>Work</strong> Slabs m3<br />
3822221000 Supply Place Mudslab m3<br />
3822221100 Foundation Preparation m2<br />
3822221200 Supply Place Drainage Rock m3<br />
3822221300 Place & Cure Concrete m3<br />
3822222000 Supply Place Concrete Propel Slab m3<br />
3822222100 Subgrade Preparation m2<br />
3822222110 Prepare Earth Subgrade for Concrete m2<br />
3822222200 Fabricate Set Strip Formwork m2<br />
3822222210 Supply Set Strip Forms m2<br />
3822222300 Supply Place Concrete m3<br />
3822222310 Supply Concrete m3<br />
3822222320 Place Concrete m3<br />
3822222330 Screed Concrete m2<br />
3822222400 Supply Place Rebar t<br />
3822222410 Handle Rebar t<br />
3822222420 Supply Place Rebar t<br />
3822222500 Concrete Accessories m3<br />
3822222510 Joint Filler m2<br />
3822222520 Joint Sealer m<br />
3822222600 Drill Rock Anchors m<br />
3822230000 Install TBM and Backup ea<br />
3822240000 Supply Install TBM Push Frame ea<br />
3822250000 Install Portal Conveyors ea<br />
3822251000 Foundation Concrete m3<br />
3822251100 Subgrade Preparation m2<br />
3822251110 Prepare Earth Subgrade for Concrete m2<br />
3822251200 Fabricate Set Strip Formwork m2<br />
3822251210 Supply Set Strip Forms m2<br />
3822251300 Supply Place Concrete m3<br />
3822251310 Supply Concrete m3<br />
3822251320 Place Concrete m3<br />
3822251330 Screed Concrete m2<br />
3822251400 Supply Place Rebar t<br />
3822251410 Handle Rebar t<br />
3822251420 Supply Place Rebar t<br />
3822251500 Concrete Accessories m3<br />
3822251510 Joint Filler m2<br />
3822251520 Joint Sealer m<br />
3822251600 Drill Rock Anchors m<br />
3822252000 Install Conveyors & Belts ea<br />
3822260000 Install Muck Surge Bins ea<br />
3822261000 Excavate Muck Pit m3<br />
3124112110 Excavate m3<br />
3124112120 Haul m3<br />
3124112130 Spread m3<br />
3822262000 Foundation Concrete m3<br />
3822262100 Subgrade Preparation m2<br />
3822262110 Prepare Earth Subgrade for Concrete m2<br />
3822262200 Fabricate Set Strip Formwork m2<br />
3822262210 Supply Set Strip Forms m2<br />
3822262300 Supply Place Concrete m3<br />
3822262310 Supply Concrete m3<br />
3822262320 Place Concrete m3<br />
3822262330 Screed Concrete m2<br />
3822262400 Supply Place Rebar t<br />
3822262410 Handle Rebar t<br />
3822262420 Supply Place Rebar t<br />
03/01/2009 1:04:57 PM Page No 68 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3822262500 Concrete Accessories m3<br />
3822262510 Joint Filler m2<br />
3822262520 Joint Sealer m<br />
3822262600 Drill Rock Anchors m<br />
3822270000 Install Soil Conditioning Equipment ea<br />
3822271000 Foundation Concrete m3<br />
3822271100 Subgrade Preparation m2<br />
3822271110 Prepare Earth Subgrade for Concrete m2<br />
3822271200 Fabricate Set Strip Formwork m2<br />
3822271210 Supply Set Strip Forms m2<br />
3822271300 Supply Place Concrete m3<br />
3822271310 Supply Concrete m3<br />
3822271320 Place Concrete m3<br />
3822271330 Screed Concrete m2<br />
3822271400 Supply Place Rebar t<br />
3822271410 Handle Rebar t<br />
3822271420 Supply Place Rebar t<br />
3822271500 Concrete Accessories m3<br />
3822271510 Joint Filler m2<br />
3822271520 Joint Sealer m<br />
3822271600 Drill Rock Anchors m<br />
3822272000 Install Soil Conditioning Equipment ea<br />
3822300000 Move Tunnel Boring Machine ea<br />
3822310000 Remove TBM & Backup ea<br />
3822320000 Reinstall TBM & Backup ea<br />
3822330000 Reinstall TBM Push Frame ea<br />
3822400000 Excavate & Support Tunnel m<br />
3822500000 Excavate Niches & Cross Passages m3<br />
3822510000 Excavate Niches & Cross Passages m3<br />
3822511000 Drill & Blast Structural Rock m3<br />
3822511100 Drill Blast Structural Rock m<br />
3822512000 Muck Niche m3<br />
3822520000 Concrete Cross Passages m3<br />
3822521000 Fabricate Set Strip Formwork m2<br />
3822521100 Fabricate Forms m2<br />
3822521200 Set Strip Forms m2<br />
3822522000 Supply Place Concrete m3<br />
3822522100 Supply Concrete m3<br />
3822522200 Place Concrete m3<br />
3822522300 Cure Concrete m3<br />
3822523000 Finish Concrete m2<br />
3822523100 Point Patch Concrete m2<br />
3822523200 Rub Concrete m2<br />
3822524000 Supply Place Rebar t<br />
3822524100 Handle Rebar t<br />
3822524200 Supply Place Rebar t<br />
3822525000 Concrete Accessories m3<br />
3822525100 Joint Filler m2<br />
3822525200 Joint Sealer m<br />
3822525300 Waterstop m<br />
3822600000 Rehandle Tunnel Muck m3<br />
3822610000 Load Tunnel Muck m3<br />
3822620000 Haul Tunnel Muck m3<br />
3822630000 Spread Tunnel Muck m3<br />
3822700000 Tunnel Services m<br />
3822800000 Demobilize Tunnel Facilities LS<br />
3823000000 Bore 3.5 m dia Tunnel m3<br />
3823100000 Purchase Specialized Tunnel Equipment LS<br />
3823110000 Purchase Specialized Tunnel Equipment LS<br />
3823120000 Salvage Specialized Tunnel Equipment LS<br />
3823200000 Mobilize Tunnel Boring Machine ea<br />
3823210000 Install Tunnel Portal Services LS<br />
3823220000 Cast Portal <strong>Work</strong> Slabs m3<br />
3823221000 Supply Place Mudslab m3<br />
3823221100 Foundation Preparation m2<br />
3823221200 Supply Place Drainage Rock m3<br />
3823221300 Place & Cure Concrete m3<br />
3823222000 Supply Place Concrete Propel Slab m3<br />
3823222100 Subgrade Preparation m2<br />
3823222110 Prepare Earth Subgrade for Concrete m2<br />
3823222200 Fabricate Set Strip Formwork m2<br />
03/01/2009 1:04:57 PM Page No 69 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3823222210 Supply Set Strip Forms m2<br />
3823222300 Supply Place Concrete m3<br />
3823222310 Supply Concrete m3<br />
3823222320 Place Concrete m3<br />
3823222330 Screed Concrete m2<br />
3823222400 Supply Place Rebar t<br />
3823222410 Handle Rebar t<br />
3823222420 Supply Place Rebar t<br />
3823222500 Concrete Accessories m3<br />
3823222510 Joint Filler m2<br />
3823222520 Joint Sealer m<br />
3823222600 Drill Rock Anchors m<br />
3823230000 Install TBM and Backup ea<br />
3823240000 Supply Install TBM Push Frame ea<br />
3823250000 Install Portal Conveyors ea<br />
3823251000 Foundation Concrete m3<br />
3823251100 Subgrade Preparation m2<br />
3823251110 Prepare Earth Subgrade for Concrete m2<br />
3823251200 Fabricate Set Strip Formwork m2<br />
3823251210 Supply Set Strip Forms m2<br />
3823251300 Supply Place Concrete m3<br />
3823251310 Supply Concrete m3<br />
3823251320 Place Concrete m3<br />
3823251330 Screed Concrete m2<br />
3823251400 Supply Place Rebar t<br />
3823251410 Handle Rebar t<br />
3823251420 Supply Place Rebar t<br />
3823251500 Concrete Accessories m3<br />
3823251510 Joint Filler m2<br />
3823251520 Joint Sealer m<br />
3823251600 Drill Rock Anchors m<br />
3823252000 Install Conveyors & Belts ea<br />
3823260000 Install Muck Surge Bins ea<br />
3823261000 Excavate Muck Pit m3<br />
3823261100 Excavate m3<br />
3823261200 Haul m3<br />
3823261300 Spread m3<br />
3823262000 Foundation Concrete m3<br />
3823262100 Subgrade Preparation m2<br />
3823262110 Prepare Earth Subgrade for Concrete m2<br />
3823262200 Fabricate Set Strip Formwork m2<br />
3823262210 Supply Set Strip Forms m2<br />
3823262300 Supply Place Concrete m3<br />
3823262310 Supply Concrete m3<br />
3823262320 Place Concrete m3<br />
3823262330 Screed Concrete m2<br />
3823262400 Supply Place Rebar t<br />
3823262410 Handle Rebar t<br />
3823262420 Supply Place Rebar t<br />
3823262500 Concrete Accessories m3<br />
3823262510 Joint Filler m2<br />
3823262520 Joint Sealer m<br />
3823262600 Drill Rock Anchors m<br />
3823270000 Install Soil Conditioning Equipment ea<br />
3823271000 Foundation Concrete m3<br />
3823271100 Subgrade Preparation m2<br />
3823271110 Prepare Earth Subgrade for Concrete m2<br />
3823271200 Fabricate Set Strip Formwork m2<br />
3823271210 Supply Set Strip Forms m2<br />
3823271300 Supply Place Concrete m3<br />
3823271310 Supply Concrete m3<br />
3823271320 Place Concrete m3<br />
3823271330 Screed Concrete m2<br />
3823271400 Supply Place Rebar t<br />
3823271410 Handle Rebar t<br />
3823271420 Supply Place Rebar t<br />
3823271500 Concrete Accessories m3<br />
3823271510 Joint Filler m2<br />
3823271520 Joint Sealer m<br />
3823271600 Drill Rock Anchors m<br />
3823272000 Install Soil Conditioning Equipment ea<br />
03/01/2009 1:04:57 PM Page No 70 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3823300000 Move Tunnel Boring Machine ea<br />
3823310000 Remove TBM & Backup ea<br />
3823320000 Reinstall TBM & Backup ea<br />
3823330000 Reinstall TBM Push Frame ea<br />
3823400000 Excavate & Support Tunnel m<br />
3823500000 Excavate Niches & Cross Passages m3<br />
3823510000 Excavate Niches & Cross Passages m3<br />
3823511000 Drill & Blast Structural Rock m3<br />
3823511100 Drill Blast Structural Rock m<br />
3823512000 Muck Niche m3<br />
3823520000 Concrete Cross Passages m3<br />
3823521000 Fabricate Set Strip Formwork m2<br />
3823521100 Fabricate Forms m2<br />
3823521200 Set Strip Forms m2<br />
3823522000 Supply Place Concrete m3<br />
3823522100 Supply Concrete m3<br />
3823522200 Place Concrete m3<br />
3823522300 Cure Concrete m3<br />
3823523000 Finish Concrete m2<br />
3823523100 Point Patch Concrete m2<br />
3823523200 Rub Concrete m2<br />
3823524000 Supply Place Rebar t<br />
3823524100 Handle Rebar t<br />
3823524200 Supply Place Rebar t<br />
3823525000 Concrete Accessories m3<br />
3823525100 Joint Filler m2<br />
3823525200 Joint Sealer m<br />
3823525300 Waterstop m<br />
3823600000 Rehandle Tunnel Muck m3<br />
3823610000 Load Tunnel Muck m3<br />
3823620000 Haul Tunnel Muck m3<br />
3823630000 Spread Tunnel Muck m3<br />
3823700000 Tunnel Services m<br />
3823800000 Demobilize Tunnel Facilities LS<br />
3824000000 Roadheader Excavation m3<br />
3823271000 Roadheader Operation m3<br />
3823272000 Muck Excavation m3<br />
3823272100 Load Muck m3<br />
3823272200 Haul Muck to Disposal m3<br />
3823272300 Spread Muck at Disposal m3<br />
3830 Tunnel Concrete M3<br />
3831000000 Waterproofing m2<br />
3831100000 Bentonite Waterproofing m2<br />
3832000000 Invert Concrete m3<br />
3832100000 Invert Slab m3<br />
3832110000 Invert Formwork m2<br />
3832111000 Supply Set Strip Invert Forms m2<br />
3832120000 Invert Concrete m3<br />
3832121000 Setup Pumps & Slicklines m3<br />
3832122000 Supply Place Concrete m3<br />
3832130000 Finish Concrete m2<br />
3832200000 Tunnel Walkway m3<br />
3832210000 Sidewalk Formwork m2<br />
3822211000 Supply Set Strip Sidewalk Forms m2<br />
3832220000 Sidewalk Concrete m3<br />
3832230000 Finish Concrete m2<br />
3833000000 Cast-In-Place Concrete Liner m3<br />
3833100000 Finish Concrete m2<br />
3833200000 Tunnel Formwork m2<br />
3833210000 Fabricate Tunnel Forms m2<br />
3833220000 Set Strip Tunnel Forms m2<br />
3833300000 Tunnel Concrete m3<br />
3833310000 Setup Pumps & Slicklines m3<br />
3833320000 Supply Place Tunnel Concrete m3<br />
3834000000 Precast Concrete Liner Segments m3<br />
3835000000 Concrete Accessories m3<br />
3835100000 Waterstop m<br />
3835200000 Joint Fillers m2<br />
3835300000 Joint Sealers m<br />
3835400000 Backer Rods m<br />
03/01/2009 1:04:57 PM Page No 71 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3910 Cofferdams m3<br />
3911000000 Cofferdam Fine Rockfill m3<br />
3911100000 Drill Blast Quarry Rock bank-m3<br />
3911110000 Drill Blast Quarry Rock m<br />
3911120000 Handle Blasting Mats m3<br />
3911200000 Sort Rock m3<br />
3911300000 Load Rock m3<br />
3911400000 Haul Rock m3<br />
3911500000 Spread & Compact Rock m3<br />
3912000000 Cofferdam Rockfill from Quarry-compacted m3<br />
3912100000 Drill Blast Quarry Rock bank-m3<br />
3912110000 Drill Blast Quarry Rock m<br />
3912120000 Handle Blasting Mats m3<br />
3912200000 Load Rock m3<br />
3912300000 Haul Rock m3<br />
3912400000 Spread & Compact Rock m3<br />
3913000000 Cofferdam Rockfill from Quarry-dumped m3<br />
3913100000 Drill Blast Quarry Rock m3<br />
3913110000 Drill Blast Quarry Rock m<br />
3913120000 Handle Blasting Mats m3<br />
3913200000 Load Rock m3<br />
3913300000 Haul Rock m3<br />
3913400000 Spread Rock m3<br />
3914000000 Cofferdam Pitrun Sand & Gravel - Dumped in Water m3<br />
3914100000 Load Trucks at Pit m3<br />
3914200000 Haul Pitrun m3<br />
3914300000 Spread & Compact Fill m3<br />
3915000000 Cofferdam Maintenance m3<br />
3916000000 Cofferdam Dewatering m3<br />
3916100000 Excavate Sumps & Install Pumps ea<br />
3916200000 Setup Pump & Slicklines m<br />
3916300000 Operate Pumps months<br />
3917000000 Cofferdam Removal m3<br />
3917100000 Load Trucks at Cofferdam m3<br />
3917200000 Haul with Off Highway Trucks m3<br />
3917300000 Spread at Dump m3<br />
3920 Spillways m3<br />
3921 Spillway Excavation m3<br />
3920100000 Foundation Preparation m2<br />
3920200000 Common Excavation m3<br />
3920210000 Excavate m3<br />
3920220000 Haul to Waste m3<br />
3920230000 Spread at Waste Dump m3<br />
3920300000 Rock Excavation m3<br />
3920310000 Rock Face m2<br />
3920311000 Drill Blast Preshear m<br />
3920312000 Scaling Rock Face m2<br />
3920320000 Drill & Blast Rock m3<br />
3920321000 Drill Blast Spillway Rock m<br />
3920322000 Handle Blasting Mats m3<br />
3920330000 Load Rock m3<br />
3920340000 Haul Rock m3<br />
3920350000 Spread Rock at Dump m3<br />
3920400000 Grouting lm<br />
3920410000 Drill Grout Holes m<br />
3920420000 Install Grout Packers ea<br />
3920430000 Waterpressure Test ea<br />
3920440000 Mix & Place Grout Bag<br />
3922 Spillway Concrete m3<br />
3920600000 Form & Place Pier Concrete m3<br />
3920610000 Fabricate Set Strip Formwork m2<br />
3920611000 Fabricate Forms m2<br />
3920611100 Fabricate Gang Panels m2<br />
3920612000 Set Strip Forms m2<br />
3920612100 Set Strip Footings m2<br />
3920612100 Build Starter Forms Off Rock m<br />
3920612200 Set Strip Edge Form (Footing) m2<br />
3920612200 Set Strip Piers & Walls m2<br />
03/01/2009 1:04:57 PM Page No 72 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3920612210 Set Strip Forms 1-Sided m2<br />
3920612211 Drill Form Rock Anchors ea<br />
3920612212 Set Strip Forms m2<br />
3920612220 Set Strip Forms 2-Sided m2<br />
3920612300 Set Strip Elevated Slab Soffits m2<br />
3920612310 Falsework Up & Down m2<br />
3920612311 Extra Heavy Duty Frames Up & Down m2<br />
3920612320 Set Strip Soffit m2<br />
3920612330 Set Strip Soffit Edge m2<br />
3920613000 Build Forms in Place m2<br />
3920613100 Supply Set Strip Bulkheads m2<br />
3920613200 Supply Set Strip Box Outs m2<br />
3920620000 Batch & Deliver Concrete m3<br />
3920621000 Batch Plant Operation m3<br />
3920622000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3920623000 Concrete Admixtures m3<br />
3920624000 Supply Water m3<br />
3920625000 Supply Cement & Flyash t<br />
3920626000 Deliver Concrete m3<br />
3920630000 Place Concrete m3<br />
3920631000 Joint Preparation m2<br />
3920631100 Greencut m2<br />
3920632000 Place & Screed Concrete m3<br />
3920632100 Place Invert Slab Concrete m3<br />
3920632110 Place Concrete m3<br />
3920632120 Horizontal Wet Finish m2<br />
3920632200 Place Wall Concrete m3<br />
3920632300 Place Elevated Slab Concrete m3<br />
3920632310 Place Concrete m3<br />
3920632320 Horizontal Wet Finish m2<br />
3920632400 Cure Concrete m3<br />
3920640000 Finish Concrete m2<br />
3960641000 Patch Concrete (Class C) m2<br />
3960641100 Patch Concrete at Grade m2<br />
3960641200 Patch Elevated Concrete m2<br />
3960642000 Point & Patch Concrete (Class B) m2<br />
3960642100 Point & Patch Concrete at Grade m2<br />
3960642200 Point & Patch Elevated Concrete m2<br />
3960643000 Rub Finish (Class A) m2<br />
3960643100 Rub Finish Concrete at Grade m2<br />
3960643200 Rub Finish Elevated Concrete m2<br />
3960643300 Rub Finish Water Passages at Grade m2<br />
3960643400 Rub Finish Water Passages Elevated m2<br />
3920650000 Concrete Accessories m3<br />
3960651000 Waterstop m<br />
3960652000 Joint Filler m2<br />
3960653000 Joint Sealer m<br />
3920700000 Form & Place Concrete Mass Ogee Section m3<br />
3920710000 Fabricate Set Strip Formwork m2<br />
3920713000 Build Forms in Place m2<br />
3920713100 Supply Set Strip Bulkheads m2<br />
3920713200 Supply Set Strip Box Outs m2<br />
3920711000 Batch & Deliver Concrete m3<br />
3920621000 Batch Plant Operation m3<br />
3920622000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
03/01/2009 1:04:57 PM Page No 73 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3920623000 Concrete Admixtures m3<br />
3920624000 Supply Water m3<br />
3920625000 Supply Cement & Flyash t<br />
3920626000 Deliver Concrete m3<br />
3920720000 Place Concrete m3<br />
3920721000 Joint Preparation m2<br />
3920721100 Greencut m2<br />
3920722000 Place & Screed Ogee Concrete m3<br />
3920722300 Place Ogee Lift Concrete m3<br />
3920722400 Place Ogee Slab Concrete m3<br />
3920722410 Place Ogee Slab m3<br />
3920722420 Horizontal Wet Finish m2<br />
3920722600 Cure Concrete m3<br />
3920730000 Finish Concrete m2<br />
3960641000 Patch Concrete (Class C) m2<br />
3960641100 Patch Concrete at Grade m2<br />
3960641200 Patch Elevated Concrete m2<br />
3960642000 Point & Patch Concrete (Class B) m2<br />
3960642100 Point & Patch Concrete at Grade m2<br />
3960642200 Point & Patch Elevated Concrete m2<br />
3960643000 Rub Finish (Class A) m2<br />
3960643100 Rub Finish Concrete at Grade m2<br />
3960643200 Rub Finish Elevated Concrete m2<br />
3960643300 Rub Finish Water Passages at Grade m2<br />
3960643400 Rub Finish Water Passages Elevated m2<br />
3920740000 Concrete Accessories m3<br />
3960651000 Waterstop m<br />
3960652000 Joint Filler m2<br />
3960653000 Joint Sealer m<br />
3920800000 Reinforcing Steel t<br />
3920810000 Supply & Place Reinforcing Steel t<br />
3920820000 Rock Dowels t<br />
3920830000 Offload Reinforcing Steel t<br />
3920840000 Hoist Reinforcing Steel t<br />
3920850000 Erect Rebar Templates t<br />
3923 Spillway Gate Equipment m2<br />
3920910000 Spillway Gates m2<br />
3920911000 Gates m2<br />
3920911100 Radial Spillway Gates m2<br />
3920911200 Vertical Lift Spillway Gates m2<br />
3920912000 Gate Hoists ea<br />
3920912100 Wire Rope Hoists ea<br />
3920912110 Wire Rope Hoists -75 T ea<br />
3920912111 Hoist Support <strong>Structure</strong> ea<br />
3920912112 Wire Rope Hoists ea<br />
3920912120 Wire Rope Hoists -125 T ea<br />
3920912121 Hoist Support <strong>Structure</strong> ea<br />
3920912122 Wire Rope Hoists ea<br />
3920912200 Hydraulic Hoists ea<br />
3920913000 Guides & Embedded Parts m2<br />
3920914000 Access Platforms & Stairs kg<br />
3920920000 Stoplogs m2<br />
3920921000 Stoplogs m2<br />
3920922000 Guides & Embedded Parts m2<br />
3920930000 Trashracks m2<br />
3920931000 Trashracks m2<br />
3920931100 Coarse Trashracks m2<br />
3920931200 Fine Trash Racks m2<br />
03/01/2009 1:04:57 PM Page No 74 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3920932000 Trashrack Guides & Embedded Parts m2<br />
3920933000 Trashrack Cleaning Device ea<br />
3920934000 Trash Rack Grapple ea<br />
3930 Dams & Dykes LS<br />
3931 Dam Excavation m3<br />
3930100000 Foundation Preparation m2<br />
3930110000 Foundation Preparation on Rock m2<br />
3930120000 Foundation Preparation on Soil m2<br />
3930200000 Common Excavation m3<br />
3930210000 Excavate m3<br />
3930220000 Haul to Waste m3<br />
3930230000 Spread at Waste Dump m3<br />
3930300000 Rock Excavation m3<br />
3930310000 Rock Face m2<br />
3930311000 Drill Blast Preshear m<br />
3930312000 Scaling Rock Face m2<br />
3930320000 Drill & Blast Rock m3<br />
3930321000 Drill Blast Spillway Rock m<br />
3930322000 Handle Blasting Mats m3<br />
3930330000 Load Rock m3<br />
3930340000 Haul Rock m3<br />
3930350000 Spread Rock at Dump m3<br />
3930400000 Grouting lm<br />
3930410000 Drill Grout Holes m<br />
3930420000 Install Grout Packers ea<br />
3930430000 Waterpressure Test ea<br />
3930440000 Mix & Place Grout Bag<br />
3932 Containment Barriers m2<br />
3930500000 Slurry Trench m3<br />
3930510000 Mobe Slurry Equipment m3<br />
3930520000 Excavate Mixing Ponds ea<br />
3930530000 Supply Cement, Bentonite & Aggregate m3<br />
3930540000 Premix Bentonite Water Slurry m3<br />
3930550000 Batch Plastic Concrete Mix m3<br />
7500130 Rent 90 m3 Batch Plant and JD 644 Loader month<br />
7500140 Rent Ready Mix Trucks months<br />
7500160 Heat Concrete m3<br />
7500180 Batch Concrete m3<br />
7500190 Deliver Concrete to Pours m3<br />
3930560000 Excavate Slurry Trench m3<br />
3930570000 Cleanup & Demobilization m3<br />
3930600000 Grouting lm<br />
3920410000 Drill Grout Holes m<br />
3920420000 Install Grout Packers ea<br />
3920430000 Waterpressure Test ea<br />
3920440000 Mix & Place Grout Bag<br />
3933 Dam Embankment m3<br />
3930700000 Earthfill Embankment m3<br />
3930710000 Impervious Fill m3<br />
3930711000 Load Trucks at Pit m3<br />
3930712000 Haul m3<br />
3930713000 Spread & Compact Fill m3<br />
3930714000 Recondition Impervious Fill cm<br />
3930720000 Processed Sand - Compacted m3<br />
3930721000 Load Trucks at Pit m3<br />
3930722000 Haul m3<br />
3930723000 Spread & Compact Fill m3<br />
3930724000 Process Sand mt<br />
3930725000 Recondition Granular Fill cm<br />
3930730000 Processed Sand & Gravel - Compacted m3<br />
3930731000 Load Trucks at Pit m3<br />
3930732000 Haul m3<br />
3930733000 Spread & Compact Fill m3<br />
3930734000 Process Sand mt<br />
3930735000 Recondition Granular Fill cm<br />
3930740000 Rockfill m3<br />
3930741000 Drill Blast Quarry Rock m3<br />
3930751100 Drill Blast Quarry Rock m<br />
03/01/2009 1:04:57 PM Page No 75 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3930751200 Handle Blasting Mats m3<br />
3930742000 Load Rock m3<br />
3930743000 Haul Rock (1500m) m3<br />
3930744000 Spread & Compact Rock m3<br />
3930750000 Riprap Machine Placed m3<br />
3930751000 Drill Blast Quarry Rock m3<br />
3930751100 Drill Blast Quarry Rock m<br />
3930751200 Handle Blasting Mats m3<br />
3930752000 Load Rock m3<br />
3930753000 Haul Rock m3<br />
3930755000 Spread & Compact Rock m3<br />
3930756000 Sort Riprap at Pit m3<br />
3930760000 Instrumentation m3<br />
3930770000 Roadway m2<br />
3930771000 Granular Base 200mm t<br />
3930771100 Load Trucks at Pit m3<br />
3930771200 Haul m3<br />
3930771300 Spread & Compact Fill t<br />
3930771400 Process Sand & Gravel mt<br />
3930772000 Granular Sub-Base 500mm t<br />
3930772100 Load Trucks at Pit m3<br />
3930772200 Haul m3<br />
3930772300 Spread & Compact Fill t<br />
3930772400 Process Sand & Gravel mt<br />
3930780000 Guiderail m<br />
3930800000 Concrete Faced Rockfill Dam (CFRD) m3<br />
3930810000 Impervious Fill m3<br />
3930811000 Load Trucks at Pit m3<br />
3930812000 Haul m3<br />
3930813000 Spread & Compact Fill m3<br />
3930814000 Recondition Impervious Fill cm<br />
3930820000 Processed Sand - Compacted m3<br />
3930821000 Load Trucks at Pit m3<br />
3930822000 Haul m3<br />
3930823000 Spread & Compact Fill m3<br />
3930824000 Process Sand mt<br />
3930825000 Recondition Granular Fill cm<br />
3930830000 Processed Sand & Gravel - Compacted m3<br />
3930831000 Load Trucks at Pit m3<br />
3930832000 Haul m3<br />
3930833000 Spread & Compact Fill m3<br />
3930834000 Process Sand mt<br />
3930835000 Recondition Granular Fill cm<br />
3930840000 Fine Rockfill from Quarry - Compacted m3<br />
3930841000 Drill Blast Quarry Rock m3<br />
3930751100 Drill Blast Quarry Rock m<br />
3930751200 Handle Blasting Mats m3<br />
3930842000 Load Rock m3<br />
3930843000 Haul Rock (1500m) m3<br />
3930844000 Spread & Compact Rock m3<br />
3930845000 Sort Rock m3<br />
3930850000 Rockfill from Quarry m3<br />
3930851000 Drill Blast Quarry Rock m3<br />
3930751100 Drill Blast Quarry Rock m<br />
3930751200 Handle Blasting Mats m3<br />
3930852000 Load Rock m3<br />
3930853000 Haul Rock (1500m) m3<br />
3930854000 Spread Rock m3<br />
3930860000 Rockfill from Quarry - Compacted m3<br />
3930861000 Drill Blast Quarry Rock m3<br />
3930751100 Drill Blast Quarry Rock m<br />
3930751200 Handle Blasting Mats m3<br />
3930862000 Load Rock m3<br />
3930863000 Haul Rock (1500m) m3<br />
3930864000 Spread & Compact Rock m3<br />
3930870000 Riprap from Quarry - Machine Placed m3<br />
3930871000 Drill Blast Quarry Rock m3<br />
3930871100 Drill Blast Quarry Rock m<br />
3930871200 Handle Blasting Mats m3<br />
3930872000 Load Rock m3<br />
3930873000 Haul Rock m3<br />
03/01/2009 1:04:57 PM Page No 76 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3930874000 Spread & Compact Rock m3<br />
3930875000 Sort Riprap at Pit m3<br />
3930880000 Fine Rockfill from Quarry - Compacted on Face m3<br />
3930881000 Drill Blast Quarry Rock m3<br />
3930891100 Drill Blast Quarry Rock m<br />
3930891200 Handle Blasting Mats m3<br />
3930882000 Load Rock m3<br />
3930883000 Haul Rock m3<br />
3930884000 Spread & Compact Rock m3<br />
3930885000 Sort Rock m3<br />
3930886000 Compact on Face m3<br />
3930890000 Instrumentation ls<br />
3930900000 Concrete - Including Forming of Joints m3<br />
3930910000 Batch & Deliver Concrete m3<br />
3930911000 Batch Plant Operation m3<br />
3930912000 Concrete Aggregate tonne<br />
3930912100 Primary Crushing tonne<br />
3930912200 Secondary Crushing tonne<br />
3930912300 Wash Aggregate tonne<br />
3930912400 Supply Shotrock tonne<br />
3930912410 Drill Blast Quarry Rock m3<br />
3930912411 Drill Blast Quarry Rock m<br />
3930912412 Handle Blasting Mats m3<br />
3930912420 Load Rock m3<br />
3930912430 Haul Rock (500m) m3<br />
3930912440 Over-haul Rock m3-km<br />
3930912450 Spread at Stockpile m3<br />
3930912500 Supply Pitrun tonne<br />
3930912510 Load Trucks at Pit m3<br />
3930912520 Haul m3<br />
3930912530 Spread at Stockpile m3<br />
3930913000 Concrete Admixtures m3<br />
3930914000 Supply Water m3<br />
3930915000 Supply Cement & Flyash t<br />
3930916000 Deliver Concrete m3<br />
3930920000 Bitumen Layer of Face of Dam m2<br />
3930930000 Form Construction Joints m2<br />
3930940000 Waterstop m<br />
3930950000 Place & Screed Concrete m3<br />
3930960000 Cure Concrete m3<br />
3930910000 Reinforcing Steel kg<br />
3930911000 Drill & Place Rock Dowels at Toe ea<br />
3930912000 Supply Place Rebar t<br />
3930913000 Handle Rebar t<br />
3930900000 Roller Compacted Concrete Embankment m3<br />
3930910000 RCC Concrete m3<br />
3930911000 Batch RCC m3<br />
3930911100 Batch Plant Operation m3<br />
3930911200 Cement ton<br />
3930911210 Supply Cement tonne<br />
3930911220 Offload Cement tonne<br />
3930911300 Flyash ton<br />
3930911310 Supply Flyash tonne<br />
3930911320 Offload Flyash tonne<br />
3930911400 Concrete Aggregate tonne<br />
3930911410 Primary Crushing tonne<br />
3930911420 Secondary Crushing tonne<br />
3930911430 Wash Aggregate tonne<br />
3930911440 Haul 25km to Site m3<br />
3930911500 Concrete Admixtures m3<br />
3930911600 Supply Water m3<br />
3930912000 Place Bedding Mortar m2<br />
3930913000 Place Mass RCC m3<br />
3930913100 Convey RCC to Dam m3<br />
3930913200 Dump RCC at Dam m3<br />
3930913300 Spead & Compact RCC m3<br />
3930914000 Place Contraction Joints m3<br />
3930920000 Form Drainage Gallery m2<br />
3930921000 Fabricate Forms m2<br />
3930922000 Set Strip Forms m2<br />
3930923000 Finish Concrete m2<br />
03/01/2009 1:04:57 PM Page No 77 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3930930000 Instrumentation ls<br />
3930940000 Concrete Face Upstream & Downstream m3<br />
3930941000 Upstream Face m3<br />
3930941100 Batch & Deliver Concrete m3<br />
3930941110 Batch Plant Operation m3<br />
3930941120 Concrete Aggregate tonne<br />
3930941121 Primary Crushing tonne<br />
3930941122 Secondary Crushing tonne<br />
3930941123 Wash Aggregate tonne<br />
3930941124 Supply Shotrock tonne<br />
3930941125 Supply Pitrun tonne<br />
3930941130 Concrete Admixtures m3<br />
3930941140 Supply Water m3<br />
3930941150 Supply Cement & Flyash t<br />
3930941160 Deliver Concrete m3<br />
3930941200 Greencut Concrete m2<br />
3930941300 Straight Slip Forms for RCC m2<br />
3930941310 Fabricate Forms m2<br />
3930941320 Set Strip Straight Forms m2<br />
3930941400 Formwork Off Rock (premium only) m2<br />
3930941500 Supply Place Cooling Pipe m<br />
3930941600 Place Upstream Face Concrete m3<br />
3930941700 Cure Concrete m3<br />
3930941800 Finish Concrete Face RCC m2<br />
3930942000 Downstream Face m3<br />
3930942100 Batch & Deliver Concrete m3<br />
3930942110 Batch Plant Operation m3<br />
3930942120 Concrete Aggregate tonne<br />
3930942121 Primary Crushing tonne<br />
3930942122 Secondary Crushing tonne<br />
3930942123 Wash Aggregate tonne<br />
3930942124 Supply Shotrock tonne<br />
3930942125 Supply Pitrun tonne<br />
3930942130 Concrete Admixtures m3<br />
3930942140 Supply Water m3<br />
3930942150 Supply Cement & Flyash t<br />
3930942160 Deliver Concrete m3<br />
3930942200 Slipform Downstream Face m3<br />
3930942300 Cure Concrete m3<br />
3934 Dam Concrete m3<br />
3931000000 Batch & Deliver Concrete m3<br />
3931100000 Batch Plant Operation m3<br />
3931200000 Concrete Aggregate tonne<br />
3931210000 Primary Crushing tonne<br />
3931211000 Secondary Crushing tonne<br />
3931212000 Wash Aggregate tonne<br />
3931213000 Supply Shotrock tonne<br />
3931213100 Drill Blast Quarry Rock m3<br />
3931213110 Drill Blast Quarry Rock m<br />
3931213120 Handle Blasting Mats m3<br />
3931213200 Load Rock m3<br />
3931213300 Haul Rock (500m) m3<br />
3931213400 Over-haul Rock m3-km<br />
3931213500 Spread at Stockpile m3<br />
3931214000 Supply Pitrun tonne<br />
3931214100 Load Trucks at Pit m3<br />
3931214200 Haul m3<br />
3931214300 Spread & Compact Fill m3<br />
3931300000 Concrete Admixtures m3<br />
3931400000 Supply Water m3<br />
3931500000 Supply Cement & Flyash t<br />
3931600000 Deliver Concrete m3<br />
3931100000 Form & Place Mass Concrete m3<br />
3931110000 Fabricate Set Strip Formwork m2<br />
3931111000 Fabricate Forms m2<br />
3931111100 Fabricate Gang Panels m2<br />
3931112000 Set Strip Cantilever Forms m2<br />
3931113000 Build Forms in Place m2<br />
3920713100 Supply Set Strip Bulkheads m2<br />
3920713200 Supply Set Strip Box Outs m2<br />
03/01/2009 1:04:57 PM Page No 78 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3930920000 Form Drainage Gallery m2<br />
3930921000 Fabricate Forms m2<br />
3930922000 Set Strip Forms m2<br />
3930923000 Finish Concrete m2<br />
3931120000 Place Concrete m3<br />
3931121000 Joint Preparation m2<br />
3931121100 Greencut m2<br />
3931122000 Convey Concrete to Pours m3<br />
3931123000 Place & Screed Concrete m3<br />
3931130000 Finish Concrete m2<br />
3931131000 Point & Patch Concrete (Class B) m2<br />
3931140000 Concrete Accessories m3<br />
3931141000 Waterstop m<br />
3931142000 Joint Filler m2<br />
3931143000 Joint Sealer m<br />
3931150000 Supply Place Cooling Pipe m<br />
3940 Intakes m3<br />
3941 Intake Excavation m3<br />
3940100000 Foundation Preparation m2<br />
3940200000 Common Excavation m3<br />
3940210000 Excavate m3<br />
3940220000 Haul to Waste m3<br />
3940230000 Spread at Waste Dump m3<br />
3940300000 Rock Excavation m3<br />
3940310000 Rock Face m2<br />
3920311000 Drill Blast Preshear m<br />
3920312000 Scaling Rock Face m2<br />
3940320000 Drill & Blast Rock m3<br />
3920321000 Drill Blast Spillway Rock m<br />
3920322000 Handle Blasting Mats m3<br />
3940330000 Load Rock m3<br />
3940340000 Haul Rock m3<br />
3940350000 Spread Rock at Dump m3<br />
3940400000 Grouting lm<br />
3940410000 Drill Grout Holes m<br />
3940420000 Install Grout Packers ea<br />
3940430000 Waterpressure Test ea<br />
3940440000 Mix & Place Grout Bag<br />
3942 Intake Concrete m3<br />
3940600000 Intake Concrete m3<br />
3960610000 Fabricate Set Strip Formwork m2<br />
3960611000 Fabricate Forms m2<br />
3960611100 Fabricate Gang Panels m2<br />
3960611200 Fabricate Transition Panels m2<br />
3960612000 Set Strip Forms m2<br />
3960612100 Set Strip Curved Forms m2<br />
3960612200 Set Strip Walls m2<br />
3960612210 Set Strip Forms 1-Sided m2<br />
3960612211 Drill Form Rock Anchors ea<br />
3960612212 Set Strip Forms m2<br />
3960612220 Set Strip Forms 2-Sided m2<br />
3960612300 Set Strip Elevated Slab Soffits m2<br />
3960612310 Falsework Up & Down m2<br />
3960612311 Extra Heavy Duty Frames Up & Down m2<br />
3960612320 Set Strip Soffit m2<br />
3960612330 Set Strip Soffit Edge m2<br />
3960613000 Build Forms in Place m2<br />
3960613100 Supply Set Strip Bulkheads m2<br />
3960613200 Supply Set Strip Box Outs m2<br />
3960620000 Batch & Deliver Concrete including Overbreak m3<br />
3960621000 Batch Plant Operation m3<br />
3960622000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
03/01/2009 1:04:57 PM Page No 79 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3960623000 Concrete Admixtures m3<br />
3960624000 Supply Water m3<br />
3960625000 Supply Cement & Flyash t<br />
3960626000 Deliver Concrete m3<br />
3960630000 Place Concrete including Overbreak m3<br />
3960631000 Joint Preparation m2<br />
3960631100 Greencut m2<br />
3960632000 Place & Screed Concrete- Neatline m3<br />
3960632100 Place Invert Slab Concrete m3<br />
3960632110 Place Concrete m3<br />
3960632120 Horizontal Wet Finish m2<br />
3960632200 Place Wall Concrete m3<br />
3960632300 Place Elevated Slab Concrete m3<br />
3960632310 Place Concrete m3<br />
3960632320 Horizontal Wet Finish m2<br />
3960632400 Cure Concrete m3<br />
3960633000 Place Overbreak Concrete m3<br />
3960640000 Finish Concrete m2<br />
3960641000 Patch Concrete (Class C) m2<br />
3960641100 Patch Concrete at Grade m2<br />
3960641200 Patch Elevated Concrete m2<br />
3960642000 Point & Patch Concrete (Class B) m2<br />
3960642100 Point & Patch Concrete at Grade m2<br />
3960642200 Point & Patch Elevated Concrete m2<br />
3960643000 Rub Finish (Class A) m2<br />
3960643100 Rub Finish Concrete at Grade m2<br />
3960643200 Rub Finish Elevated Concrete m2<br />
3960643300 Rub Finish Water Passages at Grade m2<br />
3960643400 Rub Finish Water Passages Elevated m2<br />
3960650000 Concrete Accessories m3<br />
3960651000 Waterstop m<br />
3960652000 Joint Filler m2<br />
3960653000 Joint Sealer m<br />
3940700000 Reinforcing Steel t<br />
3940710000 Supply & Place Reinforcing Steel t<br />
3940720000 Rock Dowels t<br />
3940730000 Offload Reinforcing Steel t<br />
3940740000 Hoist Reinforcing Steel t<br />
3940750000 Erect Rebar Templates t<br />
3943 Intake Gate Equipment m2<br />
3940910000 Intake Gates m2<br />
3940911000 Gates m2<br />
3940911100 Intake Vertical Lift Gates m2<br />
3940911200 Intake Wheel Gates m2<br />
3940912000 Gate Hoists ea<br />
3940912100 Wire Rope Hoists ea<br />
3920912110 Wire Rope Hoists -75 T ea<br />
3920912111 Hoist Support <strong>Structure</strong> ea<br />
3920912112 Wire Rope Hoists ea<br />
3920912120 Wire Rope Hoists -125 T ea<br />
3920912121 Hoist Support <strong>Structure</strong> ea<br />
3920912122 Wire Rope Hoists ea<br />
3940912200 Hydraulic Hoists ea<br />
3940913000 Guides & Embedded Parts m2<br />
3940914000 Access Platforms & Stairs kg<br />
3940920000 Stoplogs m2<br />
3940921000 Stoplogs m2<br />
3940922000 Guides & Embedded Parts m2<br />
3940930000 Trashracks m2<br />
3940931000 Trashracks m2<br />
3940931100 Coarse Trashracks m2<br />
3940931200 Fine Trash Racks m2<br />
3940932000 Trashrack Guides & Embedded Parts m2<br />
03/01/2009 1:04:57 PM Page No 80 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3940933000 Trashrack Cleaning Device ea<br />
3940934000 Trash Rack Grapple ea<br />
3950 Penstocks LS<br />
3950910000 Grade Penstocks t<br />
3950911000 Supply Penstock t<br />
3950912000 Offload Penstock t<br />
3950913000 Build Crane Pads ea<br />
3950914000 Construct Concrete Cradles ea<br />
010 Excavate ea<br />
020 Form m2<br />
030 Concrete m3<br />
3950915000 Set & Align Penstock t<br />
3950916000 Weld Joints joint<br />
3950917000 Test Joints ea<br />
3950918000 Paint Joints m2<br />
3950919000 Remove Spiders ea<br />
3950920000 Install Flex Couplings ea<br />
3950921000 Install Cathodic Protection ea<br />
3950922000 Hydraulic Pressure Test ea<br />
3950923000 Oiler for 150 t Crane hour<br />
3950920000 Inclined Penstocks t<br />
3950921000 Supply Penstock t<br />
3950922000 Offload Penstock t<br />
3950923000 Build Crane Pads ea<br />
3950924000 Construct Platforms t<br />
3950925000 Set & Align Penstock t<br />
3950926000 Weld Joints t<br />
3950927000 Test Joints t<br />
3950928000 Coat Penstock t<br />
3950929000 Remove Spiders ea<br />
3950930000 Install Flex Couplings ea<br />
3950931000 Install Cathodic Protection ea<br />
3950932000 Hydraulic Pressure Test ea<br />
3950930000 Underground Penstocks t<br />
3950931000 Fabrication tonne<br />
3950932000 Flanges LS<br />
3950933000 Internal Supports LS<br />
3950934000 Special Trailer LS<br />
3950935000 Transport to Site tonne<br />
3950936000 Erection on Site tonn<br />
3950937000 Equipment LS<br />
3950938000 QC & NDT LS<br />
3950939000 Painting LS<br />
3950940000 Onsite Supervision LS<br />
3950941000 Miscellaneous Indirect Costs LS<br />
3960 Powerhouses m3<br />
3961 Powerhouse Excavation m3<br />
3960100000 Foundation Preparation m2<br />
3960200000 Common Excavation m3<br />
3960210000 Excavate m3<br />
3960220000 Haul to Waste m3<br />
3960230000 Spread & Compact at Waste Dump m3<br />
3960300000 Rock Excavation m3<br />
3960310000 Rock Face m2<br />
3960311000 Drill Blast Preshear m<br />
3960312000 Scaling Rock Face m2<br />
3960320000 Drill & Blast Rock m3<br />
3960321000 Drill Blast Bulk Rock m3<br />
3960321000 Drill Blast Rock m<br />
3960322000 Handle Blasting Mats m3<br />
3960322000 Drill Blast Structural Rock m3<br />
3960321000 Drill Blast Rock m<br />
3960322000 Handle Blasting Mats m3<br />
3960330000 Load Rock m3<br />
3960340000 Haul Rock m3<br />
3960350000 Spread Rock at Dump m3<br />
3960400000 Grouting lm<br />
3960410000 Drill Grout Holes m<br />
3960420000 Install Grout Packers ea<br />
03/01/2009 1:04:57 PM Page No 81 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3960430000 Waterpressure Test ea<br />
3960440000 Mix & Place Grout Bag<br />
3962 Powerhouse Concrete m3<br />
3960500000 Powerhouse Concrete below Turbine Floor m3<br />
3960510000 Fabricate Set Strip Formwork m2<br />
3960511000 Fabricate Forms m2<br />
3960511100 Fabricate Gang Panels m2<br />
3960511200 Fabricate Draft Tube Forms m2<br />
3960512000 Set Strip Forms m2<br />
3960512100 Set Strip Invert m2<br />
3960512110 Build Starter Forms Off Rock m<br />
3960512120 Set Strip Edge Form invert m2<br />
3960512200 Set Strip Walls m2<br />
3960512210 Set Strip Forms 1-Sided m2<br />
3920612211 Drill Form Rock Anchors ea<br />
3920612212 Set Strip Forms m2<br />
3960512220 Set Strip Forms 2-Sided m2<br />
3960512300 Set Strip Transition Forms m2<br />
3960512400 Set Strip Elevated Slab Soffits m2<br />
3960512410 Falsework Up & Down m2<br />
3960512411 Extra Heavy Duty Frames Up & Down m2<br />
3960512420 Set Strip Soffit m2<br />
3960512430 Set Strip Soffit Edge m2<br />
3960513000 Build Forms in Place m2<br />
3960513100 Supply Set Strip Bulkheads m2<br />
3960513200 Supply Set Strip Box Outs m2<br />
3960520000 Batch & Deliver Concrete including Overbreak m3<br />
3960521000 Batch Plant Operation m3<br />
3960522000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3960523000 Concrete Admixtures m3<br />
3960524000 Supply Water m3<br />
3960525000 Supply Cement & Flyash t<br />
3960526000 Deliver Concrete m3<br />
3960530000 Place Concrete including Overbreak m3<br />
3960531000 Joint Preparation m2<br />
3960531100 Greencut m2<br />
3960532000 Place & Screed Concrete - Neatline m3<br />
3960532100 Place Invert Slab Concrete m3<br />
3960632210 Place Concrete m3<br />
3960632220 Horizontal Wet Finish m2<br />
3960532200 Place Wall Concrete m3<br />
3960532300 Place Elevated Slab Concrete m3<br />
3960632410 Place Concrete m3<br />
3960632420 Horizontal Wet Finish m2<br />
3960532400 Cure Concrete m3<br />
3960533000 Place Overbreak Concrete m3<br />
3960540000 Finish Concrete m2<br />
3960541000 Patch Concrete (Class C) m2<br />
3960541100 Patch Concrete at Grade m2<br />
3960541200 Patch Elevated Concrete m2<br />
3960542000 Point & Patch Concrete (Class B) m2<br />
3960542100 Point & Patch Concrete at Grade m2<br />
3960542200 Point & Patch Elevated Concrete m2<br />
3960543000 Rub Finish (Class A) m2<br />
3960543100 Rub Finish Concrete at Grade m2<br />
3960543200 Rub Finish Elevated Concrete m2<br />
03/01/2009 1:04:57 PM Page No 82 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3960543300 Rub Finish Water Passages at Grade m2<br />
3960543400 Rub Finish Water Passages Elevated m2<br />
3960550000 Concrete Accessories m3<br />
3960551000 Waterstop m<br />
3960552000 Joint Filler m2<br />
3960553000 Joint Sealer m<br />
3960600000 Powerhouse Concrete above Turbine Floor m3<br />
3960610000 Fabricate Set Strip Formwork m2<br />
3960611000 Fabricate Forms m2<br />
3960611100 Fabricate Gang Panels m2<br />
3960612000 Set Strip Forms m2<br />
3960612100 Set Strip Curved Forms m2<br />
3960612200 Set Strip Walls m2<br />
3960612210 Set Strip Forms 1-Sided m2<br />
3960612211 Drill Form Rock Anchors ea<br />
3960612212 Set Strip Forms m2<br />
3960612220 Set Strip Forms 2-Sided m2<br />
3960612300 Set Strip Elevated Slab Soffits m2<br />
3960612310 Falsework Up & Down m2<br />
3960612311 Extra Heavy Duty Frames Up & Down m2<br />
3960612320 Set Strip Soffit m2<br />
3960612330 Set Strip Soffit Edge m2<br />
3960613000 Build Forms in Place m2<br />
3960613100 Supply Set Strip Bulkheads m2<br />
3960613200 Supply Set Strip Box Outs m2<br />
3960620000 Batch & Deliver Concrete including Overbreak m3<br />
3960621000 Batch Plant Operation m3<br />
3960622000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3960623000 Concrete Admixtures m3<br />
3960624000 Supply Water m3<br />
3960625000 Supply Cement & Flyash t<br />
3960626000 Deliver Concrete m3<br />
3960630000 Place Concrete including Overbreak m3<br />
3960631000 Joint Preparation m2<br />
3960631100 Greencut m2<br />
3960631200 Apply Bonding Agent m2<br />
3960632000 Place & Screed Concrete- Neatline m3<br />
3960632100 Place Invert Slab Concrete m3<br />
3960632110 Place Concrete m3<br />
3960632120 Horizontal Wet Finish m2<br />
3960632200 Place Wall Concrete m3<br />
3960632300 Place Elevated Slab Concrete m3<br />
3960632310 Place Concrete m3<br />
3960632320 Horizontal Wet Finish m2<br />
3960632400 Cure Concrete m3<br />
3960633000 Place Overbreak Concrete m3<br />
3960640000 Finish Concrete m2<br />
3960641000 Patch Concrete (Class C) m2<br />
3960641100 Patch Concrete at Grade m2<br />
3960641200 Patch Elevated Concrete m2<br />
3960642000 Point & Patch Concrete (Class B) m2<br />
3960642100 Point & Patch Concrete at Grade m2<br />
3960642200 Point & Patch Elevated Concrete m2<br />
3960643000 Rub Finish (Class A) m2<br />
3960643100 Rub Finish Concrete at Grade m2<br />
3960643200 Rub Finish Elevated Concrete m2<br />
3960643300 Rub Finish Water Passages at Grade m2<br />
03/01/2009 1:04:57 PM Page No 83 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3960643400 Rub Finish Water Passages Elevated m2<br />
3960650000 Concrete Accessories m3<br />
3960651000 Waterstop m<br />
3960652000 Joint Filler m2<br />
3960653000 Joint Sealer m<br />
3960700000 Powerhouse Second Stage Concrete m3<br />
3960510000 Fabricate Set Strip Formwork m2<br />
3960513000 Build Forms in Place m2<br />
3960513100 Supply Set Strip Bulkheads Scrollcase Embedment m2<br />
3960513200 Supply Set Strip Box Outs Second Stage m2<br />
3960520000 Batch & Deliver Concrete m3<br />
3960521000 Batch Plant Operation m3<br />
3960522000 Concrete Aggregate tonne<br />
3920622100 Primary Crushing tonne<br />
3920622200 Secondary Crushing tonne<br />
3920622300 Wash Aggregate tonne<br />
3920622400 Supply Shotrock tonne<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
3920622500 Supply Pitrun tonne<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
3960523000 Concrete Admixtures m3<br />
3960524000 Supply Water m3<br />
3960525000 Supply Cement & Flyash t<br />
3960526000 Deliver Concrete m3<br />
3960530000 Place Concrete m3<br />
3960531000 Joint Preparation m2<br />
3960531100 Greencut m2<br />
3960532000 Place & Screed Concrete - Neatline m3<br />
3960532100 Place Scrollcase Embeddment Concrete m3<br />
3960632210 Place Concrete m3<br />
3960632220 Horizontal Wet Finish m2<br />
3960532200 Place Second Stage Concrete m3<br />
3960632410 Place Concrete m3<br />
3960632420 Horizontal Wet Finish m2<br />
3960532300 Cure Concrete m3<br />
3960800000 Reinforcing Steel t<br />
3960810000 Supply & Place Reinforcing Steel t<br />
3960820000 Rock Dowels t<br />
3960830000 Offload Reinforcing Steel t<br />
3960840000 Hoist Reinforcing Steel t<br />
3960850000 Erect Rebar Templates t<br />
3963 Powerhouse Building LS<br />
3960900000 Structural Steel Superstructure kg<br />
3961000000 Steel Deck Superstructure m2<br />
3961100000 Roofing Superstructure m2<br />
3961200000 Cladding Superstructure m2<br />
3961300000 Powerhouse Doors m2<br />
3961400000 Architectural m2<br />
3961410000 Masonry m2<br />
3961420000 Misc Metal kg<br />
3961430000 Thermal & Moisture Protection m2<br />
3961440000 Steel Doors & Frames ea<br />
3961450000 Interior Finishes m2<br />
3961451000 Metal Stud Walls m2<br />
3961452000 Drywall m2<br />
3961453000 Tile m2<br />
3961454000 Paint m2<br />
3964 Powerhouse Equipment m2<br />
3961500000 Draftube Stoplogs m2<br />
3961510000 Stoplogs m2<br />
3961520000 Guides & Embedded Parts m2<br />
3961530000 Gantry Crane for Draft Tube Stoplogs ls<br />
03/01/2009 1:04:57 PM Page No 84 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
3961531000 Crane ea<br />
3961532000 Laying of rails, anchorages, etc. LS<br />
3961600000 Powerhouse Overhead Crane ea<br />
3961610000 Powerhouse Crane for 38.5 MW Turbines ea<br />
3961620000 Powerhouse Crane for 70 MW Turbines ea<br />
3961630000 Powerhouse Crane for 166 MW Turbines ea<br />
3961640000 Powerhouse Crane for 187 MW Turbines ea<br />
3961700000 Overhead Service Crane (5 Tonne for Service & Assembly Are ea<br />
3961710000 Service & Assembly Area Crane ea<br />
3961720000 Repair Shop Crane ea<br />
3961800000 Service Elevator ea<br />
3961810000 Above Ground Powerhouse Service Elevator ea<br />
3961820000 Underground Powerhouse Cable Shaft Elevating work platformea<br />
3965 Powerhouse Balance of Plant MW<br />
3966 Balance of Plant Complete LS<br />
3981000000 Balance of Plant Electrical MW<br />
3982000000 Balance of Plant Mechanical MW<br />
3967 Balance of Plant <strong>Work</strong> <strong>Breakdown</strong> LS<br />
3983000000 Balance of Plant Mechanical LS<br />
3983100000 Headworks Systems LS<br />
3983110000 HVAC LS<br />
3983120000 Piping LS<br />
3983130000 Fire Suppression LS<br />
3983140000 Instrumentation LS<br />
3983200000 Powerhouse Systems LS<br />
3983210000 HVAC System LS<br />
3983220000 Drainage System LS<br />
3983230000 Unwatering System LS<br />
3983240000 Fireprotection System LS<br />
3983250000 Domestic Water & Sanitary System LS<br />
3983260000 Service Water System LS<br />
3984000000 Balance of Plant Electrical LS<br />
3985000000 Embedded Metal m3<br />
4000 Process Equipment LS<br />
4010 Process Piping & Integration LS<br />
4010 Gas and Vapor Process Piping m<br />
4011000000 Steam Process Piping m<br />
4011130000 Low-Pressure Steam Process Piping m<br />
4011160000 Intermediate-Pressure Steam Process Piping m<br />
4011190000 High-Pressure Steam Process Piping m<br />
4011230000 Condensate Process Piping m<br />
4012000000 Compressed Air Process Piping m<br />
4012130000 Breathing Compressed Air Process Piping m<br />
4012160000 Non-Breathing Compressed Air Process Piping m<br />
4013000000 Inert Gases Process Piping m<br />
4013130000 Argon Process Piping m<br />
4013160000 Carbon-Dioxide Process Piping m<br />
4013190000 Helium Process Piping m<br />
4013230000 Krypton Process Piping m<br />
4013260000 Neon Process Piping m<br />
4013290000 Nitrogen Process Piping m<br />
4013330000 Xenon Process Piping m<br />
4013930000 Mixed Inert Gases Process Piping m<br />
4014000000 Fuel Gases Process Piping m<br />
4014123000 Carbon-Monoxide Piping m<br />
4014126000 Chlorine Fuel Gas Piping m<br />
4014129000 Coke Oven Gas Piping m<br />
4014130000 Blast Furnace Piping m<br />
4014160000 Blue (Water) Fuel Gas Piping m<br />
4014190000 Butane Piping m<br />
4014330000 Ethane-Gas Piping m<br />
4014360000 Hydrogen Fuel Gas Piping m<br />
4014390000 Liquid Natural-Gas Process Piping m<br />
4014430000 Methylacetylene-Propadiene Fuel Gas Piping m<br />
4014490000 Natural-Gas Process Piping m<br />
4014530000 Octane Fuel Gas Piping m<br />
4014590000 Propane Fuel Gas Process Piping m<br />
4014630000 Sewage Fuel Gas Piping m<br />
03/01/2009 1:04:57 PM Page No 85 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4014930000 Mixed Fuel Gases Piping m<br />
4015000000 Combustion System Gas Piping m<br />
4015130000 Combustion Air Piping m<br />
4015160000 Oxygen Combustion System Gas Piping m<br />
4015190000 Flue-Gas Combustion System Piping m<br />
4015230000 Exothermic -Gas Combustion System Piping m<br />
4015260000 Endothermic -Gas Combustion System Piping m<br />
4015290000 Disassociated-Ammonia-Gas Combustion System Piping m<br />
4016000000 Specialty and High-Purity Gases Piping m<br />
4016130000 Ammonia Gas Piping m<br />
4016160000 Boron Gas Piping m<br />
4016260000 Diborane Gas Piping m<br />
4016290000 Flourine Gas Piping m<br />
4016330000 Hydrogen Sulfide Gas Piping m<br />
4016360000 Nitrous-Oxide Gas Process Piping m<br />
4016390000 Ozone Gas Piping m<br />
4016430000 Phosphine Gas Piping m<br />
4016460000 Silane Gas Piping m<br />
4016490000 Sulphur-Dioxide Gas Piping m<br />
4016530000 Specialty Gas Mixtures Piping m<br />
4016560000 High-Purity Gas Piping m<br />
4017000000 Welding and Cutting Gases Piping m<br />
4017130000 Acetylene Welding and Cutting Piping m<br />
4017160000 Acetylene-Hydrogen Mix Welding and Cutting Piping m<br />
4017190000 Methylacetylene-Propadiene Welding and Cutting Piping m<br />
4017230000 Oxygen Welding and Cutting Piping m<br />
4017260000 Inert Gas Welding and Cutting Piping m<br />
4018000000 Vacuum Systems Process Piping m<br />
4018000000 High-Vacuum Systems Process Piping m<br />
4018130000 Low-Vacuum Systems Process m<br />
4020 Liquids Process Piping m<br />
4021000000 Liquid Fuel Process Piping m<br />
4021130000 Bio Fuels Process Piping m<br />
4021160000 Gasoline Process Piping m<br />
4021190000 Diesel Process Piping m<br />
4021230000 Fuel-Oils Process Piping m<br />
4022000000 Petroleum Products Piping m<br />
4022130000 Heavy-Fractions Petroleum Products Piping m<br />
4022160000 Light-Fractions Petroleum Products Piping m<br />
4023000000 Water Process Piping m<br />
4023130000 De-Ionized Water Process Piping m<br />
4023160000 Distilled-Water Process Piping m<br />
4023190000 Process Plant Water Piping m<br />
4023230000 Potable Water Process Piping m<br />
4023290000 Recirculated Water Process Piping m<br />
4023330000 Reverse-Osmosis Water Process Piping m<br />
4023360000 Sanitary Water Process Piping m<br />
4024000000 Specialty Liquid Chemicals Piping m<br />
4024130000 Alcohol Piping m<br />
4024160000 Gel Piping m<br />
4024190000 Slurries Process Piping m<br />
4024230000 Thixotropic Liquid Piping m<br />
4025000000 Liquid Acids and Bases Piping m<br />
4025130000 Liquid Acids Piping m<br />
4025160000 Liquid Bases Piping m<br />
4026000000 Liquid Polymer Piping m<br />
4030 Solid and Mixed Materials Piping & Chutes m<br />
4032000000 Bulk Materials Piping and Chutes m<br />
4032130000 Abrasive Materials Piping and Chutes m<br />
4032160000 Nonabrasive Materials Piping and Chutes m<br />
4033000000 Bulk Materials Valves ea<br />
4033130000 Airlock Bulk Materials Valves LS<br />
4033160000 Blind Bulk Materials Valves LS<br />
4033190000 Butterfly Bulk Materials Valves LS<br />
4033230000 Cone Bulk Materials Valves LS<br />
4033260000 Diverter Bulk Materials Valves LS<br />
4033290000 Double or Single Dump Bulk Materials Valves LS<br />
4033330000 Knife and Slide Gate Bulk Materials Valves LS<br />
4033360000 Pinch Bulk Materials Valves LS<br />
03/01/2009 1:04:57 PM Page No 86 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4033390000 Swing Bulk Materials Valves LS<br />
4033430000 Specialty Bulk Materials Valves LS<br />
4034000000 Pneumatic Conveying Lines m<br />
4034130000 Dense Phase Pneumatic Conveying Lines m<br />
4034160000 Dilute Phase Pneumatic Conveying Lines m<br />
4040 Process Piping and Equipment Protection LS<br />
4041000000 Process Piping and Equipment Heat Tracing LS<br />
4041130000 Process Piping Heat Tracing m<br />
4041230000 Process Equipment Heat Tracing ea<br />
4042000000 Process Piping and Equipment Insulation m<br />
4042130000 Process Piping Insulation m<br />
4042230000 Process Equipment Insulation ea<br />
4046000000 Process Corrosion Protection m<br />
4046160000 Coatings and Wrappings for Process Corrosion Protection m<br />
4046420000 Cathodic Process Corrosion Protection ea<br />
4047000000 Refractories LS<br />
4047130000 Silica Refractories ea<br />
4047160000 Alumina Refractories ea<br />
4047190000 Carbon and Graphite Refractories ea<br />
4047230000 Castable Refractories ea<br />
4047260000 Rammed Refractories ea<br />
4047290000 Refractory Concrete ea<br />
4060 Commissioning of Process Systems LS<br />
4090 Instrumentation and Control for Process Systems LS<br />
4091000000 Primary Process Measurement Devices ea<br />
4091130000 Chemical Properties Process Measurement Devices ea<br />
4091160000 Electromagnetic Process Measurement Devices ea<br />
4091190000 Physical Properties Process Measurement Devices ea<br />
4091230000 Miscellaneous Properties Measurement Devices ea<br />
4092000000 Primary Control Devices ea<br />
4092130000 Primary Control Valves ea<br />
4092290000 Current-To-Pressure Converters ea<br />
4092330000 Self-Contained Flow Controllers ea<br />
4092360000 Linear Actuators and Positioners ea<br />
4092390000 Self-Contained Pressure ea<br />
4092430000 Rotary Actuators ea<br />
4092460000 Saturable Core Reactors ea<br />
4092490000 Variable Frequency Drives ea<br />
4092530000 Voltage-To-Pressure Converters ea<br />
4093000000 Analog Controllers/Recorders ea<br />
4093130000 Analog Controllers ea<br />
4093230000 Chart Recorders ea<br />
4094000000 Digital Process Controllers ea<br />
4094130000 Digital Process Control Computers ea<br />
4094230000 Distributed Process Control Systems ea<br />
4094330000 Human-Machine Interfaces ea<br />
4094430000 Programmable Logic Process Controllers ea<br />
4095000000 Process Control Hardware ea<br />
4095130000 Process Control Panels and Hardware ea<br />
4095200000 Process Control Display Devices ea<br />
4095230000 Process Control Input/Output Modules ea<br />
4095260000 Process Control Instrument Air Piping and Devices ea<br />
4095330000 Process Control Networks ea<br />
4095430000 Process Control Hardware Interfaces ea<br />
4095460000 Process Control Mounting Racks and Supports ea<br />
4095490000 Process Control Routers ea<br />
4095530000 Process Control Switches ea<br />
4095560000 Process Control Transformers ea<br />
4095630000 Process Control Wireless Equipment ea<br />
4095730000 Process Control Wiring ea<br />
4096000000 Process Control Software LS<br />
4096100000 Process Control Software Architecture LS<br />
4096150000 Process Control Software Input/Output Lists LS<br />
4096200000 Process Control Software Instrument Lists LS<br />
4096250000 Process Control Software Logic Diagrams LS<br />
4096300000 Process Control Software Loop Diagrams LS<br />
4096350000 Process Control Software Programming LS<br />
4096400000 Process Control Software Reports LS<br />
4097000000 Process Control Auxiliary Devices ea<br />
03/01/2009 1:04:57 PM Page No 87 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4097100000 Process Control Annunciators ea<br />
4097150000 Process Control Gages ea<br />
4097200000 Process Control Rotameters ea<br />
4097250000 Process Control Potentiometers ea<br />
4097300000 Process Control Test Equipment ea<br />
4100 Material Processing & Handling LS<br />
4110 Bulk Material Processing Equipment LS<br />
4111000000 Bulk Material Sizing Equipment ea<br />
4111100000 Hammermills LS<br />
4111200000 Impactors LS<br />
0010 Twin Rotor Impactors LS<br />
0020 Reversable Impactors LS<br />
4111300000 Granulators LS<br />
4111400000 Crushers LS<br />
4111410000 Gravity Impact Crushers LS<br />
4111420000 Single Roll Crushers LS<br />
4111500000 Crackers LS<br />
4112000000 Bulk Material Conveying Equipment ea<br />
4112100000 Belt Conveyors LS<br />
4112200000 Bucket Conveyors LS<br />
4112300000 Tube-Flow Conveyors LS<br />
4112400000 Multi-Flow Conveyors LS<br />
4112500000 Screw Conveyors LS<br />
4113000000 Bulk Material Feeders ea<br />
4113100000 Bin Activators LS<br />
4113200000 Gravity Feeders LS<br />
4113300000 Vibrating Feeders LS<br />
4113400000 Volumetric Feeders LS<br />
4113500000 Conveyor Feeders LS<br />
4113600000 Chemical Feeders LS<br />
4114000000 Batching Equipment ea<br />
4115000000 Screens & Classification Equipment LS<br />
4115100000 Vibrating Screens LS<br />
4115200000 Rotary Screens LS<br />
4115300000 Separators LS<br />
4115400000 Sifters LS<br />
4115410000 Centrifical Sifters LS<br />
4115420000 Pressure Sifters LS<br />
4115560000 Vibrating Packers LS<br />
4115500000 Classifiers LS<br />
4120 Piece Material Handling Equipment LS<br />
4121000000 Conveyors m<br />
4122000000 Cranes and Hoists ea<br />
4123000000 Lifting Devices ea<br />
4124000000 Specialty Material Handling Equipment ea<br />
4130 Manufacturing Equipment LS<br />
4131000000 Manufacturing Lines and Equipment ea<br />
4132000000 Forming Equipment ea<br />
4133000000 Machining Equipment ea<br />
4134000000 Finishing Equipment ea<br />
4135000000 Dies and Molds ea<br />
4136000000 Assembly and Testing Equipment ea<br />
4140 Container Processing and Packaging LS<br />
4141000000 Container Filling and Sealing ea<br />
4142000000 Container Packing Equipment ea<br />
4143000000 Shipping Packaging ea<br />
4150 Material Storage LS<br />
4151000000 Automatic Material Storage LS<br />
4152000000 Bulk Material Storage ea<br />
4153000000 Storage Equipment and Systems LS<br />
4160 Permanent Mobile Plant Equipment LS<br />
4161000000 Mobile Earth Moving Equipment LS<br />
4162000000 Trucks LS<br />
4163000000 General Vehicles ea<br />
4164000000 Rail Vehicles ea<br />
03/01/2009 1:04:57 PM Page No 88 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4165000000 Mobile Support Equipment ea<br />
4166000000 Miscellaneous Mobile Equipment ea<br />
4167000000 Plant Maintenance Equipment ea<br />
4200 Process Heating Cooling & Drying LS<br />
4210 Process Heating Equipment LS<br />
4211000000 Process Boilers ea<br />
4211100000 Packaged Boilers LS<br />
4211200000 Boiler Stacks LS<br />
4212000000 Process Heaters ea<br />
4212100000 Immersion Heaters LS<br />
4212200000 Feedwater Heaters LS<br />
4212300000 Fuel Oil Heaters LS<br />
4213000000 Industrial Heat Exchangers and Recuperators ea<br />
4213100000 Hairpin Exchangers LS<br />
4213110000 Shell & Tube Exchangers LS<br />
4213120000 Water Heat Exchangers LS<br />
4214000000 Industrial Furnaces ea<br />
4215000000 Industrial Ovens ea<br />
4216000000 Heating Coils LS<br />
4220 Process Cooling Equipment LS<br />
4221000000 Process Cooling Towers LS<br />
4222000000 Process Chillers and Coolers ea<br />
4223000000 Process Condensers and Evaporators ea<br />
4223100000 Vertical Tube Condensers LS<br />
4224000000 Acid Coolers LS<br />
4230 Process Drying Equipment LS<br />
4231000000 Gas Dryers and Dehumidifiers ea<br />
4232000000 Material Dryers LS<br />
10 Rotary Drum Dryers LS<br />
20 Conical Dryers LS<br />
30 Drum Dryers LS<br />
4233000000 Flakers LS<br />
4300 Process Gas Liquid Handling, Purification & Storage LS<br />
4310 Gas Handling Equipment LS<br />
4311000000 Gas Fans, Blowers and Pumps ea<br />
4311100000 Air Blowers LS<br />
4311200000 Industrial Fans LS<br />
4311300000 Air Dryers LS<br />
4311400000 Air Receivers LS<br />
4312000000 Gas Compressors ea<br />
4312100000 Air Breathable Compressors LS<br />
4312110000 Reciprocating Compressors LS<br />
4312120000 Rotary Screw Compressors LS<br />
4312130000 Centrifugal Compressors LS<br />
4313000000 Gas Process Equipment LS<br />
4313100000 Inert Gas Generators LS<br />
4320 Liquid Handling Equipment LS<br />
4321000000 Liquid Pumps ea<br />
4321100000 Turbine Pumps LS<br />
4321110000 Sump Pumps LS<br />
4321120000 Sewage Pumps LS<br />
4321130000 Plunger Pumps LS<br />
4321140000 Metering Pumps LS<br />
4321150000 Centrifugal Pumps LS<br />
4321160000 Vacuum Pumps LS<br />
4322000000 Liquid Process Equipment ea<br />
4322100000 Mixers LS<br />
4322110000 Pipeline Mixers LS<br />
4322120000 Batch Mixers LS<br />
4322130000 Dispersion Mixers LS<br />
4322140000 Portable Mixers LS<br />
4322150000 Geared Mixers LS<br />
4322160000 Chemical Mixers LS<br />
4322200000 Blenders LS<br />
4322300000 Agitators LS<br />
4322400000 Clarifiers LS<br />
03/01/2009 1:04:57 PM Page No 89 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4322500000 Separators LS<br />
4322600000 Filters LS<br />
4330 Gas and Liquid Purification Equipment LS<br />
4331000000 Gas and Liquid Purification Filtration Equipment ea<br />
4332000000 Gas and Liquid Purification Process Equipment ea<br />
4340 Gas and Liquid Storage LS<br />
4341000000 Storage Tanks ea<br />
4342000000 Pressure Vessels LS<br />
4343000000 Spheres LS<br />
4344000000 Reactors LS<br />
4400 Pollution Control Equipment LS<br />
4410 Air Pollution Control LS<br />
4411000000 Scrubbers ea<br />
4411100000 Centrical Scrubbers LS<br />
4411200000 Gas Scrubbers LS<br />
4412000000 Dust Collectors LS<br />
10 Filter Collectors LS<br />
20 Cyclone Collectors LS<br />
30 Bag House Dust Collectors LS<br />
4420 Noise Pollution Control LS<br />
4421000000 Noise Pollution Control Equipment LS<br />
4430 Water Treatment Equipment LS<br />
4441000000 Packaged Water Treatment ea<br />
4442000000 Water Treatment Equipment ea<br />
4443000000 Water Filtration Equipment ea<br />
4444000000 Water Treatment Chemical Systems Equipment LS<br />
4445000000 Water Treatment Biological Systems Equipment ea<br />
4446000000 Sludge Treatment and Handling Equipment for Water Treatme ea<br />
4440 Solid Waste Control LS<br />
4451000000 Packaged Sewage Treatment Equipment LS<br />
4452000000 Clarifiers LS<br />
4453000000 Chlorinators LS<br />
4454000000 Separators LS<br />
4455000000 Filters LS<br />
4456000000 Skimmers LS<br />
4457000000 Control Systems LS<br />
4458000000 Screening Equipment LS<br />
4450 Pollution Detection Equipment LS<br />
4471100000 Analyzers LS<br />
4471200000 Measuring Systems LS<br />
4471300000 Samplers LS<br />
4500 Industry Specific Manufacturing Equipment LS<br />
4510 Oil and Gas Extraction Equipment LS<br />
4512 Textiles and Apparel Manufacturing Equipment LS<br />
4514 Wood Product Manufacturing Equipment LS<br />
4516 Paper Manufacturing Equipment LS<br />
4517 Printing and Related Manufacturing Equipment LS<br />
4518 Petroleum and Coal Products Manufacturing Equipment LS<br />
4520 Chemical Manufacturing Equipment LS<br />
4522 Plastics and Rubber Manufacturing Equipment LS<br />
4524 Nonmetallic Mineral Product Manufacturing Equipment LS<br />
4526 Primary Metal Manufacturing Equipment LS<br />
4528 Fabricated Metal Product Manufacturing Equipment LS<br />
4530 Machinery Manufacturing Equipment LS<br />
4532 Computer and Electronic Product Manufacturing Equipme LS<br />
4534 Electrical Equipment, Appliance, and Component Manufac LS<br />
4536 Transportation Manufacturing Equipment LS<br />
4538 Furniture and Related Product Manufacturing Equipment LS<br />
4540 Other Manufacturing Equipment LS<br />
4800 Power Generation Equipment MW<br />
4810 Fossil Fuel Plant Electrical Power Generation Equipment LS<br />
4810000000 Fossil Fuel Plant Electrical Power Generation Equipment ea<br />
03/01/2009 1:04:57 PM Page No 90 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4820 Nuclear Fuel Plant Electrical Power Generation Equipment LS<br />
4820000000 Nuclear Fuel Plant Electrical Power Generation Equipment ea<br />
4830 Solar Energy Electrical Power Generation Equipment LS<br />
4830000000 Solar Energy Electrical Power Generation Equipment LS<br />
4840 Hydroelectric Power Generation Equipment MW<br />
4841000000 Turbines MW<br />
4841100000 Kaplan Turbines ea<br />
4841200000 Francis Turbines ea<br />
4841210000 Supply Turbines ea<br />
3970821100 Wicket Gates ea<br />
3970821200 Bottom Ring ea<br />
3970821300 Head Cover ea<br />
3970821400 Runners ea<br />
3970821500 Turbine Inlet Valves ea<br />
3970821600 Cooling Water Systems LS<br />
3970821700 Low Pressure Compressed Air System LS<br />
3970821800 Drainage & Dewatering System LS<br />
3970821900 Turbine Blowdown for Synchronous Condenser Operation LS<br />
4841220000 Coating of Turbines ea<br />
4841230000 Spare Parts LS<br />
4841240000 Tools LS<br />
4841300000 Saxo Turbines ea<br />
4841310000 Supply Turbines ea<br />
3970831100 Upstream Inlet components ea<br />
3970831200 Distributor Assembly (ies) ea<br />
3970831300 Shaft assembly (ies) c/w turbine bearings and seals ea<br />
3970831400 Runner Assembly (ies) ea<br />
3970831500 Turbine Inlet Valves ea<br />
3970831600 Cooling Water Systems LS<br />
3970831700 Low Pressure Compressed Air System LS<br />
3970831800 Drainage & Dewatering System LS<br />
3970831900 Downstream Draft tube liner LS<br />
4841320000 Coating of Turbines ea<br />
4841330000 HPU ea<br />
4841340000 Spare Parts LS<br />
4841350000 Tools LS<br />
4842000000 Governing Systems LS<br />
4843000000 Generators and Auxiliaries LS<br />
4843100000 Generator LS<br />
4843200000 Generator Breaker & Bus LS<br />
4843300000 Controls, Metering & Protection LS<br />
4843400000 SCADA System LS<br />
4843500000 Exciters LS<br />
4844000000 Transformers LS<br />
4844100000 Main Power Transformers LS<br />
4844200000 Station Service Transformers LS<br />
4845000000 Switchgear LS<br />
4845100000 Switchyard Equipment LS<br />
4845200000 Batteries & Charger System LS<br />
4845300000 Control, Metering and Relaying LS<br />
4845400000 High Voltage Cable to Switchyard m<br />
4845500000 Breakers LS<br />
4845600000 Revenue Metering System LS<br />
4850 Wind Energy Electrical Power Generation Equipment LS<br />
4850000000 Wind Energy Electrical Power Generation Equipment ea<br />
4860 Geothermal Energy Electrical Power Generation Equipmen LS<br />
4860000000 Geothermal Energy Electrical Power Generation Equipment ea<br />
4870 Electrochemical Energy Electrical Power Generation Equip LS<br />
4870000000 Electrochemical Energy Electrical Power Generation Equipmen ea<br />
4880 Fuel Cell Electrical Power Generation Equipment LS<br />
4880000000 Fuel Cell Electrical Power Generation Equipment ea<br />
4890 Electrical Power Control Equipment LS<br />
4890000000 Electrical Power Control Equipment LS<br />
4891000000 Electrical Power Generation Test Equipment ea<br />
03/01/2009 1:04:57 PM Page No 91 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
4892000000 Hydroelectric Equipment Testing LS<br />
4892100000 Model Testing LS<br />
4892200000 Index Testing LS<br />
4892300000 Cavitation Inspection LS<br />
5000 Mobile Equipment LS<br />
5100 Transit Vehicles LS<br />
10 Light Rail Vehicles LS<br />
5110000000 Low Profile Tram Cars ea<br />
5111000000 Tram Base Vehicles ea<br />
5112000000 Vehicle Options ea<br />
5112100000 Additional Power ea<br />
5112200000 Premium Air Conditioning System ea<br />
5112300000 Premium Colour Passenger Information System ea<br />
5112400000 Interior & Exterior CCTV System ea<br />
5112500000 Passenger Counting System for 12 Doors ea<br />
5112600000 Wheel Chair Ramps ea<br />
5112700000 Special Security Equipment (Safety Glass & Roof Cover) ea<br />
5112800000 Full Scale Mockup ea<br />
5112900000 Special Exterior Design of Front Module ea<br />
5120000000 Rail Grinding Vehicle ea<br />
5130000000 Rescue Rail-Road Vehicle ea<br />
5140000000 Tower Rail Road Vehicle ea<br />
5150000000 Shunting Vehicles ea<br />
5160000000 Rail Cars ea<br />
5200 Transit Buses LS<br />
5210000000 Transit Buses ea<br />
5300 Operations & Maintenance Equipment LS<br />
5310 Service Equipment LS<br />
5311000000 Flat Bed Truck ea<br />
5312000000 Fuel Truck ea<br />
5313000000 Forklift ea<br />
5314000000 Lube Truck ea<br />
5315000000 Welding Service Truck ea<br />
5420 Maintenance Equipment LS<br />
5421000000 Vacuum Truck ea<br />
5422000000 Watertruck ea<br />
5423000000 Boomtruck ea<br />
5424000000 Grader ea<br />
5425000000 Loader ea<br />
5426000000 Mobile Crane ea<br />
5427000000 Shop Equipment LS<br />
5427100000 Bridge Cranes ea<br />
5427200000 <strong>Work</strong>shop Cranes ea<br />
5427300000 Underfloor lathe with holding-down devices ea<br />
5427400000 Sand Filling Facility ea<br />
5427500000 Mobile Jacks (for lifting vehicles) ea<br />
5427600000 Small Body Repair Equipment LS<br />
5427700000 Small Repair Equipment LS<br />
5427800000 Maintenance & Inspection Tools LS<br />
5530 Personnel Vehicles LS<br />
5531000000 Sedan Car 4-Door ea<br />
553200000 Sport Utility Vehicle 4x4 ea<br />
5533000000 Pickup Truck ea<br />
5534000000 Minivan ea<br />
5800 Construction Equipment LS<br />
5810 Earthmoving & Clearing Equipment LS<br />
5811000000 Dozers ea<br />
5811100000 Tractor Dozers ea<br />
5811200000 Wheel Dozers ea<br />
5811300000 Dozer Attachements ea<br />
5812000000 Loaders ea<br />
5812100000 Wheel Loaders ea<br />
5812200000 Track Loaders ea<br />
5812300000 Belt Loaders ea<br />
5812400000 Skid Steer Loaders ea<br />
03/01/2009 1:04:57 PM Page No 92 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
5813000000 Graders ea<br />
5813100000 Motor Graders ea<br />
5813200000 Grading Finishers ea<br />
5813300000 Conditioning Equipment ea<br />
5813400000 Gravel Spreaders ea<br />
5814000000 Excavators ea<br />
5814100000 Backhoe Excavators ea<br />
5814200000 Backhoe-Loaders ea<br />
5814300000 Gradall Excavators ea<br />
5814400000 Front Shovels ea<br />
5814500000 Dragline Excavators ea<br />
5815000000 Haul Trucks ea<br />
5815100000 Highway Trucks ea<br />
5815200000 Articulated Trucks ea<br />
5815300000 Off Highway trucks ea<br />
5815400000 Belly Dump Trucks ea<br />
5815500000 All Terrain Trucks ea<br />
5816000000 Scrapers ea<br />
5816100000 Towed Scapers ea<br />
5816200000 Elevating Scapers ea<br />
5816300000 Wheel Scrapers ea<br />
5817000000 Compactors ea<br />
5817100000 Manually Guided Packers ea<br />
5817200000 Self Propelled Packers ea<br />
5817300000 Towed Packers ea<br />
5818000000 Clearing Equipment ea<br />
5818100000 Skidders ea<br />
5818200000 Harvesters ea<br />
5818300000 Chippers ea<br />
5818400000 Knuckleboom Loaders ea<br />
5818500000 Chippers ea<br />
5820 Paving & Crushing Equipment LS<br />
5821000000 Asphalt Paving Equipment LS<br />
5821100000 Asphalt Plants ea<br />
5821200000 Asphalt Spreaders ea<br />
5821300000 Material Transfer Equipment ea<br />
5821400000 Asphalt Rollers ea<br />
5821500000 Asphalt Sweepers ea<br />
5821600000 Resurfacing Equipment ea<br />
5822000000 Concrete Paving Equipment LS<br />
5822100000 Concrete Paving Plant ea<br />
5822200000 Concrete Pavers ea<br />
5822300000 Finishing <strong>Work</strong> Bridges ea<br />
5822400000 Concrete Finishers ea<br />
5822500000 Curing Equipment ea<br />
5822600000 Concrete Curb Machines ea<br />
5822700000 Concrete Barrier Machines ea<br />
5823000000 Traffic Control Equipment LS<br />
5823100000 Traffic Control Vehicles ea<br />
5823200000 Traffic Control Accessories ea<br />
5824000000 Crushing Equipment LS<br />
5824100000 Jaw Crushers ea<br />
5824200000 Cone Crushers ea<br />
5824300000 Impact Crushers ea<br />
5825000000 Screening Equipment LS<br />
5825100000 Screening Plant ea<br />
5825200000 Vibrating Grizzlies ea<br />
5825300000 Feeders ea<br />
5826000000 Washing Equipment LS<br />
5826100000 Single Screw Washing Plant ea<br />
5826200000 Double Screw Washing Plant ea<br />
5827000000 Conveying Equipment LS<br />
5827100000 Radial Stackers m<br />
5827200000 Conveyors m<br />
5828000000 Scales ea<br />
5829000000 Processing Spreads ea<br />
5830 Pipeline & Welding Equipment LS<br />
5831000000 Trenching Equipment ea<br />
5831100000 Trenching Machines ea<br />
03/01/2009 1:04:57 PM Page No 93 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
5831200000 Trench Boxes ea<br />
5832000000 Sidebooms ea<br />
5833000000 Welding & Cutting Equipment LS<br />
5833100000 Gas Powered Welders ea<br />
5833200000 Diesel Powered Welders ea<br />
5833300000 Electric Welders ea<br />
5833400000 Fusion Machines ea<br />
5833500000 Cutting Torches ea<br />
5833600000 Welding Rigs ea<br />
5834000000 Pipeline Accessories LS<br />
5835000000 Pipeline Trucks LS<br />
5836000000 Pipeline Restoration LS<br />
5837000000 Other Pipeline Equipment LS<br />
5840 Concrete & Grouting Equipment LS<br />
5841000000 Concrete Batching LS<br />
5841100000 Concrete Batch Plants ea<br />
5841200000 Concrete Plant Accessories LS<br />
5841300000 Portable Mixers ea<br />
5842000000 Concrete Transport LS<br />
5842100000 Concrete Transit Mixers ea<br />
5842200000 Concrete Dump Trucks ea<br />
5843000000 Concrete Placement LS<br />
5843100000 Concrete Pumps ea<br />
5843200000 Concrete Conveyor ea<br />
5843300000 Concrete Buckets ea<br />
5843400000 Concrete Vibrators ea<br />
5843500000 Concrete Accessories LS<br />
5844000000 Grouting Equipment LS<br />
5845000000 Shotcrete Equipment LS<br />
5846000000 Concrete Gantry Equipment LS<br />
5850 Utility Services Equipment LS<br />
5851000000 Generators & Light Plant LS<br />
5851100000 Gas Generators ea<br />
5851200000 Diesel Generators ea<br />
5851300000 Light Plant ea<br />
5851400000 Generator Powered Message Boards ea<br />
5852000000 Pumps LS<br />
5852100000 Gas Powered Pumps ea<br />
5852200000 Diesel Powered Pumps ea<br />
5852300000 Electric Pumps ea<br />
5852400000 High Lift Pumps ea<br />
5852500000 Wellpoint Equipment ea<br />
5853000000 Compressors LS<br />
5853100000 Diesel Compressors ea<br />
5853200000 Electric Conmpressors ea<br />
5855000000 Heating Equipment LS<br />
5857000000 Cleaning Equipment LS<br />
5857100000 Sandblasting Equipment ea<br />
5857200000 Washing Equipment ea<br />
5860 Cranes & Hoisting Equipment LS<br />
5861000000 Mobile Cranes ea<br />
5861100000 Truck Cranes ea<br />
5861200000 Crawler Cranes ea<br />
5861300000 Hydraulic Cranes ea<br />
5862000000 Tower Cranes ea<br />
5862100000 Fixed Tower Cranes ea<br />
5862200000 Traveling Tower Cranes ea<br />
5863000000 Staddle Carriers ea<br />
5865000000 Forklifts ea<br />
5866000000 Manlifts ea<br />
5867000000 Derrick Cranes ea<br />
5870 Foundation & Marine Equipment LS<br />
5871000000 Pile Driving Equipment ea<br />
5871100000 Pile Driving Hammers ea<br />
5871200000 Pile Driving Leads ea<br />
5872000000 Pile Extractors ea<br />
5873000000 Augers ea<br />
03/01/2009 1:04:57 PM Page No 94 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
5873100000 Pile Augers ea<br />
5873200000 Post Hole Augers ea<br />
5874000000 Rock Socketing Equipment ea<br />
5875000000 Soil Anchor Equipment ea<br />
5875100000 Soil Anchor Drills ea<br />
5875200000 Soil Anchor Grout Plant ea<br />
5876000000 Marine Equipment ea<br />
5876100000 Tugs ea<br />
5876200000 <strong>Work</strong>boats ea<br />
5876300000 Barges ea<br />
5876400000 Scows ea<br />
5876500000 Dredges ea<br />
5877000000 Demolition Equipment LS<br />
5877100000 Concrete Saws ea<br />
5877200000 Jackhammers ea<br />
5877300000 Machine Mounted Breakers ea<br />
5880 Drilling & Tunnel Equipment LS<br />
5881000000 Surface Drills ea<br />
5881100000 Hydraulic Drilling Equipment ea<br />
5881200000 Percussion Drilling Equipment ea<br />
5881300000 Rotary Drilling Equipment ea<br />
5881400000 Core Drills ea<br />
5882000000 Tunnelling Equipment LS<br />
5882100000 Tunnel Boring Equipment ea<br />
5882200000 Tunnel Mucking Equipment LS<br />
5882300000 Tunnel Drill Jumbos ea<br />
5882400000 Tunnel Grout ea<br />
5882500000 Tunnel Ventilation Equipment LS<br />
5882600000 Tunnel Service Equipment LS<br />
5882700000 Tunnel Roadheaders ea<br />
5882700000 Tunnel Shotcrete Equipment ea<br />
5882700000 Tunnel Concrete Equipment LS<br />
5883000000 Shaft Equipment LS<br />
5883100000 Shaft Conveyors m<br />
5883200000 Shaft Muck Buckets ea<br />
5883300000 Shaft Clam Buckets ea<br />
5883400000 Shaft Excavators ea<br />
5884000000 Directional Drilling Equipment LS<br />
5884100000 Hammerhead Moles ea<br />
5884200000 Directional Drills ea<br />
5890 Service & Maintenance Equipment LS<br />
5891000000 Cars & Pickup Trucks ea<br />
5891100000 Cars ea<br />
5891200000 Pickup Trucks ea<br />
5891300000 Vans ea<br />
5892000000 Buses ea<br />
5893000000 Service Trucks ea<br />
5893100000 Flat Bed Trucks ea<br />
5893200000 Mechanic Trucks ea<br />
5893300000 General Service Trucks ea<br />
5893400000 Fuel Trucks ea<br />
5893500000 Water Trucks ea<br />
5894000000 Boomtrucks ea<br />
5895000000 Tractor Trailers & Floats ea<br />
5895100000 Trailers ea<br />
5895200000 Tractor Trailers ea<br />
5895300000 Lowboys ea<br />
5896000000 Storage & Office Trailers ea<br />
5896100000 Storage Trailers ea<br />
5896200000 Office & Lunch Trailers ea<br />
5896300000 Shop Buildings ea<br />
6000 Indirect Costs month<br />
6100 Mobilization LS<br />
6110000000 Install Temporary Site Services LS<br />
6111000000 Install Electrical Service Lines m<br />
6111100000 Hydro Service Connection ea<br />
6111200000 Install Temporary Generators ea<br />
6111300000 Install Temporary Lighting ea<br />
03/01/2009 1:04:57 PM Page No 95 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6111400000 Transmission & Distribution m<br />
6112000000 Install Phone System person<br />
6112100000 Install Phone System person<br />
6112200000 Install Radio System man<br />
6113000000 Install Water Service Lines m<br />
6113100000 Install Pump ea<br />
6113200000 Install Waterline m<br />
6114000000 Install Sanitary Service Lines m<br />
6114100000 Install Sewer Lines m<br />
6114200000 Install Portable Toilets ea<br />
6115000000 Install Compressed Air Services m<br />
6115100000 Install Compressors ea<br />
6115200000 Install Airlines m<br />
6116000000 Install Fuel Storage Tanks ea<br />
6116100000 Install Fuel Tanks ea<br />
6116200000 Install Fuel Pumps ea<br />
6120000000 Equipment Mobilization ea<br />
6121000000 Equipment Freight ea<br />
6121100000 Highway Freight ea<br />
6121200000 Rail Freight ea<br />
6121300000 Ocean Freight ea<br />
6122000000 Equipment Erection ea<br />
6123000000 Equipment Rigging LS<br />
6130000000 Non Pay Roads & Yard m2<br />
6131000000 Purchase Land ha<br />
6131100000 Purchase Land ha<br />
6131200000 Purchase Easement ha<br />
6132000000 Prepare Yard m2<br />
6132100000 Office Area m2<br />
6132200000 Shop and Warehouse Areas m2<br />
6132300000 Parking Area m2<br />
6132400000 Material Laydown Area m2<br />
6133000000 Construct Site Access m2<br />
6133100000 Construct Access Roads m2<br />
6133200000 Construct Haul Roads m2<br />
6133300000 Construct Crane Pads m2<br />
6134000000 Hoarding & Fencing m<br />
6134100000 Temporary Hoarding m<br />
6134200000 Temporary Fence m<br />
6135000000 Construct Person Access m2<br />
6135100000 Access Scaffolding m2<br />
6135200000 Access Stairs m2<br />
6135300000 Pedestrian Walkways m2<br />
6140000000 Mobilize Job Buildings ea<br />
6141000000 Transfer Job Buildings ea<br />
6142000000 Erect Job Buildings m2<br />
6142100000 Erect Site Trailers m2<br />
6142200000 Erect Shops m2<br />
6142300000 Erect Warehouse m2<br />
6143000000 Purchase Job Buildings m2<br />
6150000000 Office Furniture & Equipment person<br />
6151000000 Furniture ea<br />
6151100000 Individual Office Furniture ea<br />
6151200000 Other Furniture ea<br />
6152000000 Office Computers ea<br />
6152100000 Servers ea<br />
6152200000 Personnel Computers ea<br />
6152300000 Printers & Plotters ea<br />
6152400000 Networking Equipment ea<br />
6152500000 Software Costs person<br />
6153000000 Office Equipment ea<br />
6153100000 Photocopy Equipment ea<br />
6153200000 Fax Machines ea<br />
6160000000 Signs & Traffic Control Equipment ea<br />
6161000000 Traffic Signs ea<br />
6162000000 Traffic Message Boards ea<br />
6163000000 Project Signs ea<br />
6164000000 Traffic Barrels & Delineators ea<br />
6165000000 Precast Traffic Barriers m<br />
6200 Site Overhead LS<br />
03/01/2009 1:04:57 PM Page No 96 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6210000000 Site Supervision Month<br />
6211000000 Project Management Month<br />
6212000000 Supervision Month<br />
6212100000 Project Management Month<br />
6212200000 Supervision Civil Month<br />
6212300000 Supervision Mechanical Month<br />
6212400000 Supervision Electrical Month<br />
6213000000 <strong>Engineering</strong> Month<br />
6213100000 Project <strong>Engineering</strong> Month<br />
6213200000 Field <strong>Engineering</strong> Civil Month<br />
6213300000 Field <strong>Engineering</strong> Mechanical Month<br />
6213400000 Field <strong>Engineering</strong> Electrical Month<br />
6214000000 Office & Clerical Month<br />
6214100000 Office Staff Month<br />
6214200000 IT Staff Month<br />
6215000000 Procurement Month<br />
6215100000 Procurement Staff Month<br />
6215200000 Purchasing & Warehousing Staff Month<br />
6216000000 Safety & Medical Month<br />
6216100000 Safety Staff Month<br />
6216200000 Medical Staff Month<br />
6220000000 General Expenses Month<br />
6221000000 Office Supplies Month<br />
6221100000 Office Supplies Month<br />
6221200000 Courier & Postage Month<br />
6221300000 Printing Expense Month<br />
6221400000 Computer Maintenance Month<br />
6221500000 <strong>Engineering</strong> & Drafting Supplies Month<br />
6222000000 Legal & Public Relations Month<br />
6222100000 Legal Fees Month<br />
6222200000 Public Relations Month<br />
6223000000 Medical & Safety Expenses person<br />
6223100000 Medical Exams and Hospital Expenses person<br />
6223200000 First Aid and Medical Supplies person<br />
6223300000 Hardhats & Safety Equipment person<br />
6223400000 Weather Wear person<br />
6223500000 Safety Training Courses person<br />
6223600000 Toolbox Meetings person<br />
6224000000 Land & Property Costs Month<br />
6224100000 Land Rental Month<br />
6224200000 Property Taxes Month<br />
6225000000 Consulting Fees Month<br />
6225100000 Construction <strong>Engineering</strong> Month<br />
6225200000 Claims Consulting Month<br />
6225300000 Labour Relations Month<br />
6226000000 Administration Fees Month<br />
6226100000 Joint Venture Management Fees Month<br />
6226200000 Audit Fees Month<br />
6226300000 Bank Charges Month<br />
6227000000 License Fees & Permits LS<br />
6227100000 Building Permits LS<br />
6227200000 Dewatering Permits LS<br />
6227300000 Land Permits & Easements LS<br />
6227400000 Security Deposits LS<br />
6228000000 Management Expenses Month<br />
6228100000 Hotel & Expenses Month<br />
6228200000 Management Airfares Month<br />
6230000000 Site Services Month<br />
6231000000 Utilities & Services Month<br />
6231100000 Utility Consumption Month<br />
6231110000 Power Consumption Month<br />
6231120000 Natural Gas/Propane Consumption Month<br />
6231130000 Water & Sewer Service Month<br />
6231200000 Temporary Services Month<br />
6231210000 Operate Generators & Light Plant Month<br />
6231220000 Operate Compressors Month<br />
6231230000 Operate Pumps Month<br />
6231300000 Communication Expense Month<br />
6231310000 Telephone Charges Month<br />
6231320000 Cell Phone Charges Month<br />
6231330000 Radio Expense Month<br />
03/01/2009 1:04:57 PM Page No 97 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6231400000 Sanitary Services Month<br />
6231410000 Garbage Removal Month<br />
6231420000 Toilet Service Month<br />
6232000000 Site & Road Maintenance Month<br />
6232100000 Maintain Site Roads Months<br />
6232200000 Yarding Month<br />
6232300000 Snow Removal Month<br />
6232400000 Dust Control Month<br />
6232500000 Street Cleaning Month<br />
6232600000 Operate Scales Month<br />
6233000000 Job Buildings & Trailers Month<br />
6233100000 Rent Job Buildings Month<br />
6233110000 Office Buildings Month<br />
6233120000 Shops Month<br />
6233130000 Crew Trailers Month<br />
6233140000 Storage Trailers Month<br />
6233150000 Warehouse Month<br />
6233160000 Rent Security Guardhouse Month<br />
6233170000 Engineers Office Month<br />
6233200000 Maintain Buildings Month<br />
6233210000 Janitorial Services Month<br />
6233220000 Building Maintainance Month<br />
6233300000 Rent Office Space m2<br />
6234000000 Weather Protection Month<br />
6234100000 Protect Concrete m3<br />
6234110000 Heat Concrete m3<br />
6234120000 Cover & Protect Concrete m3<br />
6234200000 Weather Enclosures m2<br />
6234210000 Hoard Concrete m2<br />
6234220000 Enclose Building m2<br />
6234300000 Heat Enclosure Month<br />
6235000000 Overhead Transport & Equipment Month<br />
6235100000 Unallocated Pickups & Cars Month<br />
6235200000 Float Equipment Onsite Month<br />
6235300000 Bull Gang Month<br />
6235400000 Operate Bus Month<br />
6235500000 Parts Truck Operation Month<br />
6236000000 Equipment Servicing & Consumables Month<br />
6236100000 Operate Service Vehicles Month<br />
6236110000 Fuel Equipment Month<br />
6236120000 Operate Mechanics Truck Month<br />
6236130000 Operate Tire Truck Month<br />
6236140000 Lube Equipment Month<br />
6236200000 Shop Operation Month<br />
6236210000 Shop Equipment Month<br />
6236220000 Shop Supplies Month<br />
6237000000 Small Tool Allowance Month<br />
6237100000 Small Tools Manhour<br />
6237200000 Welding Consumables Month<br />
6237300000 Rigging Supplies Month<br />
6238000000 Hoisting & Handling Month<br />
6238100000 Hoisting Month<br />
6238110000 Yard Hoisting Month<br />
6238111000 Operate Mobile Yard Crane Month<br />
6238112000 Operate Forklift Month<br />
6238120000 Subcontract Hoisting Month<br />
6238121000 Operate Tower Crane Month<br />
6238122000 Operate Bridge Crane Month<br />
6238130000 Prefab Yard Hoisting Month<br />
6238131000 Operate Travel Lifts Month<br />
6238132000 Fabrication Shop Mobile Crane Month<br />
6238200000 Man Access Month<br />
6238210000 Manlifts Month<br />
6238220000 Swinge Stage Month<br />
6238230000 Crane w/ Man Basket Month<br />
6239000000 Traffic Control Month<br />
6239100000 Flagmen Month<br />
6239200000 Pace Vehicles Month<br />
6239300000 Maintain Signs Month<br />
6239400000 Relocate Precast Barriers m<br />
6239500000 Relocate Traffic Barrels ea<br />
03/01/2009 1:04:57 PM Page No 98 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6239600000 Hired Police Month<br />
6240000000 Site Survey Month<br />
6241000000 Survey Staff Month<br />
6242000000 Survey Equipment Month<br />
6243000000 Survey Supplies Month<br />
6250000000 Quality Control Month<br />
6251000000 Quality Control Services Month<br />
6251100000 Quality Control Staff Month<br />
6251200000 Quality Control Expenses Month<br />
6251300000 Inspection Services Month<br />
6252000000 Quality Control Plan Month<br />
6252100000 QC Plan Preparation Month<br />
6252200000 ISO Certification Month<br />
6253000000 Site Photos Month<br />
6253100000 Pre-Construction Survey Month<br />
6253200000 Site Photos Month<br />
6254000000 Testing Services Month<br />
6254100000 Concrete Testing m3<br />
6254200000 Asphalt Testing t<br />
6254300000 Aggregate Testing t<br />
6254400000 Compaction Testing m3<br />
6254500000 Pressure Testing Day<br />
6254600000 Welding Testing Day<br />
6254700000 Watermain Testing m<br />
6254710000 Clean & Disinfect Watermain m<br />
6254720000 Hydrostatic Testing m<br />
6254800000 Pile Tests ea<br />
6255000000 Monitoring Services Month<br />
6255100000 Monitor Blast Vibrations Month<br />
6255200000 Monitor Slope Stability Month<br />
6255300000 Monitor Tunnel Excavations Month<br />
6255400000 Monitor Air Quality ea<br />
6255500000 Monitor Noise Levels ea<br />
6256000000 Environmental Controls Month<br />
6256100000 Environmental Monitor Month<br />
6256200000 Environmental Mitigation Plan LS<br />
6256300000 Erosion Control Month<br />
6256400000 Settlement Ponds m3<br />
3127212100 Excavate m3<br />
3127212200 Haul m3<br />
3127212300 Spread m3<br />
6256500000 Hazardous Cleanup t<br />
6257000000 Diving Services Day<br />
6258000000 Instrumentation LS<br />
6260000000 Site Security Month<br />
6261000000 Security Services Month<br />
6262000000 Security Guardhouse Month<br />
6300 Fixed Plant LS<br />
6310000000 Fixed Hoisting LS<br />
6311000000 Tower Crane LS<br />
6312000000 Derrick LS<br />
6313000000 Cableway LS<br />
6314000000 Shaft Hoists LS<br />
6320000000 Borrow Pit m3<br />
6321000000 Develop Rock Borrow Pits m3<br />
6321100000 Borrow Area Clearing ha<br />
6321110000 Treed Wetlands ha<br />
6321120000 Forested Area ha<br />
6321200000 Stripping m3<br />
6321210000 Load Topsoil m3<br />
6321220000 Haul Topsoil m3<br />
6321230000 Spread Topsoil at Stockpile m3<br />
6321300000 Rehab Borrow Areas m2<br />
6321310000 Load Topsoil m3<br />
6321320000 Haul Topsoil m3<br />
6321330000 Spread Topsoil at Stockpile m3<br />
6322000000 Develop Granular Borrow Pits m3<br />
6322100000 Borrow Area Clearing ha<br />
6322110000 Treed Wetlands ha<br />
6322120000 Forested Area ha<br />
03/01/2009 1:04:57 PM Page No 99 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6322200000 Stripping m3<br />
6322210000 Load Topsoil m3<br />
6322220000 Haul Topsoil m3<br />
6322230000 Spread Topsoil at Stockpile m3<br />
6322300000 Rehab Borrow Areas m2<br />
6322310000 Load Topsoil m3<br />
6322320000 Haul Topsoil m3<br />
6322330000 Spread Topsoil at Stockpile m3<br />
6330000000 Aggregate Plant LS<br />
6331000000 Mobilize Aggregate Plant t<br />
6331100000 Prepare Site for Processing Spread ea<br />
6331200000 Move Spread to Site ea<br />
6331300000 Erect Spread ea<br />
6331400000 Move Spread off Site ea<br />
6332000000 Pit Preparation m2<br />
6332100000 Construct Access Road LS<br />
6332200000 Clear Borrow Pit ha<br />
6332300000 Strip Borrow Pit m2<br />
6332400000 Pit Restoration m2<br />
6333000000 Supply Raw Material m3<br />
6333100000 Produce Shot Rock t<br />
6333200000 Produce Pitrun Gravel t<br />
6333300000 Royalties t<br />
6334000000 Process Aggregates t<br />
6334100000 Load Raw Material t<br />
6334200000 Crush Screenings t<br />
6334300000 Stockpile Product t<br />
6334400000 Haul Aggregates In Pit t<br />
6334500000 Change Product t<br />
6334600000 Other Processing t<br />
6334700000 Additional Wear Factor t<br />
6335000000 Load Product t<br />
6336000000 Crushing Quality Control t<br />
6337000000 Operate Scales t<br />
6338000000 Wayside Permits LS<br />
6339000000 Rehandle In Stockpiles t<br />
6340000000 Asphalt Plant t<br />
6341000000 Mobilize Asphalt Plant t<br />
6341100000 Mobe-Demobe Asphalt Plant LS<br />
6341200000 Rent & Prepare Plant Site Month<br />
6341300000 Setup Asphalt Plant LS<br />
6342000000 Supply Bunker Fuel t<br />
6343000000 Asphalt Quality Control t<br />
6343100000 Asphalt Mix Testing t<br />
6343200000 Asphalt Smoothness Testing t<br />
6344000000 Sales Taxes t<br />
6344100000 Sales Tax On Asphalt Cement t<br />
6344200000 Sales Tax On Bunker Fuel L<br />
6344300000 Sales Tax On Aggregates t<br />
6344400000 Sales Tax On Mixing t<br />
6345000000 Supply Aggregates t<br />
6345100000 Buy Aggregate t<br />
6345200000 Haul Asphalt Aggregates t<br />
6345300000 Process Aggregates t<br />
6345400000 Stockpile Aggregates t<br />
6346000000 Mix Asphalt t<br />
6347000000 Supply Asphalt Cement t<br />
6347100000 Purchase Asphalt Cement t<br />
6347200000 Deliver Asphalt Cement t<br />
6348000000 Operate Scales t<br />
6348100000 Setup Scales & Inspection LS<br />
6348200000 Operate Scales t<br />
6350000000 Concrete Plant m3<br />
6351000000 Mobilize Concrete Batch Plant m3<br />
6351100000 Move Plant to Site ea<br />
6351200000 Erect Batch Plant ea<br />
6351300000 Erect Weather Protection ea<br />
6351400000 Demobe Batch Plant ea<br />
6351500000 Move Plant off Site ea<br />
6352000000 Batch & Deliver Concrete m3<br />
6352100000 Batch Plant Operation m3<br />
03/01/2009 1:04:57 PM Page No 100 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6352200000 Concrete Aggregate t<br />
6352210000 Primary Crushing t<br />
6352220000 Secondary Crushing t<br />
6352230000 Wash Aggregate t<br />
6352240000 Supply Shotrock t<br />
3920622410 Drill Blast Quarry Rock m3<br />
3920622411 Drill Blast Quarry Rock m<br />
3920622412 Handle Blasting Mats m3<br />
3920622420 Load Rock m3<br />
3920622430 Haul Rock m3<br />
3920622450 Spread at Stockpile m3<br />
6352250000 Supply Pitrun t<br />
3920622510 Load Trucks at Pit m3<br />
3920622520 Haul m3<br />
3920622530 Spread at Stockpile m3<br />
6352300000 Concrete Admixtures m3<br />
6352400000 Supply Water m3<br />
6352500000 Supply Cement & Flyash t<br />
6353000000 Deliver Concrete m3<br />
6354000000 Convey Concrete m3<br />
6360000000 Weigh Scales ea<br />
6361000000 Erect Weigh Scales ea<br />
6362000000 Calibrate Weigh Scales ea<br />
6400 Subsistence LS<br />
6410 Staff Travel & Allowances LS<br />
6411000000 Living Allowance Month<br />
6412000000 Staff Relocation ea<br />
6413000000 Staff Turnarounds ea<br />
6414000000 Tax Allowance Month<br />
6415000000 School Allowance Month<br />
6420 Labour Travel & Allowances LS<br />
6421000000 Travel Allowance MDay<br />
6422000000 Room & Board MDay<br />
6423000000 Airfares ea<br />
6424000000 Relocate Labour ea<br />
6425000000 Key Labour Turnaround ea<br />
6430 Camp Provision LS<br />
6431000000 Mobe Camp LS<br />
6432000000 Prepare Camp Subgrade m2<br />
6433000000 Purchase Camp Person<br />
6434000000 Camp Maintenance Month<br />
6435000000 Camp Management Month<br />
6436000000 Camp Catering Manday<br />
6437000000 Demobe Camp LS<br />
6500 Unallocated Costs LS<br />
6510000000 Unallocated Labour LS<br />
6511000000 Show-Up Time LS<br />
6512000000 Statutory Holidays LS<br />
6513000000 Unscheduled Overtime LS<br />
6514000000 Performance Bonuses LS<br />
6515000000 Shift Premiums LS<br />
6516000000 Recruiting Expense LS<br />
6517000000 Pay Uplift over Scale LS<br />
6518000000 Walking time LS<br />
6520000000 Unallocated Equipment LS<br />
6531000000 Downtime Repairs LS<br />
6532000000 Equipment Downtime Weather LS<br />
6533000000 Buy Sell Adjustment LS<br />
6534000000 Rental Standby LS<br />
6530000000 Unallocated Material LS<br />
6531000000 Unallocated Taxes & Duties LS<br />
6531100000 Unallocated Provincial or State Sales Taxes LS<br />
6531200000 Unallocated Goods & ServiceTaxes LS<br />
6531300000 Unallocated Import Duty LS<br />
6532000000 Unallocated Freight LS<br />
6532100000 Unallocated Truck Freight LS<br />
6532200000 Unallocated Marine Freight LS<br />
03/01/2009 1:04:57 PM Page No 101 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
6532300000 Unallocated Rail Freight LS<br />
6532400000 Unallocated Air Freight LS<br />
6600 Demobilization LS<br />
6610000000 Final Cleanup Expense Month<br />
6611000000 Cleanup and Restore Site Month<br />
6612000000 Restore Non-Pay Roads & Yard Month<br />
6620000000 Teardown Installations Month<br />
6621000000 Dismantle Site Services Month<br />
6622000000 Dismantle Temporary Buildings Month<br />
6630000000 Demobe Equipment ea<br />
6631000000 Dismantle Equipment ea<br />
6632000000 Freight Equipment Off-Site ea<br />
6640000000 Relocate Personel Out ea<br />
6641000000 Relocate Staff Out ea<br />
6642000000 Relocate Hourly Out ea<br />
7000 <strong>Engineering</strong> & Design LS<br />
7100 Site Investigation LS<br />
7110000000 Geotechnical Investigation LS<br />
7120000000 Environmental Studies LS<br />
7130000000 Hydrology Studies LS<br />
7140000000 Initial Site Survey LS<br />
7200 <strong>Engineering</strong> Design LS<br />
7210000000 Preliminary <strong>Engineering</strong> LS<br />
7220000000 Detailed <strong>Engineering</strong> LS<br />
7230000000 Architectural Design LS<br />
7300 Resident <strong>Engineering</strong> LS<br />
7310000000 Resident <strong>Engineering</strong> LS<br />
7400 Project Management LS<br />
7410000000 Site Supervision Month<br />
7411000000 Supervision Month<br />
7411100000 Project Management Month<br />
7411200000 Contract Managers Month<br />
7412000000 <strong>Engineering</strong> Month<br />
7412100000 Project <strong>Engineering</strong> Month<br />
7412200000 Resident <strong>Engineering</strong> Month<br />
7413000000 Office & Clerical Month<br />
7413100000 Office Staff Month<br />
7413200000 IT Staff Month<br />
7414000000 Procurement Month<br />
7414100000 Procurement Staff Month<br />
7414200000 Purchasing & Warehousing Staff Month<br />
7420000000 General Expenses Month<br />
7421000000 Office Supplies Month<br />
7421100000 Office Supplies Month<br />
7421200000 Courier & Postage Month<br />
7421300000 Printing Expense Month<br />
7421400000 Computer Maintenance Month<br />
7421500000 <strong>Engineering</strong> & Drafting Supplies Month<br />
7422000000 Legal & Public Relations Month<br />
7422100000 Legal Fees Month<br />
7422200000 Public Relations Month<br />
7423000000 Medical & Safety Expenses person<br />
7423100000 Medical Exams and Hospital Expenses person<br />
7423200000 First Aid and Medical Supplies person<br />
7423300000 Hardhats & Safety Equipment person<br />
7423400000 Weather Wear person<br />
7423500000 Safety Training Courses person<br />
7423600000 Toolbox Meetings person<br />
7424000000 Consulting Fees Month<br />
7424100000 Claims Consulting Month<br />
7424200000 Labour Relations Month<br />
7425000000 Administration Fees Month<br />
7425100000 Audit Fees Month<br />
7425200000 Bank Charges Month<br />
7430000000 Mobilize Site Facilities LS<br />
7431000000 Install Temporary Site Services LS<br />
03/01/2009 1:04:57 PM Page No 102 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
7431100000 Install Electrical Service Lines m<br />
7431110000 Hydro Service Connection ea<br />
7431120000 Install Temporary Generators ea<br />
7431130000 Install Temporary Lighting ea<br />
7431140000 Transmission & Distribution m<br />
7431200000 Install Phone System person<br />
7431210000 Install Phone System person<br />
7431220000 Install Radio System man<br />
7431300000 Install Water Service Lines m<br />
7431310000 Install Pump ea<br />
7431320000 Install Waterline m<br />
7431400000 Install Sanitary Service Lines m<br />
7431410000 Install Sewer Lines m<br />
7431420000 Install Portable Toilets ea<br />
7431500000 Install Fuel Storage Tanks ea<br />
7431510000 Install Fuel Tanks ea<br />
7431520000 Install Fuel Pumps ea<br />
7432000000 Equipment Mobilization ea<br />
7432100000 Equipment Freight ea<br />
7432110000 Highway Freight ea<br />
7432120000 Rail Freight ea<br />
7432130000 Ocean Freight ea<br />
7432200000 Equipment Erection ea<br />
7432210000 Erect Mobile Equipment ea<br />
7432220000 Erect Stationary Plant ea<br />
7432230000 Erect Tower Cranes ea<br />
7433000000 Non Pay Roads & Yard m2<br />
7433100000 Prepare Yard m2<br />
7433110000 Office Area m2<br />
7433120000 Shop and Warehouse Areas m2<br />
7433130000 Parking Area m2<br />
7433140000 Material Laydown Area m2<br />
7433200000 Hoarding & Fencing m<br />
7433210000 Temporary Hoarding m<br />
7433220000 Temporary Fence m<br />
7433300000 Construct Person Access m2<br />
7433310000 Pedestrian Walkways m2<br />
7434000000 Mobilize Job Buildings ea<br />
7434100000 Transfer Job Buildings ea<br />
7434200000 Erect Job Buildings m2<br />
7434210000 Erect Site Trailers m2<br />
7434220000 Erect Shops m2<br />
7434230000 Erect Warehouse m2<br />
7435000000 Office Furniture & Equipment person<br />
7435100000 Furniture ea<br />
7435110000 Individual Office Furniture ea<br />
7435120000 Other Furniture ea<br />
7435200000 Office Computers ea<br />
7435210000 Servers ea<br />
7435220000 Personnel Computers ea<br />
7435230000 Printers & Plotters ea<br />
7435240000 Networking Equipment ea<br />
7435250000 Software Costs person<br />
7435300000 Office Equipment ea<br />
7435310000 Photocopy Equipment ea<br />
7435320000 Fax Machines ea<br />
7436000000 Signs ea<br />
7436100000 Traffic Signs ea<br />
7436200000 Project Signs ea<br />
7440000000 Site Services Month<br />
7441000000 Utilities & Services Month<br />
7441100000 Utility Consumption Month<br />
7441110000 Power Consumption Month<br />
7441120000 Natural Gas/Propane Consumption Month<br />
7441130000 Water & Sewer Service Month<br />
7441200000 Temporary Services Month<br />
7441210000 Operate Generators & Light Plant Month<br />
7441300000 Communication Expense Month<br />
7441310000 Telephone Charges Month<br />
7441320000 Cell Phone Charges Month<br />
7441330000 Radio Expense Month<br />
03/01/2009 1:04:57 PM Page No 103 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
7441400000 Sanitary Services Month<br />
7441410000 Garbage Removal Month<br />
7441420000 Toilet Service Month<br />
7442000000 Site & Road Maintenance Month<br />
7442100000 Yarding Month<br />
7442200000 Snow Removal Month<br />
7442300000 Dust Control Month<br />
7443000000 Job Buildings & Trailers Month<br />
7443100000 Rent Job Buildings Month<br />
7443110000 Office Buildings Month<br />
7443120000 Field Trailers Month<br />
7443130000 Storage Trailers Month<br />
7443140000 Warehouse Month<br />
7443200000 Maintain Buildings Month<br />
7443210000 Janitorial Services Month<br />
7443220000 Building Maintainance Month<br />
7444000000 Hoisting & Handling Month<br />
7444100000 Hoisting Month<br />
7444110000 Yard Hoisting Month<br />
0148112000 Operate Forklift Month<br />
7444200000 Man Access Month<br />
7444210000 Manlifts Month<br />
7444220000 Crane w/ Man Basket Month<br />
7450000000 Site Survey Month<br />
7451000000 Survey Staff Month<br />
7452000000 Survey Equipment Month<br />
7453000000 Survey Supplies Month<br />
7460000000 Quality Assurance Month<br />
7461000000 Quality Assurance Staff Month<br />
7461100000 Quality Assurance Staff Month<br />
7461200000 Quality Assurance Expenses Month<br />
7462000000 Quality Assurance Plan Month<br />
7462100000 QA Plan Preparation Month<br />
7462200000 ISO Certification Month<br />
7463000000 Site Photos Month<br />
7463100000 Pre-Construction Survey Month<br />
7463200000 Site Photos Month<br />
7464000000 Testing Services Month<br />
7464100000 Concrete Testing m3<br />
7464200000 Aggregate Testing t<br />
7464300000 Compaction Testing m3<br />
7464400000 Pressure Testing Day<br />
7464500000 Welding Testing Day<br />
7465000000 Monitoring Services Month<br />
7465100000 Monitor Blast Vibrations Month<br />
7465200000 Monitor Slope Stability Month<br />
7465300000 Monitor Tunnel Excavations Month<br />
7465400000 Monitor Air Quality ea<br />
7465500000 Monitor Noise Levels ea<br />
7466000000 Environmental Controls Month<br />
7466100000 Environmental Monitor Month<br />
7466200000 Environmental Mitigation Plan LS<br />
7466300000 Hazardous Cleanup t<br />
7470000000 Travel & Subsistence Month<br />
7471000000 Staff Travel & Subsistence Month<br />
7471100000 Hotel & Expenses Month<br />
7471200000 Airfares Month<br />
7471300000 Staff Relocation ea<br />
7472000000 Labour Travel Month<br />
7472100000 Travel Allowance MDay<br />
7472200000 Airfares ea<br />
7480000000 Cleanup & Demobilization LS<br />
7481000000 Final Cleanup Expense Month<br />
7481100000 Cleanup and Restore Site Month<br />
7481200000 Restore Non-Pay Roads & Yard Month<br />
7482000000 Teardown Installations Month<br />
7482100000 Dismantle Site Services Month<br />
7482200000 Dismantle Temporary Buildings Month<br />
7483000000 Demobe Equipment ea<br />
7483100000 Dismantle Equipment ea<br />
7483200000 Freight Equipment Off-Site ea<br />
03/01/2009 1:04:57 PM Page No 104 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
7484000000 Relocate Personel Out ea<br />
7484100000 Relocate Staff Out ea<br />
7484200000 Relocate Hourly Out ea<br />
7500 Development Costs LS<br />
7510 Proposal Development LS<br />
7510000000 Proposal Preparation LS<br />
7520000000 Pre-<strong>Engineering</strong> LS<br />
7530000000 Financial Modeling LS<br />
7600 Development Overhead LS<br />
7610000000 Development Salaries Month<br />
7611000000 Project Management Month<br />
7612000000 <strong>Engineering</strong> Month<br />
7421210000 Project <strong>Engineering</strong> Month<br />
7421220000 <strong>Engineering</strong> Design Coordinators Month<br />
7613000000 Office & Clerical Month<br />
7421310000 Office Staff Month<br />
7421320000 IT Staff Month<br />
7614000000 Procurement Month<br />
7620000000 Development Fees Month<br />
7630000000 General Expenses Month<br />
7631000000 Office Supplies Month<br />
7631100000 Office Supplies MO<br />
7631200000 Courier & Postage MO<br />
7631300000 Printing Expense MO<br />
7631400000 Computer Maintenance MO<br />
7631500000 <strong>Engineering</strong> & Drafting Supplies MO<br />
7632000000 Legal & Public Relations LS<br />
7632100000 Legal Fees LS<br />
7632200000 Public Relations LS<br />
7633000000 Medical & Safety Expenses LS<br />
7633100000 Medical Exams and Hospital Expenses ea<br />
7633200000 First Aid and Medical Supplies MO<br />
7633300000 Hardhats & Safety Equipment ea<br />
7633400000 Weather Wear ea<br />
7633500000 Safety Training Courses ea<br />
7633600000 Toolbox Meetings ea<br />
7633700000 Uniforms ea<br />
7634000000 Land & Property Costs Month<br />
7634100000 Land Rental MO<br />
7634200000 Property Taxes MO<br />
7635000000 Consulting Fees LS<br />
7635100000 Legal Fees LS<br />
7635200000 <strong>Engineering</strong> Consulting LS<br />
7635300000 Labour Relations LS<br />
7636000000 Administration Fees Month<br />
7636100000 Joint Venture Management Fees MO<br />
7636200000 Audit Fees ea<br />
7636300000 Bank Charges MO<br />
7637000000 License Fees & Permits LS<br />
7637100000 Building Permits LS<br />
7637200000 Occupancy Permits LS<br />
7637300000 Land Permits & Easements LS<br />
7637400000 Security Deposits LS<br />
7640000000 Office Facilities Month<br />
7641000000 Land Costs ha<br />
7641100000 Purchase Land ha<br />
7641110000 Puchase Land Onsite HA<br />
7641120000 Puchase Land Offsite HA<br />
7641200000 Rent Land ha<br />
7642000000 Office Furniture & Equipment LS<br />
7642100000 Furniture ea<br />
7642110000 Individual Office Furniture ea<br />
7642120000 Other Furniture ea<br />
7642200000 Office Computers ea<br />
7642210000 Servers ea<br />
7642220000 Personnel Computers ea<br />
7642230000 Printers & Plotters ea<br />
7642240000 Networking Equipment LS<br />
7642250000 Software Costs ea<br />
03/01/2009 1:04:57 PM Page No 105 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
7642300000 Office Equipment ea<br />
7642310000 Photocopy Equipment ea<br />
7642320000 Fax Machines ea<br />
7650000000 Office Services Month<br />
7651000000 Utilities & Services Month<br />
7652000000 Building Lease or Rentals Month<br />
7653000000 Vehicles Month<br />
7660000000 Public Relations Month<br />
7661000000 Public Relations Expenses Month<br />
7662000000 Charitable Donations Month<br />
7670000000 Travel & Subsistence Month<br />
7671000000 Hotel & Expenses Month<br />
7672000000 Airfares ea<br />
7673000000 Living Allowance Month<br />
7674000000 Meal Allowance MDay<br />
7675000000 Staff Relocation ea<br />
7676000000 Staff Turnarounds ea<br />
7677000000 Tax Allowance Month<br />
7700 Financial Close LS<br />
7710000000 Legal Due Diligence LS<br />
7720000000 Financial Due Diligence LS<br />
7730000000 Success Fees LS<br />
8000 Operations & Maintenance LS<br />
8100 Operations Costs LS<br />
8110 Staff Salaries LS<br />
811100000 Management Month<br />
811200000 Supervisors Month<br />
811300000 System Controllers Month<br />
811400000 Fare Collectors Month<br />
811500000 Vehicle Operators Month<br />
8120 Overhead LS<br />
812100000 Advertising Expense Month<br />
812200000 General Expenses Month<br />
812210000 Office Supplies MO<br />
812211000 Office Supplies MO<br />
812212000 Courier & Postage MO<br />
812213000 Printing Expense MO<br />
812214000 Computer Maintenance MO<br />
812215000 <strong>Engineering</strong> & Drafting Supplies MO<br />
812220000 Legal & Public Relations LS<br />
812221000 Legal Fees LS<br />
812222000 Public Relations LS<br />
812230000 Medical & Safety Expenses LS<br />
812231000 Medical Exams and Hospital Expenses ea<br />
812232000 First Aid and Medical Supplies MO<br />
812233000 Hardhats & Safety Equipment ea<br />
812234000 Weather Wear ea<br />
812235000 Safety Training Courses ea<br />
812236000 Toolbox Meetings ea<br />
812237000 Uniforms ea<br />
812240000 Land & Property Costs MO<br />
812241000 Land Rental MO<br />
812242000 Property Taxes MO<br />
812250000 Consulting Fees LS<br />
812251000 Legal Fees LS<br />
812252000 <strong>Engineering</strong> Consulting LS<br />
812253000 Labour Relations LS<br />
812260000 Administration Fees MO<br />
812261000 Joint Venture Management Fees MO<br />
812262000 Audit Fees ea<br />
812263000 Bank Charges MO<br />
812270000 License Fees & Permits LS<br />
812271000 Building Permits LS<br />
812272000 Occupancy Permits LS<br />
812273000 Land Permits & Easements LS<br />
812274000 Security Deposits LS<br />
812300000 Mobilize Site Facilities LS<br />
812310000 Equipment Mobilization LS<br />
03/01/2009 1:04:57 PM Page No 106 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
812311000 Equipment Freight ea<br />
812311100 Highway Freight ea<br />
812311200 Rail Freight ea<br />
812311300 Ocean Freight ea<br />
812311400 Airfreight ea<br />
812312000 Equipment Erection ea<br />
812312100 Erect Mobile Equipment ea<br />
812312200 Erect Stationary Plant ea<br />
812320000 Land Costs ha<br />
812321000 Purchase Land ha<br />
812321100 Puchase Land Onsite ha<br />
812321200 Puchase Land Offsite ha<br />
812322000 Rent Land ha<br />
812330000 Office Furniture & Equipment LS<br />
812331000 Furniture ea<br />
812331100 Individual Office Furniture ea<br />
812331200 Other Furniture ea<br />
812332000 Office Computers ea<br />
812332100 Servers ea<br />
812332200 Personnel Computers ea<br />
812332300 Printers & Plotters ea<br />
812332400 Networking Equipment LS<br />
812332500 Software Costs ea<br />
812333000 Office Equipment ea<br />
812333100 Photocopy Equipment ea<br />
812333200 Fax Machines ea<br />
812400000 Site Services Month<br />
812410000 Utilities & Services MO<br />
812411000 Utility Consumption MO<br />
812411100 Power Consumption MO<br />
812411200 Natural Gas/Propane Consumption MO<br />
812411300 Water & Sewer Service MO<br />
812412000 Backup Services MO<br />
812412100 Operate Generators & Light Plant MO<br />
812412200 Operate Compressors MO<br />
812412300 Operate Pumps MO<br />
812413000 Communication Expense MO<br />
812413100 Telephone Charges MO<br />
812413200 Cell Phone Charges MO<br />
812413300 Radio Expense MO<br />
812414000 Sanitary Services MO<br />
812414100 Garbage Removal MO<br />
812414200 Toilet Service MO<br />
812420000 Yard Maintenance MO<br />
812421000 Maintain Parking m2<br />
812422000 Yarding MO<br />
812423000 Snow Removal MO<br />
812424000 Dust Control MO<br />
812425000 Street Cleaning MO<br />
812430000 Building Lease or Rentals MO<br />
812431000 Rent or Lease Office Space MO<br />
812431100 Office Space MO<br />
812431200 Shop Space MO<br />
812431300 Lunch Rooms MO<br />
812431400 Storage Trailers MO<br />
812431500 Warehouse MO<br />
812432000 Maintain Buildings MO<br />
812432100 Janitorial Services MO<br />
812432200 Building Maintainance MO<br />
812440000 Overhead Transport & Equipment MO<br />
812441000 Unallocated Pickups & Cars MO<br />
812442000 Float Equipment Onsite MO<br />
812443000 Operate Forklift MO<br />
812444000 Operate Personnel Van MO<br />
812445000 Parts Truck Operation MO<br />
812446000 Warehousing MO<br />
812450000 Traffic Control MO<br />
812451000 Flagmen MO<br />
812452000 Maintain Signs MO<br />
812453000 Relocate Precast Barriers m<br />
812454000 Relocate Barrels & Barricages MO<br />
03/01/2009 1:04:57 PM Page No 107 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
812455000 Hired Police MO<br />
812460000 Security MO<br />
812461000 Security Services MO<br />
812462000 Security Guardhouse MO<br />
812500000 Public Relations Month<br />
812510000 Public Relations Expenses MO<br />
812520000 Charitable Donations MO<br />
812600000 Quality Control Month<br />
812610000 Quality Control Plan LS<br />
812611000 QC Plan Preparation LS<br />
812612000 ISO Certification LS<br />
812620000 Inspection Services MO<br />
812621000 Facility Survey LS<br />
812622000 Operation Photos MO<br />
812623000 Inspection Services MO<br />
812630000 Quality Certification MO<br />
812640000 Testing Services MO<br />
812641000 Material Testing m3<br />
812642000 Welding Testing LS<br />
812643000 EquipmentTesting t<br />
812650000 Cleaning Services m<br />
812660000 Monitoring Services MO<br />
812661000 Monitor Vibrations MO<br />
812662000 Monitor Slope Stability MO<br />
812663000 Monitor Tunnel Excavations MO<br />
812664000 Monitor Air Quality MO<br />
812665000 Monitor Noise Levels MO<br />
812670000 Environmental Controls MO<br />
812671000 Environmental Monitor LS<br />
812672000 Environmental Mitigation Plan LS<br />
812673000 Erosion Control MO<br />
812674000 Settlement Ponds LS<br />
812675000 Hazardous Cleanup LS<br />
812700000 Travel & Subsistence Month<br />
812710000 Staff Travel & Subsistence MO<br />
812711000 Hotel & Expenses MO<br />
812712000 Airfares ea<br />
812713000 Living Allowance MO<br />
812714000 Meal Allowance MDay<br />
812715000 Staff Relocation ea<br />
812716000 Staff Turnarounds ea<br />
812717000 Tax Allowance MO<br />
812720000 Labour Travel & Subsistence MO<br />
812721000 Travel Allowance MDay<br />
812722000 Airfares ea<br />
812723000 Subsistence MDay<br />
812724000 Meal Allowance MDay<br />
812725000 Relocate Labour ea<br />
812726000 Key Hourly Turnaround ea<br />
812800000 Municipal Taxes Month<br />
8130 Energy month<br />
813100000 Power Consumption Month<br />
813200000 Fuel Consumption Month<br />
813300000 Gas Consumption Month<br />
8140 Consumables month<br />
814100000 Tickets ea<br />
814200000 Processing Raw Material t<br />
8200 Maintenance Costs LS<br />
8210 Equipment Maintenanance LS<br />
8211 Fare Collection Maintenance LS<br />
821110000 Electronic Tolling Maintenance Month<br />
821120000 Ticketing Equipment Maintenance Month<br />
8212 Rolling Stock Maintenance LS<br />
821210000 Preventive Maintenance vehicle-km<br />
821211000 Repair Labour vehicle-km<br />
821212000 Oil & Consumables vehicle-km<br />
821213000 Wear Parts Consumption vehicle-km<br />
03/01/2009 1:04:57 PM Page No 108 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
821220000 Corrective Maintenance vehicle-km<br />
821221000 Repair Labour vehicle-km<br />
821222000 Parts vehicle-km<br />
821230000 Major Overhaul Costs vehicle-km<br />
821231000 Repair Labour vehicle-km<br />
821232000 Major Components vehicle-km<br />
8213 Service Vehicle Maintenance LS<br />
821310000 Repair Labour vehicle-km<br />
821320000 Oil & Consumables vehicle-km<br />
821330000 Wear Parts Consumption vehicle-km<br />
8214 Process Equipment Maintenance LS<br />
821410000 Process Piping Mintenance LS<br />
821420000 Material Processing Maintenance LS<br />
821430000 Process Heating Cooling & Drying Maintenance LS<br />
821440000 Process Gas Liquid Handling, Purification & Storage MaintenanLS<br />
821450000 Pollution Control Equipment Maintenance LS<br />
821460000 Industry Specific Manufacturing Equipment Maintenance LS<br />
821470000 Power Generation Equipment Maintenance LS<br />
8220 Facility Maintenance m2<br />
822100000 Building Maintenance Month<br />
822200000 Mechanical Maintenance Month<br />
822300000 Electrical Maintenance Month<br />
8230 Road & Sitework Maintenance m2<br />
823100000 Dewatering Month<br />
823200000 Monitor Embankments Month<br />
823300000 Erosion Control Month<br />
823400000 Slope Maintenance Month<br />
823500000 Structural Maintenance Month<br />
823600000 Tunnel Maintenance Month<br />
823700000 Pavement Maintenance Month<br />
823800000 Landscape Maintenance Month<br />
823900000 Sewer Maintenance Month<br />
8240 Infrastructure Maintenance LS<br />
824100000 Track Maintenance Month<br />
824200000 Airfield Equipment Maintenance Month<br />
824300000 Marine & Waterway Maintenance Month<br />
824400000 Powerhouse & Dam Maintenance Month<br />
8300 Transfer Costs LS<br />
8310 Demobilization LS<br />
831100000 Cleanup & Demobilization LS<br />
831200000 Transfer Staff Month<br />
831300000 Overhead Month<br />
8320 Legal & Audit LS<br />
832100000 Legal Fees LS<br />
832200000 Audit Fees LS<br />
9000 Project Margin LS<br />
9100 Contingency LS<br />
9110 Contingency Risk LS<br />
9111000000 Design Growth LS<br />
9112000000 Client Risk LS<br />
9111000000 Interference Risk LS<br />
9112000000 Payment Risk LS<br />
9113000000 Performance Risk LS<br />
9121000000 Quality Control Compliance LS<br />
9122000000 Quality Bonuses LS<br />
9114000000 Geotechnical Risk LS<br />
9115000000 Procurement Risk LS<br />
9116000000 Labour Risk LS<br />
9117000000 Schedule Risk LS<br />
9161000000 Liquidated Damages LS<br />
9162000000 Overhead Impact month<br />
9163000000 Traffic Delay Penalties LS<br />
9164000000 Completion Bonuses LS<br />
03/01/2009 1:04:57 PM Page No 109 of 110
<strong>WBS</strong> Code<br />
<strong>Master</strong> <strong>Work</strong> <strong>Breakdown</strong> <strong>Structure</strong> (<strong>WBS</strong>)<br />
Description Unit<br />
9118000000 Weather Risk LS<br />
9119000000 Political Risk LS<br />
9120 Liguidated Damages LS<br />
9121000000 Liquidated Damages LS<br />
9130 Penalties & Bonuses LS<br />
9131000000 Performance Penalties LS<br />
9132000000 Performance Bonuses LS<br />
9133000000 Salary Bonuses LS<br />
9200 Escalation LS<br />
9210000000 Labour Escalation LS<br />
9220000000 Equipment Escalation LS<br />
9230000000 Job Material Escalation LS<br />
9240000000 Permanent Material Escalation LS<br />
9250000000 Subcontract Escalation LS<br />
9260000000 Escalation <strong>Engineering</strong> & Design LS<br />
9300 Guarantees LS<br />
9310000000 Bonding LS<br />
9311000000 Bond-To Owner LS<br />
9312000000 Bond-From Subs LS<br />
9320000000 Guarantees LS<br />
9321000000 Bank Guarantees LS<br />
9322000000 Letters of Credit LS<br />
9400 Insurance LS<br />
9410000000 Insurance Fees LS<br />
9420000000 Insurance Deductables LS<br />
9500 Overhead LS<br />
9510000000 Financing LS<br />
9520000000 Management Fees LS<br />
9530000000 Head Office Allocation Month<br />
9600 Profit LS<br />
9610000000 Profit LS<br />
03/01/2009 1:04:57 PM Page No 110 of 110