WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE - InfoMine
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE - InfoMine
WORK BREAKDOWN STRUCTURE FOR A TYPICAL MINE - InfoMine
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>WORK</strong> <strong>BREAKDOWN</strong> <strong>STRUCTURE</strong><br />
<strong>FOR</strong> A <strong>TYPICAL</strong> <strong>MINE</strong><br />
LEGEND<br />
[GeoMine] = Technology Sites<br />
[Exploration-Geology-Reserves] = Edumine Courses<br />
[GEOCHEMISTRY] = State-of-the-Art Review (SOAR)
1 EXPLORATION<br />
1.1 Claim Staking<br />
1.2 Land Title<br />
1.3 Drilling & Sampling<br />
1.3.1 Permits<br />
1.3.2 Health & Safety<br />
1.3.3 Quality<br />
1.3.4 Access<br />
1.3.5 Accommodation<br />
1.3.6 Supplies<br />
1.3.7 Drilling<br />
1.3.8 Sampling<br />
1.3.9 Reporting<br />
1.4 Testing<br />
1.5 Geology<br />
[GEO<strong>MINE</strong>]<br />
[EXPLORATION-GEOLOGY-<br />
RESERVES]<br />
1.6 Geochemistry [GEOCHEMISTRY]<br />
2 ENVIRONMENTAL<br />
2.1 Site Characterization<br />
[ENVIRO<strong>MINE</strong>]<br />
[ENVIRONMENT –HEALTH-<br />
SAFETY]
2.1.1 Topography<br />
2.1.2 Climate<br />
2.1.2.1 Temperature<br />
2.1.2.2 Wind<br />
2.1.2.3 Air Quality<br />
2.1.2.4 Precipitation<br />
2.1.3 Soil & Rock<br />
2.1.3.1 Geology<br />
2.1.3.2 Soils<br />
2.1.3.3 Geochemistry [GEOCHEMISTRY]<br />
2.1.4 Flora<br />
2.1.5 Fauna<br />
2.1.6 Water<br />
2.1.6.1 Surface Water<br />
2.1.6.2 Groundwater<br />
2.1.6.3 Marine Waters<br />
2.2 Data Management [GPS] [GIS]<br />
2.2.1 Surveying<br />
2.2.2 GIS<br />
2.2.3 CADD<br />
[DIGITAL MAPPING]
2.3 Reporting<br />
2.3.1 Environmental Impact Assessment<br />
2.3.2 Regulatory Interaction<br />
2.3.3 Community Relations<br />
2.3.4 Permits<br />
3 ENGINEERING & TECHNICAL<br />
[GEOTECH<strong>MINE</strong> & HYDRO<strong>MINE</strong>]<br />
[Geotechnics-Rock Mechanics]
3.1 Surveying [GPS] [GIS]<br />
[DIGITAL MAPPING]<br />
3.2 Geotechnical [GeotechMine]<br />
3.3 Geologic [GeoMine]<br />
3.4 Site Water Balance [HydroMine]<br />
[WATER BALANCE]<br />
3.5 Groundwater [HydroMine]<br />
3.6 Surface Water [HydroMine]<br />
3.7 Geochemistry [GEOCHEMISTRY]<br />
3.8 Biological<br />
3.9 Vegetation<br />
3.10 Data Management<br />
3.10.1 GPS [GPS]<br />
3.10.2 GIS [GIS]<br />
3.10.3 CADD<br />
4 FACILITIES [TAILINGS<strong>MINE</strong>]<br />
4.1 Tailings [TAILINGS]<br />
4.1.1 Site Selection<br />
4.1.1.1 Alternative Site Identification<br />
4.1.1.2 Site Comparison<br />
4.1.1.3 Site Assessment<br />
4.1.1.4 Report Preparation
4.1.2 Site Characterization<br />
4.1.3 Design<br />
4.1.3.1 Layout [EROSION]<br />
4.1.3.2 Foundations<br />
4.1.3.3 Liner [FACILITY LINERS<br />
4.1.3.4 Embankments<br />
4.1.3.5 Surface Water Management Facilities<br />
4.1.3.6 Supply & Discharge Lines<br />
4.1.3.7 Placement Procedures<br />
4.1.3.8 Cover [COVERS] [EROSION]<br />
4.1.3.9 Monitoring & Instrumentation<br />
4.1.3.10 Closure Works [DESIGN <strong>FOR</strong> CLOSURE]<br />
4.1.3.11 Design Documentation<br />
4.1.3.11.1 Report<br />
4.1.3.11.2 Drawings<br />
4.1.3.11.3 Calculations<br />
4.1.3.11.4 Cost Estimates
4.1.4 Construction<br />
4.1.5 Operation<br />
4.1.6 Closure<br />
4.1.7 Post-Closure Surveillance and Maintenance<br />
4.2 Waste Rock [ROCK WASTE]<br />
4.2.1 Site Selection<br />
4.2.1.1 Alternative Site Identification<br />
4.2.1.2 Site Comparison<br />
4.2.1.3 Site Assessment<br />
4.2.1.4 Report Preparation<br />
4.2.2 Site Characterization<br />
4.2.3 Design<br />
4.2.3.1 Layout [EROSION]<br />
4.2.3.2 Foundations<br />
4.2.3.3 Liner [FACILITY LINERS<br />
4.2.3.4 Embankments<br />
4.2.3.5 Surface Water Management Facilities<br />
4.2.3.6 Supply & Discharge Lines<br />
4.2.3.7 Placement Procedures<br />
4.2.3.8 Cover [COVERS] [EROSION]<br />
4.2.3.9 Monitoring & Instrumentation<br />
4.2.3.10 Closure Works [DESIGN <strong>FOR</strong> CLOSURE]<br />
4.2.3.11 Design Documentation<br />
4.2.3.11.1 Report<br />
4.2.3.11.2 Drawings<br />
4.2.3.11.3 Calculations<br />
4.2.3.11.4 Cost Estimates
4.2.4 Construction<br />
4.2.5 Operation<br />
4.2.6 Closure<br />
4.2.7 Post-Closure Surveillance and Maintenance<br />
4.3 Heap Leach<br />
4.3.1 Site Selection<br />
4.3.1.1 Alternative Site Identification<br />
4.3.1.2 Site Comparison<br />
4.3.1.3 Site Assessment<br />
4.3.1.4 Report Preparation<br />
4.3.2 Site Characterization<br />
4.3.3 Design<br />
4.3.3.1 Layout [EROSION]<br />
4.3.3.2 Foundations<br />
4.3.3.3 Liner [FACILITY LINERS<br />
4.3.3.4 Embankments<br />
4.3.3.5 Surface Water Management Facilities<br />
4.3.3.6 Supply & Discharge Lines<br />
4.3.3.7 Placement Procedures<br />
4.3.3.8 Cover [COVERS] [EROSION]<br />
4.3.3.9 Monitoring & Instrumentation<br />
4.3.3.10 Closure Works [DESIGN <strong>FOR</strong> CLOSURE]<br />
4.3.3.11 Design Documentation<br />
4.3.3.11.1 Report<br />
4.3.3.11.2 Drawings<br />
4.3.3.11.3 Calculations<br />
4.3.3.11.4 Cost Estimates
4.3.4 Construction<br />
4.3.5 Operation<br />
4.3.6 Closure<br />
4.3.7 Post-Closure Surveillance and Maintenance<br />
4.4 Dams<br />
4.4.1 Sediment Ponds [SEDIMENT PONDS]<br />
4.4.2 Water Retention Dams<br />
4.5 Access Facilities<br />
4.5.1 Roads [<strong>MINE</strong> ROADS]<br />
4.5.2 Bridges<br />
4.5.3 Air Strips<br />
4.6 Power Facilities<br />
4.6.1 Power Lines<br />
4.6.2 Generators<br />
4.7 Domestic Water<br />
4.7.1 Water Supply Systems<br />
4.7.2 Waste Water<br />
4.8 Buildings<br />
4.8.1 Accommodation Facilities<br />
4.8.2 Offices<br />
4.8.3 Plant Structures<br />
4.8.4 Security Structures<br />
4.8.5 Communications Facilities
5 MINING<br />
[Mining Methods—Mine<br />
Planning]<br />
5.1 Surface Mine [OpenPitMine]<br />
5.1.1 Pit Layout & Design<br />
5.1.2 Slope Stability [ROCK SLOPE STABILITY<br />
5.1.3 Roads [<strong>MINE</strong> ROADS]<br />
5.1.4 Equipment<br />
5.1.4.1 Trucks<br />
5.1.4.2 Loaders<br />
5.1.4.3 Conveyors<br />
5.1.5 Overburden Removal<br />
5.1.5.1 Drilling<br />
5.1.5.2 Blasting [BLASTING]<br />
5.1.5.3 Loading<br />
5.1.5.4 Transport<br />
5.1.5.5 Disposal<br />
5.1.6 Ore Removal
5.2 Underground Mine [UndergroundMine]<br />
5.2.1 Shafts<br />
5.2.2 Portals<br />
5.2.3 Ventilation<br />
5.2.4 Drilling<br />
5.2.5 Blasting [BLASTING]<br />
5.2.6 Rock Support [SUBSIDENCE]<br />
5.2.7 Waste Removal<br />
5.2.8 Ore Removal<br />
6 PROCESSING<br />
[MET<strong>MINE</strong>]<br />
[Mineralogy—Mineral<br />
Processing]
6.1 Crushing<br />
6.2 Grinding<br />
6.3 Flotation<br />
6.4 Metallurgical<br />
6.5 Chemical [CYANIDE]<br />
6.6 Concentration<br />
6.7 Pyrometallurgical<br />
6.8 Bio-metallurgical [BIOTECHNOLOGY]<br />
7 PEOPLE [PEOPLE<strong>MINE</strong>]<br />
7.1 Human Resources [MINING CAREERS]<br />
7.2 Health and Safety [HEALTH & SAFETY]<br />
7.3 Emergency Response [EMERGENCY RESPONSE]<br />
7.4 Community Relations [RESPONSIBLE MINING]<br />
7.4.1 Press Relations<br />
7.4.2 Community Outreach [COMMUNITY RELATIONS]<br />
7.4.3 Community Education<br />
7.4.4 Visitor Facilities<br />
7.4.5 Charity<br />
7.5 Continuing Education<br />
7.5.1 On-Line Learning<br />
7.5.2 Academic Attendance<br />
7.5.3 Conferences
8 MANAGEMENT<br />
[LAW<strong>MINE</strong>]<br />
[Management-Risk-Financial]<br />
8.1 Management [DECISION MAKING]<br />
8.2 Cost & Schedule [<strong>MINE</strong> COSTS]<br />
[PROJECT MANAGEMENT]<br />
8.3 Accounting [VALUATION]<br />
8.4 Legal [LAW]<br />
8.5 Procurement<br />
8.6 Sales<br />
8.7 Quality [QUALITY]<br />
8.8 Security