You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />
<strong>WBS</strong> <strong>Worksheet</strong><br />
Project Name: MONSTER MASH – Page 1<br />
Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />
List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />
the tasks that need to be done to produce that portion of the Project Deliverable.<br />
Use multiple worksheet pages as needed.<br />
Sub-<br />
Deliverables<br />
A: Coding<br />
schemes<br />
B: Job ads<br />
Major Tasks<br />
1. Establish coding<br />
schemes for job<br />
requirements<br />
2. Assess semantic<br />
validity of the 4 coding<br />
schemes<br />
1. Determine best way to<br />
“save” the job ads<br />
2. Perform search for<br />
Application Developer and<br />
save ads<br />
3. Perform search for<br />
Systems Analyst and save<br />
ads<br />
4. Cleanse the collection<br />
of job ads<br />
Subtasks<br />
1. Establish scheme for<br />
Technical reqs<br />
2. Establish scheme for<br />
Business reqs<br />
3. Establish scheme for<br />
Systems reqs<br />
4. Establish scheme for<br />
Interpersonal reqs<br />
1. Get feedback from 2<br />
knowledgeable others on<br />
all 4 coding schemes<br />
2. Make necessary<br />
adjustments to the coding<br />
schemes<br />
1. Identify duplicate ads<br />
that came up in both AD<br />
and SA searches<br />
2. For each duplicate ad,<br />
decide to classify as AD,<br />
classify as SA, or neither<br />
3. Identify ads that do not<br />
seem to be IS/IT and drop<br />
them from the sample<br />
Duration<br />
2 days<br />
2 days<br />
2 days<br />
2 days<br />
4 days A.1<br />
1 day A.2.1<br />
1 day<br />
1 day B.1<br />
1 day B.1<br />
2 days B.2,<br />
B.3<br />
1 day B.4.1<br />
1 day B.2,<br />
B.3<br />
Predecessors
SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />
<strong>WBS</strong> <strong>Worksheet</strong><br />
Project Name: MONSTER MASH – Page 2<br />
Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />
List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />
the tasks that need to be done to produce that portion of the Project Deliverable.<br />
Use multiple worksheet pages as needed.<br />
Sub-<br />
Deliverables<br />
C: Job ads<br />
coded<br />
D: File of<br />
coding results<br />
Major Tasks<br />
1. Code ads for years of<br />
experience<br />
2. Code each ad for<br />
Technical reqs<br />
3. Code each ad for<br />
Business reqs<br />
4. Code each ad for<br />
Systems reqs<br />
5. Code each ad for<br />
Interpersonal reqs<br />
1. Design file to hold<br />
coding results<br />
2. Create the file to hold<br />
coding results<br />
Subtasks<br />
1. Code as YES/NO on<br />
whether ad requires job<br />
experience<br />
2. If YES, code number of<br />
years required<br />
1. Investigate options of<br />
file type (Access, Excel, ?)<br />
and decide type to use<br />
2. Identify all data items<br />
we will need to store (i.e.,<br />
what will a row/record<br />
look like?)<br />
Duration Predecessors<br />
1 day A,<br />
B<br />
1 day C.1.1<br />
2 days A,<br />
B<br />
2 days A,<br />
B<br />
2 days A,<br />
B<br />
2 days A,<br />
B<br />
2 days<br />
2 days<br />
1 days D.1<br />
3. Enter coding results 3 days D.2,<br />
C
SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />
<strong>WBS</strong> <strong>Worksheet</strong><br />
Project Name: MONSTER MASH – Page 3<br />
Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />
List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />
the tasks that need to be done to produce that portion of the Project Deliverable.<br />
Use multiple worksheet pages as needed.<br />
Sub-<br />
Deliverables<br />
E: Analysis<br />
and conclusions<br />
F: Completed<br />
report<br />
Major Tasks<br />
1. Do data analysis<br />
regarding RQ1<br />
2. Do data analysis<br />
regarding RQ2<br />
3. Determine conclusions<br />
drawn from data analyses<br />
1. Write the front-end of<br />
report (motivation for<br />
study, the RQs, what we<br />
did and how we did it)<br />
2. Write the rest of the<br />
report (results of data<br />
analyses, conclusions<br />
regarding RQ1 and RQ2)<br />
3. Submit full report to<br />
project team mbrs<br />
4. Team mbrs review<br />
report and submit<br />
suggestions for<br />
improvement<br />
5. Make improvements to<br />
report<br />
3. Submit full report to<br />
client<br />
Subtasks<br />
Duration Predecessors<br />
2 days D<br />
2 days D<br />
2 days E.1,<br />
E.2<br />
4 days A,<br />
B<br />
4 days E<br />
1 day F.1,<br />
F.2<br />
2 days F.3<br />
2 days F.4<br />
1 day F.5