17.01.2013 Views

Example: WBS Worksheet

Example: WBS Worksheet

Example: WBS Worksheet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />

<strong>WBS</strong> <strong>Worksheet</strong><br />

Project Name: MONSTER MASH – Page 1<br />

Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />

List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />

the tasks that need to be done to produce that portion of the Project Deliverable.<br />

Use multiple worksheet pages as needed.<br />

Sub-<br />

Deliverables<br />

A: Coding<br />

schemes<br />

B: Job ads<br />

Major Tasks<br />

1. Establish coding<br />

schemes for job<br />

requirements<br />

2. Assess semantic<br />

validity of the 4 coding<br />

schemes<br />

1. Determine best way to<br />

“save” the job ads<br />

2. Perform search for<br />

Application Developer and<br />

save ads<br />

3. Perform search for<br />

Systems Analyst and save<br />

ads<br />

4. Cleanse the collection<br />

of job ads<br />

Subtasks<br />

1. Establish scheme for<br />

Technical reqs<br />

2. Establish scheme for<br />

Business reqs<br />

3. Establish scheme for<br />

Systems reqs<br />

4. Establish scheme for<br />

Interpersonal reqs<br />

1. Get feedback from 2<br />

knowledgeable others on<br />

all 4 coding schemes<br />

2. Make necessary<br />

adjustments to the coding<br />

schemes<br />

1. Identify duplicate ads<br />

that came up in both AD<br />

and SA searches<br />

2. For each duplicate ad,<br />

decide to classify as AD,<br />

classify as SA, or neither<br />

3. Identify ads that do not<br />

seem to be IS/IT and drop<br />

them from the sample<br />

Duration<br />

2 days<br />

2 days<br />

2 days<br />

2 days<br />

4 days A.1<br />

1 day A.2.1<br />

1 day<br />

1 day B.1<br />

1 day B.1<br />

2 days B.2,<br />

B.3<br />

1 day B.4.1<br />

1 day B.2,<br />

B.3<br />

Predecessors


SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />

<strong>WBS</strong> <strong>Worksheet</strong><br />

Project Name: MONSTER MASH – Page 2<br />

Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />

List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />

the tasks that need to be done to produce that portion of the Project Deliverable.<br />

Use multiple worksheet pages as needed.<br />

Sub-<br />

Deliverables<br />

C: Job ads<br />

coded<br />

D: File of<br />

coding results<br />

Major Tasks<br />

1. Code ads for years of<br />

experience<br />

2. Code each ad for<br />

Technical reqs<br />

3. Code each ad for<br />

Business reqs<br />

4. Code each ad for<br />

Systems reqs<br />

5. Code each ad for<br />

Interpersonal reqs<br />

1. Design file to hold<br />

coding results<br />

2. Create the file to hold<br />

coding results<br />

Subtasks<br />

1. Code as YES/NO on<br />

whether ad requires job<br />

experience<br />

2. If YES, code number of<br />

years required<br />

1. Investigate options of<br />

file type (Access, Excel, ?)<br />

and decide type to use<br />

2. Identify all data items<br />

we will need to store (i.e.,<br />

what will a row/record<br />

look like?)<br />

Duration Predecessors<br />

1 day A,<br />

B<br />

1 day C.1.1<br />

2 days A,<br />

B<br />

2 days A,<br />

B<br />

2 days A,<br />

B<br />

2 days A,<br />

B<br />

2 days<br />

2 days<br />

1 days D.1<br />

3. Enter coding results 3 days D.2,<br />

C


SIUE Project Support Center Sample <strong>WBS</strong>: Monster Mash Project<br />

<strong>WBS</strong> <strong>Worksheet</strong><br />

Project Name: MONSTER MASH – Page 3<br />

Using the Scope Statement as a starting point, break the final Project Deliverable into Sub-Deliverables.<br />

List each Sub-Deliverable in the first column, then work left-to-right for each Sub-Deliverable to identify<br />

the tasks that need to be done to produce that portion of the Project Deliverable.<br />

Use multiple worksheet pages as needed.<br />

Sub-<br />

Deliverables<br />

E: Analysis<br />

and conclusions<br />

F: Completed<br />

report<br />

Major Tasks<br />

1. Do data analysis<br />

regarding RQ1<br />

2. Do data analysis<br />

regarding RQ2<br />

3. Determine conclusions<br />

drawn from data analyses<br />

1. Write the front-end of<br />

report (motivation for<br />

study, the RQs, what we<br />

did and how we did it)<br />

2. Write the rest of the<br />

report (results of data<br />

analyses, conclusions<br />

regarding RQ1 and RQ2)<br />

3. Submit full report to<br />

project team mbrs<br />

4. Team mbrs review<br />

report and submit<br />

suggestions for<br />

improvement<br />

5. Make improvements to<br />

report<br />

3. Submit full report to<br />

client<br />

Subtasks<br />

Duration Predecessors<br />

2 days D<br />

2 days D<br />

2 days E.1,<br />

E.2<br />

4 days A,<br />

B<br />

4 days E<br />

1 day F.1,<br />

F.2<br />

2 days F.3<br />

2 days F.4<br />

1 day F.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!