2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
Delete from <strong>STIP</strong><br />
FHWA 7 88752 D07 TSG LOOP FY 14/15 D07<br />
Repair, Install, or Upgrade signals, Overhead flashers, school<br />
flashers and loop detectors.<br />
Districtwide ODOT SPONSORING AGENCY CO CO Contr 275,000.00 $0 $302,500 $0 $303,500 2014 4CP7 State Signals 002 State Funds (S,O) Delete 1945<br />
FHWA 7 88752 CO CO Engr 27,500.00 $0 $302,500 $0 $303,500 2014 LABR State Signals 002 State Funds (S,O) 1945<br />
FHWA 7 84095 MOT HOKE ROAD PH. 2 MOT<br />
WIDEN HOKE ROAD TO A 3 LANE SECTION (ADD DOUBLE LEFT<br />
TURN LANE) WITH LANDSCAPED BOULEVARD,<br />
ON HOKE ROAD FROM SMITH ROAD TO<br />
CONSTRUCT/REPLACE CURB AND GUTTER, REPLACE AND<br />
INTERSECTION OF US 40 (NATIONAL Clayton, City <strong>of</strong><br />
RECONSTRUCT PORTIONS OF THE STORM SEWER SYSTEM, MILL<br />
ROAD).<br />
AND RESURFACE THE ROADWAY. Also, replace the existing<br />
single sp<br />
MVRPC CO CO Contr 2,812,420.00 $0 $3,867,077 $0 $3,868,077 2014 4TA7 Federal Widening L230 URBANIZED AREAS 1 Delete 2068<br />
FHWA 7 84095 CO CO Contr 703,105.00 $0 $3,867,077 $0 $3,868,077 2014 4BG7 Local Match Widening 002 Local Match 1 2068<br />
FHWA 7 84095 CO CO Engr 281,241.60 $0 $3,867,077 $0 $3,868,077 2014 LABR Federal Widening L230 URBANIZED AREAS 1 2068<br />
FHWA 7 84095 CO CO Engr 70,310.40 $0 $3,867,077 $0 $3,868,077 2014 LABR Local Match Widening 002 Local Match 1 2068<br />
FHWA 8 82558 CLE Tina Drive Extension CLE<br />
Reconstruction <strong>of</strong> the I-275/SR32 Interchange requires closing<br />
the existing intersection <strong>of</strong> SR32 and Old SR74. Extension <strong>of</strong><br />
Tina Dr. is desired to provide access to the surrounding Bells Lane to Old SR74<br />
residential neighborhoods. The connection will be made before<br />
access is c<br />
Clermont County<br />
Commissioners<br />
OKI CO CO Contr 1,400,000.00 $0 $2,070,000 $0 $2,070,000 2013 4TA7 Federal New Construction L23E STP URBANIZED AREAS CO Air Quality Nonexempt Delete 2234<br />
FHWA 8 82558 CO CO Contr 600,000.00 $0 $2,070,000 $0 $2,070,000 2013 LNTP Local Match New Construction LNTP Non Traditional Local Match CO Air Quality Nonexempt 2234<br />
FHWA 8 82558 CO CO Engr 70,000.00 $0 $2,070,000 $0 $2,070,000 2013 LNTP Local Match New Construction LNTP Non Traditional Local Match CO Air Quality Nonexempt 2234<br />
FHWA 11 19484 BEL US 40 24.900 BEL<br />
RECONSTRUCT DETERIORATED CONCRETE SIDEWALK CURB,<br />
DRIVEWAYS AND SUBSTANDARD CATCH BASINS<br />
0.30 mi. W <strong>of</strong> CR 18 TO 0.01MI W<br />
TR1285<br />
ODOT SPONSORING AGENCY BOM CO CO Contr 1,679,616.00 $0 $2,179,520 $0 $2,180,520 2015 4PF7 Federal Add Sidewalks Q240 STP Anywhere 2 Delete 3043<br />
FHWA 11 19484 CO CO Contr 419,904.00 $0 $2,179,520 $0 $2,180,520 2015 4PS7 State Add Sidewalks 002 State Funds (S,O) 2 3043<br />
FHWA 11 19484 CO CO Engr 64,000.00 $0 $2,179,520 $0 $2,180,520 2015 LABR Federal Add Sidewalks Q240 STP Anywhere 2 3043<br />
FHWA 11 19484 CO CO Engr 16,000.00 $0 $2,179,520 $0 $2,180,520 2015 LABR State Add Sidewalks 002 State Funds (S,O) 2 3043<br />
FHWA 11 90630 D11 CH FY2014 D11 barrier sweeping various routes and locations DISTRICT 11-Planning CO CO Contr 150,000.00 $0 $165,000 $0 $175,000 2014 4CP7 State Cleaning/Sweeping Highways Delete 3112<br />
FHWA 11 90630 CO CO Engr 15,000.00 $0 $165,000 $0 $175,000 2014 LABR State Cleaning/Sweeping Highways 3112<br />
FHWA 11 90631 D11 CH FY2015 D11 barrier sweeping various routes and locations DISTRICT 11-Planning CO CO Contr 150,000.00 $0 $165,000 $0 $175,000 2015 4CP7 State Cleaning/Sweeping Highways Delete 3114<br />
FHWA 11 90631 CO CO Engr 15,000.00 $0 $165,000 $0 $175,000 2015 LABR State Cleaning/Sweeping Highways 3114<br />
<strong>STIP</strong> Revisions<br />
FHWA 1 77305 ALL Shawnee Rd. ALL<br />
Study corridor and make recommendations to improve<br />
Shawnee Road from Zurmehly Rd. to<br />
geometrics, ingress/egress, ease congestion and upgrade traffic<br />
Adgate Rd. & Ft. Amanda Rd. from<br />
control devices as necessary. Also, replace existing structure<br />
Breezewood Ln. to Buckeye Rd.<br />
over the Ottawa River with a new wider structure.<br />
ALLEN COUNTY ENGINEER LACRPC RW Acquis $125,000 $0 $965,000 $665,000 $8,342,750 2013 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 CO Air Quality Exempt New Project/Phase Safety funds for R/W Passed 5/24/2012 A0891<br />
FHWA 1 77305 RW RW Serv $72,000 2013 4B77 Federal Intersection Improvement L20E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 1 90952<br />
PAU SRTS Paulding<br />
Sidewalks<br />
PAU<br />
S.R.T.S. project. Add new sidewalks along Water Street from<br />
Jackson Street to Baldwin Street, along Emerald Road from<br />
Johnson Road to the school and along North Main Street from<br />
Baldwin Street to Miles Street. Add new sidewalk at missing<br />
sections on Car<br />
Village Streets near the Paulding<br />
Elementary and Middle school.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
PAULDING PE Dtl Dsgn $87,300 $0 $0 $0 $995,939 2013 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE Revised Funding Cost Increase Above Threshold NA A0896<br />
FHWA 1 90952 PE Env PE $16,200 2012 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE A0896<br />
FHWA 1 90952<br />
FHWA 1 93589<br />
PAU SRTS Paulding<br />
Sidewalks<br />
PAU SRTS Antwerp Phase<br />
II<br />
PAU<br />
PAU<br />
S.R.T.S. project. Add new sidewalks along Water Street from<br />
Jackson Street to Baldwin Street, along Emerald Road from<br />
Johnson Road to the school and along North Main Street from<br />
Baldwin Street to Miles Street. Add new sidewalk at missing<br />
sections on Car<br />
Add new sidewalk along the west side <strong>of</strong> Harrmann Road from<br />
the Antwerp School to Canal Road and along the north side <strong>of</strong><br />
Canal Road from Harrmann Road westerly to Koos Drive.<br />
Village Streets near the Paulding<br />
Elementary and Middle school.<br />
Harrmann Road and Canal Road in the<br />
Village <strong>of</strong> Antwerp<br />
PAULDING RW Acquis $17,300 $0 $0 $0 $995,939 2012 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE Revised Funding Cost Increase Above Threshold NA A0896<br />
Antwerp, Village <strong>of</strong> CO CO Contr $170,000 $0 $187,000 $0 $187,000 2014 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New project NA A0897<br />
FHWA 1 93589 CO CO Engr $17,000 2014 LABR Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE A0897<br />
FHWA 2 79991<br />
LUC IR 475 14.18 Redeck 3<br />
Brdg<br />
LUC<br />
A district allocation funded project to redeck and paint the<br />
structural steel <strong>of</strong> 3 bridges over I-475 in the City <strong>of</strong> Toledo,<br />
perform necessary related work. UPDATE (5-5-11): Project<br />
scope increased from paint to now include redeck as per<br />
Monroe St bridge over I-475, Bowen Rd<br />
over I-475, Rushland Ave over I-475.<br />
DISTRICT 2 PRODUCTION TMACOG CO CO Contr $2,520,000 $0 $4,925,000 $525 $4,927,525 2014 4PF7 Federal Bridge Deck Replacement L010 INTERSTATE MAINTENANCE 0 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold<br />
TMACOG Resolution 2012-07,<br />
TIP amend 6, Previously<br />
attached.<br />
Bradley. Quantit<br />
FHWA 2 79991 CO CO Contr $1,305,000 2014 4PF7 Federal Bridge Deck Replacement L010 INTERSTATE MAINTENANCE 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Contr $280,000 2014 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Contr $250,000 2014 4BG7 Local Match Bridge Deck Replacement 002 Local Match 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Contr $145,000 2014 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Engr $252,000 2014 LABR Federal Bridge Deck Replacement L010 INTERSTATE MAINTENANCE 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Engr $130,500 2014 LABR Federal Bridge Deck Replacement L010 INTERSTATE MAINTENANCE 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Engr $28,000 2014 LABR State Bridge Deck Replacement 002 State Funds (S,O) 0 CO Air Quality Exempt A0898<br />
FHWA 2 79991 CO CO Engr $14,500 2014 LABR State Bridge Deck Replacement 002 State Funds (S,O) 0 CO Air Quality Exempt A0898<br />
FHWA 2 85252 LUC US 20A 02.23 Resurf LUC<br />
Resurface US-20A in Lucas County from SR-295 to Ford St in<br />
Maumee, perform necessary related work. UPDATE (6-7-11)<br />
may need to combine with PID 25527. UPDATE (10-25-11):<br />
Deleted PID 25527 and added work to this PID. Quantity splits<br />
LUC-20A from SR-295 to near Ford St in<br />
Maumee<br />
DISTRICT 2 PRODUCTION TMACOG CO CO Contr $1,808,000 $0 $3,480,000 $0 $3,482,000 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L240 STP FLEXIBLE 9 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold<br />
required (from SLM 2.23<br />
FHWA 2 85252 CO CO Contr $452,000 2013 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Contr $432,000 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L050 NATIONAL HWY SYST 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Contr $240,000 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L24E STP FLEXIBLE 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Contr $108,000 2013 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Contr $100,000 2013 4BG7 Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Contr $60,000 2013 4BG7 Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Engr $180,800 2013 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys L240 STP FLEXIBLE 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Engr $45,200 2013 LABR State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Engr $43,200 2013 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys L050 NATIONAL HWY SYST 9 CO Air Quality Exempt A0899<br />
FHWA 2 85252 CO CO Engr $10,800 2013 LABR State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 9 CO Air Quality Exempt A0899<br />
FHWA 2 88197<br />
HEN US 24/424 Stone<br />
Arches<br />
HEN<br />
A project to rehab and/or replace 8 stone arch culverts in Henry<br />
County in preparation <strong>of</strong> abandoning the old US-24 and SR-424<br />
8 stone arch culverts; 4 culverts on HENto<br />
the County (Henry); Perform necessary related work. Design<br />
DISTRICT 2 PRODUCTION<br />
24 and 4 culverts on HEN-424<br />
using task order PID 87609. Quantity splits required for HEN-424-<br />
8<br />
CO CO Contr $1,280,000 $0 $3,699,300 $394,374 $4,095,674 2013 4BK7 Federal Culvert Construction/Reconstr/Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 2 92463<br />
HEN SR 109 20.41 Bridge<br />
Repair<br />
HEN<br />
A district allocation funded project to repair bridge edges and<br />
place a new bridge wearing surface over Dry Creek, perform<br />
necessary related work. This is a small project that eventually<br />
should be combined with a nearby resurfacing project.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
Bridge over Dry Creek DISTRICT 2 PRODUCTION CO CO Contr $160,000 $0 $220,000 $0 $220,000 2014 4PF7 Federal Bridge Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 3 84990 CO CO Engr $29,918 2014 4B87 Federal Bridge Repair L11E BRIDGE 15% OFF SYSTEM A0919<br />
FHWA 3 84990 CO CO Engr $1,575 2014 LNTP Local Match Bridge Repair LNTP Non Traditional Local Match A0919<br />
FHWA 3 85051 RIC SR 0545 01.44 RIC<br />
2 Lane ResurfacingRIC-545-01.44 (US 30 Interchage Area) to ASD-<br />
RIC-545-01.44 to ASD-545-05.47 ODOT SPONSORING AGENCY RCRPC CO CO Contr $2,302,760 $0 $3,466,139 $0 $3,466,139 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L250 STP Rural
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 4 80680<br />
STA Paris Avenue (CR-44-<br />
9.34)<br />
STA<br />
Paris / Meese and Paris / Easton intersections improvement,<br />
consisting <strong>of</strong> pr<strong>of</strong>ile corrections, widening.<br />
Paris Road at Meese Road and Paris<br />
Road at Easton Road<br />
STARK COUNTY ENGINEER SCATS CO CO Contr $874,760 $0 $2,679,888 $214,245 $3,394,133 2014 4HB7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold<br />
SCATS Resolution dated April<br />
23, 2012.<br />
A0936<br />
FHWA 4 80680 CO CO Contr $540,000 2014 4TB7 Federal Intersection Improvement L40E CMAQ 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Contr $514,800 2014 4R47 Federal Intersection Improvement HY10 Hi Priority Projects Sec 1702 "House"0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Contr $218,690 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Contr $135,000 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Contr $128,700 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $97,150 2014 4HB7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $60,000 2014 4TB7 Federal Intersection Improvement L40E CMAQ 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $57,200 2014 4R47 Federal Intersection Improvement HY10 Hi Priority Projects Sec 1702 "House"0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $24,288 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $15,000 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 80680 CO CO Engr $14,300 2014 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0936<br />
FHWA 4 81282<br />
STA Werner Church<br />
(CR190)<br />
STA<br />
Replacement <strong>of</strong> structure possible alternative alignment <strong>of</strong><br />
bridge with Applegrove Street.<br />
Structure over the middlebranch <strong>of</strong><br />
Nimishillen in Plain Township<br />
STARK COUNTY ENGINEER SCATS CO CO Contr $1,665,000 $0 $5,406,226 $177,047 $6,729,179 2015 4TA7 Federal Bridge Replacement L23E STP URBANIZED AREAS 0 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold<br />
SCATS Resolution passed April<br />
23, 2012.<br />
A0937<br />
FHWA 4 81282 CO CO Contr $1,051,000 2015 LNTP Local Match Bridge Replacement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $735,471 2015 4B87 Federal Bridge Replacement L1C0 BRIDGE 85% ON/OFF 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $450,000 2015 4TB7 Federal Bridge Replacement L40E CMAQ 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $416,250 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $248,614 2015 4R47 Federal Bridge Replacement LY60 HI PRI SEC 112 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $183,868 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Contr $112,500 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $185,000 2015 4TA7 Federal Bridge Replacement L23E STP URBANIZED AREAS 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $120,000 2015 LNTP Local Match Bridge Replacement LNTP Non Traditional Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $81,719 2015 4B87 Federal Bridge Replacement L1C0 BRIDGE 85% ON/OFF 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $50,000 2015 4TB7 Federal Bridge Replacement L40E CMAQ 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $46,250 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $27,624 2015 4R47 Federal Bridge Replacement LY60 HI PRI SEC 112 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $20,430 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81282 CO CO Engr $12,500 2015 LNTP Local Match Bridge Replacement 002 Local Match 0 CO Air Quality Exempt A0937<br />
FHWA 4 81599 SUM SR 0619 06.44 SUM<br />
Resurfacing. Bridge replacement to SUM-SR619-12.04 (sfn#<br />
7711166).<br />
New Franklin Eastern Corp. line to Stark<br />
ODOT SPONSORING AGENCY<br />
County line.<br />
<strong>AM</strong>ATS CO CO Contr $1,160,000 $0 $2,042,500 $10,000 $2,082,290 2013 4PF7 Federal Mill and Fill L24E STP FLEXIBLE 6 Revised Funding Cost Increase Above Threshold<br />
<strong>AM</strong>ATS Amendment #13, dated<br />
May 17, 2012.<br />
A0938<br />
FHWA 4 81599 CO CO Contr $290,000 2013 4BG7 Local Match Mill and Fill 002 Local Match 6 A0938<br />
FHWA 4 81599 CO CO Contr $220,000 2013 4PF7 Federal Mill and Fill L1C0 BRIDGE 85% ON/OFF 6 A0938<br />
FHWA 4 81599 CO CO Contr $110,000 2013 4TA7 Federal Mill and Fill L23E STP URBANIZED AREAS 6 A0938<br />
FHWA 4 81599 CO CO Contr $55,000 2013 4PS7 State Mill and Fill 002 State Funds (S,O) 6 A0938<br />
FHWA 4 81599 CO CO Contr $27,500 2013 4BG7 Local Match Mill and Fill 002 Local Match 6 A0938<br />
FHWA 4 81599 CO CO Engr $112,000 2013 LABR Federal Mill and Fill L1C0 BRIDGE 85% ON/OFF 6 A0938<br />
FHWA 4 81599 CO CO Engr $28,000 2013 LABR Local Match Mill and Fill 002 Local Match 6 A0938<br />
FHWA 4 81599 CO CO Engr $22,000 2013 LABR Federal Mill and Fill L1C0 BRIDGE 85% ON/OFF 6 A0938<br />
FHWA 4 81599 CO CO Engr $12,500 2013 LABR Local Match Mill and Fill 002 Local Match 6 A0938<br />
FHWA 4 81599 CO CO Engr $5,500 2013 LABR State Mill and Fill 002 State Funds (S,O) 6 A0938<br />
FHWA 4 82907 POR SR 0014 01.72 POR<br />
Resurfacing in the City <strong>of</strong> Streetsboro from SLM 1.72 to 3.68.<br />
Also includes bridge work on POR-14-0168 (SFN 6700519) and<br />
POR-14-0208 (SFN 6700543).<br />
SLM 1.72 to SLM 3.68 STREETSBORO <strong>AM</strong>ATS CO CO Contr $800,000 $0 $1,477,000 $0 $1,477,000 2013 4PF7 Federal Resurfacing, Undivided System L050 NATIONAL HWY SYST 2 Revised Funding Cost Increase Above Threshold<br />
<strong>AM</strong>ATS Amendment #13, dated<br />
May 17, 2012.<br />
FHWA 4 82907 CO CO Contr $200,000 2013 4PF7 Federal Resurfacing, Undivided System L24E STP FLEXIBLE 2 A0939<br />
FHWA 4 82907 CO CO Contr $200,000 2013 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 2 A0939<br />
FHWA 4 82907 CO CO Contr $60,000 2013 4PF7 Federal Resurfacing, Undivided System L05E NATIONAL HIGHWAY SYSTEM 2 A0939<br />
FHWA 4 82907 CO CO Contr $50,000 2013 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 2 A0939<br />
FHWA 4 82907 CO CO Contr $20,800 2013 4TA7 Federal Resurfacing, Undivided System L23E STP URBANIZED AREAS 2 A0939<br />
FHWA 4 82907 CO CO Contr $15,000 2013 4PS7 State Resurfacing, Undivided System 002 State Funds (S,O) 2 A0939<br />
FHWA 4 82907 CO CO Contr $5,200 2013 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 2 A0939<br />
FHWA 4 82907 CO CO Engr $80,000 2013 LABR Federal Resurfacing, Undivided System L050 NATIONAL HWY SYST 2 A0939<br />
FHWA 4 82907 CO CO Engr $20,000 2013 LABR Federal Resurfacing, Undivided System L24E STP FLEXIBLE 2 A0939<br />
FHWA 4 82907 CO CO Engr $20,000 2013 LABR Local Match Resurfacing, Undivided System 002 Local Match 2 A0939<br />
FHWA 4 82907 CO CO Engr $5,000 2013 LABR Local Match Resurfacing, Undivided System 002 Local Match 2 A0939<br />
FHWA 4 82914 SUM SR 0303 10.54 SUM<br />
Resurfacing <strong>of</strong> SUM 303 from SLM 10.54 to 15.71. Also includes<br />
minor work on three Structures, SUM-303-1300 (SFN 7710054), Western Hudson Corp line to Eastern<br />
SUM-303-1304 (SFN 7710089) and SUM-303-1306 (SFN Corp line.<br />
7700127).<br />
ODOT SPONSORING AGENCY <strong>AM</strong>ATS CO CO Contr $1,400,000 $0 $2,682,500 $0 $2,682,500 2013 4PF7 Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 Revised Funding Cost Increase Above Threshold<br />
<strong>AM</strong>ATS Amendment #13, dated<br />
May 17, 2012.<br />
FHWA 4 82914 CO CO Contr $350,000 2013 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 5 A0940<br />
FHWA 4 82914 CO CO Contr $240,000 2013 4PF7 Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 A0940<br />
FHWA 4 82914 CO CO Contr $160,000 2013 4PF7 Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 A0940<br />
FHWA 4 82914 CO CO Contr $150,000 2013 4TA7 Federal Resurfacing, Undivided System L23E STP URBANIZED AREAS 5 A0940<br />
FHWA 4 82914 CO CO Contr $60,000 2013 4PS7 State Resurfacing, Undivided System 002 State Funds (S,O) 5 A0940<br />
FHWA 4 82914 CO CO Contr $40,000 2013 4PS7 State Resurfacing, Undivided System 002 State Funds (S,O) 5 A0940<br />
FHWA 4 82914 CO CO Contr $37,500 2013 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 5 A0940<br />
FHWA 4 82914 CO CO Engr $140,000 2013 LABR Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 A0940<br />
FHWA 4 82914 CO CO Engr $40,000 2013 LABR Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 A0940<br />
FHWA 4 82914 CO CO Engr $35,000 2013 LABR Local Match Resurfacing, Undivided System 002 Local Match 5 A0940<br />
FHWA 4 82914 CO CO Engr $20,000 2013 LABR Local Match Resurfacing, Undivided System 002 Local Match 5 A0940<br />
FHWA 4 82914 CO CO Engr $10,000 2013 LABR State Resurfacing, Undivided System 002 State Funds (S,O) 5 A0940<br />
FHWA 4 83407 TRU WRG Phase III TRU<br />
Preparation <strong>of</strong> lease agreements and/or permanent easements,<br />
survey work, environmental review documents, soils<br />
investigation, designing engineering and drawing, construction<br />
and inspections in order to connect to Phase I<br />
Intersection <strong>of</strong> Champion Avenue East<br />
in Champion Township<br />
Trumball County Metropark<br />
District<br />
EASTGATE PE Dtl Dsgn $110,632 $284,630 $395,262 $284,630 $1,615,262 2013 4TB7 Federal Bikeways L400 CMAQ New Project/Phase New Project<br />
Eastgate resolution #006-2012,<br />
dated April 30, 2012<br />
FHWA 4 84457<br />
TRU Parkman Meso. Rd<br />
(CH313)<br />
TRU Replacing structure Over Andrews Creek TRUMBULL COUNTY ENGINEER EASTGATE PE Dtl Dsgn $78,611 $177,389 $275,653 $177,389 $957,053 2013 4TA7 Federal Bridge Replacement L23E STP URBANIZED AREAS Revised Funding Cost Increase Above Threshold<br />
Eastgate resolution #006-2012,<br />
dated April 30, 2012<br />
A0942<br />
FHWA 4 84457 PE Dtl Dsgn $19,653 2013 LNTP Local Match Bridge Replacement 002 Local Match A0942<br />
FHWA 4 85299 STA 12th Street HSP STA<br />
Widening <strong>of</strong> 12th Street from Monument to Maple, including<br />
the widening <strong>of</strong> Market Street (SR-43) approaches for addition<br />
<strong>of</strong> left turn storage lanes. Install coordinated signal system<br />
through East/West corridor networked with existing<br />
North/South systems.<br />
FHWA 4 85299 CO CO Contr $3,437,950 2014 4TB7 Federal Turn Lane Addition L40E CMAQ 1 A0943<br />
FHWA 4 85299 CO CO Contr $1,698,487 2014 4HJ7 Federal Turn Lane Addition LS3E HSIP - HWY SAFETY IMPR 1 A0943<br />
FHWA 4 85299 CO CO Contr $1,230,949 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Contr $859,488 2014 LNTP Local Match Turn Lane Addition 002 Local Match 1 A0943<br />
FHWA 4 85299 CO CO Contr $450,000 2014 4TC7 Federal Turn Lane Addition L22E STP ENHANCEMENT 1 A0943<br />
FHWA 4 85299 CO CO Contr $408,800 2014 4PF7 Federal Turn Lane Addition 1 A0943<br />
FHWA 4 85299 CO CO Contr $188,721 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Contr $148,493 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Contr $112,500 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Contr $102,200 2014 4PS7 State Turn Lane Addition 002 State Funds (S,O) 1 A0943<br />
FHWA 4 85299 CO CO Engr $547,088 2014 4TA7 Federal Turn Lane Addition L23E STP URBANIZED AREAS 1 A0943<br />
FHWA 4 85299 CO CO Engr $382,000 2014 4TB7 Federal Turn Lane Addition L40E CMAQ 1 A0943<br />
FHWA 4 85299 CO CO Engr $188,721 2014 4HJ7 Federal Turn Lane Addition LS3E HSIP - HWY SAFETY IMPR 1 A0943<br />
FHWA 4 85299 CO CO Engr $136,772 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Engr $95,500 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Engr $50,000 2014 4TC7 Federal Turn Lane Addition L22E STP ENHANCEMENT 1 A0943<br />
FHWA 4 85299 CO CO Engr $20,969 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 85299 CO CO Engr $12,500 2014 LNTP Local Match Turn Lane Addition LNTP Non Traditional Local Match 1 A0943<br />
FHWA 4 86979 SUM IR 76/77 11.27/12.22 SUM<br />
Relocation <strong>of</strong> Johnston Street between Spicer Street and Brown<br />
Street two facilitate the improvement <strong>of</strong> IR-76 by removing<br />
three structures over Johnston Street.<br />
SR-43 at SR-153 intersection CANTON SCATS CO CO Contr $4,923,796 $0 $14,994,933 $482,590 $19,048,402 2014 4TA7 Federal Turn Lane Addition L23E STP URBANIZED AREAS 1 Revised Funding Cost Increase Above Threshold<br />
Brown Street to Central Interchange DISTRICT 4-PLANNING <strong>AM</strong>ATS RW Acquis $1,575,000 $0 $2,000,000 $1,291,339 $20,391,339 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE 1 Revised Funding Cost Increase Above Threshold<br />
SCATS resolution passed on<br />
March 26, 2012.<br />
<strong>AM</strong>ATS Amendment #13, dated<br />
May 17, 2012.<br />
FHWA 4 86979 RW Acquis $175,000 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 1 A0944<br />
FHWA 4 86979 RW RW Serv $225,000 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE 1 A0944<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 5 <strong>of</strong> 25<br />
A0939<br />
A0940<br />
A0941<br />
A0943<br />
A0944
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 4 86979 RW RW Serv $25,000 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 1 A0944<br />
FHWA 4 88903 STA SR 0297 00.66 STA Resurfacing. US-30 to Tuscarawas Street (SR-172) DISTRICT 4-PLANNING SCATS CO CO Contr $320,000 $0 $825,000 $0 $825,000 2015 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys 1 New Project/Phase New 2012-15 project<br />
SCATS resolution passed March<br />
26, 2012.<br />
A0945<br />
FHWA 4 88903 CO CO Contr $280,000 2015 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys 1 A0945<br />
FHWA 4 88903 CO CO Contr $80,000 2015 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 1 A0945<br />
FHWA 4 88903 CO CO Contr $70,000 2015 4BG7 Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 1 A0945<br />
FHWA 4 88903 CO CO Engr $32,000 2015 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys 1 A0945<br />
FHWA 4 88903 CO CO Engr $28,000 2015 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys 1 A0945<br />
FHWA 4 88903 CO CO Engr $8,000 2015 LABR State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 1 A0945<br />
FHWA 4 88903 CO CO Engr $7,000 2015 LABR Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 1 A0945<br />
FHWA 4 89022<br />
STA Everhard Road &<br />
Whipple Ave.<br />
STA<br />
Addition <strong>of</strong> Center Turn Lane from RR tracks on Whipple<br />
Avenue to the intersection, and RR tracks on Everhard Road to<br />
the intersection. Includes new storm sewer, curb and gutter,<br />
culvert replacement, signals, signing, and striping. Elimination <strong>of</strong><br />
left turn<br />
Everhard and Whipple Intersection STARK COUNTY ENGINEER SCATS RW Acquis $1,110,000 $0 $1,387,500 $0 $1,387,500 2015 4TB7 Federal Intersection Improvement L40E CMAQ 1 Revised Funding Cost Increase Above Threshold<br />
FHWA 4 89022 RW Acquis $277,500 2015 LNTP Local Match Intersection Improvement 002 Local Match 1 A0946<br />
FHWA 4 89876 STA Parks Bike Crossings STA<br />
Provide three bicycle / pedestrian crossings as part <strong>of</strong> the<br />
Hoover Connector trail. Easton Street (East <strong>of</strong> Glenoak School<br />
Drive), Schneider Street (West <strong>of</strong> Glenoak School Drive), and<br />
Marquardt Avenue (North <strong>of</strong> Devon Drive).<br />
Stark County Park trail crossings on<br />
Easton, Schneider, and Marquardt.<br />
Stark County Park District SCATS CO CO Contr $75,000 $0 $82,500 $8,335 $105,835 2014 4HJ7 Federal Bikeways LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Add CO phase<br />
FHWA 4 89876 CO CO Engr $7,500 2014 LABR Federal Bikeways LS3E HSIP - HWY SAFETY IMPR 0 A0947<br />
FHWA 4 89876 STA Parks Bike Crossings STA<br />
FHWA 4 90361 STA SR 0153 01.70 STA<br />
Provide three bicycle / pedestrian crossings as part <strong>of</strong> the<br />
Hoover Connector trail. Easton Street (East <strong>of</strong> Glenoak School<br />
Drive), Schneider Street (West <strong>of</strong> Glenoak School Drive), and<br />
Marquardt Avenue (North <strong>of</strong> Devon Drive).<br />
Streetscape/economic development project to improve traffic<br />
flow and safety. Address roadway pavement, curbs, sidewalks,<br />
ramps, crosswalks, lights, and signals.To be sold with PID#<br />
92235, STA-153-2.69. Urban Paving.<br />
Stark County Park trail crossings on<br />
Easton, Schneider, and Marquardt.<br />
Stark County Park District SCATS RW Acquis $5,000 $0 $8,335 $105,835 2013 4HJ7 Federal Bikeways LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Add RW phase<br />
Grace Avenue to Harmont Avenue CANTON SCATS RW Acquis $200,000 $0 $250,000 $0 $10,957,887 2013 4BK7 Federal Mill and Fill L20E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 4 93303<br />
STA/SUM TSG FY2013<br />
(UPS)<br />
STA<br />
Adding Uninterrupted Power Supply (UPS), also known as<br />
battery backup power to signalized intersections throughout<br />
Stark and Summit Counties.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
Stark and Summit Counties DISTRICT 4-HMA SCATS CO CO Contr $380,000 $0 $418,000 $0 $418,000 2013 4HJ7 Federal Signals LS3E HSIP - HWY SAFETY IMPR 44 New Project/Phase New FY2012-15 Project<br />
FHWA 4 93303 CO CO Engr $38,000 2013 LABR Federal Signals LS3E HSIP - HWY SAFETY IMPR 44 A0958<br />
FHWA 4 93304<br />
MAH/POR TSG FY2014<br />
(UPS)<br />
MAH<br />
Adding battery back-up power to signalized intersections<br />
throughout Mahoning and Portage Counties.<br />
Mahoning and Portage Counties. DISTRICT 4-HMA EASTGATE CO CO Contr $360,000 $0 $396,000 $0 $396,000 2014 4HJ7 Federal Signals LS3E HSIP - HWY SAFETY IMPR 33 New Project/Phase New 2012-15 project<br />
Per SCATS Resolution dated<br />
April 23, 2012.<br />
Eastgate resolution #007-2012,<br />
dated April 30, 2012<br />
FHWA 4 93304 CO CO Engr $36,000 2014 LABR Federal Signals LS3E HSIP - HWY SAFETY IMPR 33 A0959<br />
FHWA 4 93306<br />
ATB/TRU TSG FY2015<br />
(UPS)<br />
ATB<br />
Adding battery backup power to signalized intersections<br />
throughout Ashtabula and Trumbull Counties.<br />
Ashtabula and Trumbull Counties. DISTRICT 4-HMA EASTGATE CO CO Contr $340,000 $0 $374,000 $0 $374,000 2015 4HJ7 Federal Signals LS3E HSIP - HWY SAFETY IMPR 71 New Project/Phase New 2012-15 project<br />
Eastgate resolution #007-2012,<br />
dated April 30, 2012<br />
A0960<br />
FHWA 4 93306 CO CO Engr $34,000 2015 LABR Federal Signals LS3E HSIP - HWY SAFETY IMPR 71 A0960<br />
FHWA 4 93376 STA SR 0043 17.24 STA<br />
Widening <strong>of</strong> roadway to 4/5 lanes.Designed under PID# 80681,<br />
by URS. May 2013 Programmatic is for RW Services only.<br />
55th Street to Applegrove DISTRICT 4-PLANNING SCATS PE Env PE $297,000 $0 $331,000 $0 $5,351,000 2014 4HJ7 Federal Major Widening LS3E HSIP - HWY SAFETY IMPR 2 New Project/Phase Add PE phase<br />
FHWA 4 93376 PE Env PE $33,000 2014 4BC7 State Major Widening 002 State Funds (S,O) 2 A0961<br />
FHWA 4 93376 STA SR 0043 17.24 STA<br />
Widening <strong>of</strong> roadway to 4/5 lanes.Designed under PID# 80681,<br />
by URS. May 2013 Programmatic is for RW Services only.<br />
55th Street to Applegrove DISTRICT 4-PLANNING SCATS RW Acquis $810,000 $0 $0 $0 $5,351,000 2014 4HJ7 Federal Major Widening LS3E HSIP - HWY SAFETY IMPR 2 New Project/Phase Add RW phase<br />
FHWA 4 93376 RW Acquis $90,000 2014 4BC7 State Major Widening 002 State Funds (S,O) 2 A0961<br />
FHWA 4 93376 RW RW Serv $243,000 2014 4HJ7 Federal Major Widening LS3E HSIP - HWY SAFETY IMPR 2 A0961<br />
FHWA 4 93376 RW RW Serv $27,000 2014 4BC7 State Major Widening 002 State Funds (S,O) 2 A0961<br />
FHWA 4 93385<br />
TRU Greenway Trailhead<br />
Project<br />
TRU<br />
The proposed project will consist <strong>of</strong> constructing a trailhead and<br />
amenities at various locations along the Great <strong>Ohio</strong> Lake to<br />
River Greenway.<br />
Great <strong>Ohio</strong> Lake to River Greenway WARREN EASTGATE CO CO Contr $450,000 $0 $500,000 $0 $760,000 2014 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add CO phase<br />
SCATS Resolution FY2012-15,<br />
dated June 25, 2012.<br />
SCATS Resolution FY2012-15,<br />
dated June 25, 2012.<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
FHWA 4 93385 CO CO Engr $50,000 2014 LNTP Local Match Bikeways 002 Local Match A0962<br />
FHWA 4 93385<br />
TRU Greenway Trailhead<br />
Project<br />
TRU<br />
The proposed project will consist <strong>of</strong> constructing a trailhead and<br />
amenities at various locations along the Great <strong>Ohio</strong> Lake to<br />
River Greenway.<br />
Great <strong>Ohio</strong> Lake to River Greenway WARREN EASTGATE PE Dtl Dsgn $50,000 $0 $0 $0 $760,000 2013 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add PE Phase<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
FHWA 4 93385 PE Env PE $128,000 2013 4D57 Federal Bikeways L680 TCSP A0962<br />
FHWA 4 93385 PE Env PE $32,000 2013 LNTP Local Match Bikeways 002 Local Match A0962<br />
FHWA 4 93385<br />
FHWA 4 93393<br />
TRU Greenway Trailhead<br />
Project<br />
POR Johnnycake Rd.<br />
Bridge<br />
TRU<br />
POR<br />
The proposed project will consist <strong>of</strong> constructing a trailhead and<br />
amenities at various locations along the Great <strong>Ohio</strong> Lake to<br />
River Greenway.<br />
Great <strong>Ohio</strong> Lake to River Greenway WARREN EASTGATE RW Acquis $50,000 $0 $0 $0 $760,000 2013 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add RW phase<br />
Bridge replacement. Existing single span steel beam structure to<br />
be replaced with single span prestressed concrete box beam.<br />
Includes approach work.<br />
Over Feeder Canal PORTAGE COUNTY ENGINEER <strong>AM</strong>ATS CO CO Contr $459,360 $0 $638,000 $0 $638,000 2014 4B87 Federal Bridge Replacement L11E BRIDGE 15% OFF SYSTEM New Project/Phase New Project<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
<strong>AM</strong>ATS Amendment #13, dated<br />
May 17, 2012.<br />
FHWA 4 93393 CO CO Contr $114,840 2014 LNTP Local Match Bridge Replacement 002 Local Match A0963<br />
FHWA 4 93393 CO CO Engr $51,040 2014 4B87 Federal Bridge Replacement L11E BRIDGE 15% OFF SYSTEM A0963<br />
FHWA 4 93393 CO CO Engr $12,760 2014 LNTP Local Match Bridge Replacement 002 Local Match A0963<br />
FHWA 4 93432 SUM Brittain Road Signals SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. From East Market Street to<br />
Eastwood Avenue, in the City <strong>of</strong> Akron.<br />
East Market Street to Eastwood Avenue AKRON <strong>AM</strong>ATS CO CO Contr $828,000 $0 $1,150,000 $0 $1,150,000 2015 4TB7 Federal Signals L40E CMAQ 2 New Project/Phase New phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
FHWA 4 93432 CO CO Contr $207,000 2015 LNTP Local Match Signals 002 Local Match 2 A0964<br />
FHWA 4 93432 CO CO Engr $92,000 2015 4TB7 Federal Signals L40E CMAQ 2 A0964<br />
FHWA 4 93432 CO CO Engr $23,000 2015 LNTP Local Match Signals 002 Local Match 2 A0964<br />
FHWA 4 93433 SUM Canton Road Signal SUM<br />
Signal upgrade. Possible turn lane additions. ADA pushbuttons,<br />
Video detection, un-interrupted power supply. Pavement<br />
markings and signing.<br />
SR-91 (Canton Road) at East Market<br />
Street (SR-18)<br />
AKRON <strong>AM</strong>ATS RW Acquis $400,000 $0 $500,000 $0 $1,500,000 2015 4TB7 Federal Signals L40E CMAQ 0 New Project/Phase New phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
FHWA 4 93433 RW Acquis $100,000 2015 LNTP Local Match Signals 002 Local Match 0 A0965<br />
FHWA 4 93434<br />
SUM Waterloo Road<br />
Signals<br />
SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. From Main Street to<br />
Arlington Street, in the City <strong>of</strong> Akron.<br />
Main Street to Arlington Street AKRON <strong>AM</strong>ATS CO CO Contr $1,008,000 $0 $1,400,000 $0 $1,400,000 2015 4TB7 Federal Signals L40E CMAQ 2 New Project/Phase New Phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
FHWA 4 93434 CO CO Contr $252,000 2015 LNTP Local Match Signals 002 Local Match 2 A0966<br />
FHWA 4 93434 CO CO Engr $112,000 2015 4TB7 Federal Signals L40E CMAQ 2 A0966<br />
FHWA 4 93434 CO CO Engr $28,000 2015 LNTP Local Match Signals 002 Local Match 2 A0966<br />
FHWA 4 93435<br />
SUM SR 0018 Signals<br />
(Summit)<br />
SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. From Summit to Portage<br />
Path, in the City <strong>of</strong> Akron.<br />
Summit to Portage Path AKRON <strong>AM</strong>ATS CO CO Contr $1,008,000 $0 $1,400,000 $0 $1,400,000 2015 4TB7 Federal Signals 2 New Project/Phase New phase<br />
FHWA 4 93435 CO CO Contr $252,000 2015 LNTP Local Match Signals 002 Local Match 2 A0967<br />
FHWA 4 93435 CO CO Engr $112,000 2015 4TB7 Federal Signals 2 A0967<br />
FHWA 4 93435 CO CO Engr $28,000 2015 LNTP Local Match Signals 002 Local Match 2 A0967<br />
FHWA 4 93436<br />
SUM SR 0018 Signals<br />
(Portage)<br />
SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. On West Market Street,<br />
from Portage Path to Hawkins, in the City <strong>of</strong> Akron.<br />
Portage Path to Hawkins AKRON <strong>AM</strong>ATS CO CO Contr $1,440,000 $0 $2,000,000 $0 $2,000,000 2015 4TB7 Federal Signals 1 New Project/Phase New phase<br />
FHWA 4 93436 CO CO Contr $360,000 2015 LNTP Local Match Signals 002 Local Match 1 A0968<br />
FHWA 4 93436 CO CO Engr $160,000 2015 4TB7 Federal Signals 1 A0968<br />
FHWA 4 93436 CO CO Engr $40,000 2015 LNTP Local Match Signals 002 Local Match 1 A0968<br />
FHWA 4 93437<br />
SUM Exchange Street<br />
Signals<br />
SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. On Exchange Street, from<br />
Main Street to Fountain Street, in the City <strong>of</strong> Akron.<br />
Main Street to Fountain Street AKRON <strong>AM</strong>ATS CO CO Contr $1,800,000 $0 $2,500,000 $0 $2,500,000 2015 4TB7 Federal Signals 1 New Project/Phase Add CO phase<br />
FHWA 4 93437 CO CO Contr $450,000 2015 LNTP Local Match Signals 002 Local Match 1 A0969<br />
FHWA 4 93437 CO CO Engr $200,000 2015 4TB7 Federal Signals 1 A0969<br />
FHWA 4 93437 CO CO Engr $50,000 2015 LNTP Local Match Signals 002 Local Match 1 A0969<br />
FHWA 4 93438 SUM Darrow Road Signals SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. On Darrow Road, from<br />
Gilchrist Road to Eastwood Avenue, in the City <strong>of</strong> Akron.<br />
Gilchrist Road to Eastwood Avenue AKRON <strong>AM</strong>ATS CO CO Contr $720,000 $0 $1,000,000 $0 $1,000,000 2015 4TB7 Federal Signals 1 New Project/Phase Add CO phase<br />
FHWA 4 93438 CO CO Contr $180,000 2015 LNTP Local Match Signals 002 Local Match 1 A0970<br />
FHWA 4 93438 CO CO Engr $80,000 2015 4TB7 Federal Signals 1 A0970<br />
FHWA 4 93438 CO CO Engr $20,000 2015 LNTP Local Match Signals 002 Local Match 1 A0970<br />
FHWA 4 93439<br />
SUM Tallmadge Avenue<br />
Signals<br />
SUM<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. On Tallmadge Avenue, from<br />
Home Avenue to Brittain Road, in the City <strong>of</strong> Akron.<br />
Home Avenue to Brittain Road AKRON <strong>AM</strong>ATS CO CO Contr $684,000 $0 $950,000 $0 $950,000 2015 4TB7 Federal Signals 1 New Project/Phase Add CO phase<br />
FHWA 4 93439 CO CO Contr $171,000 2015 LNTP Local Match Signals 002 Local Match 1 A0971<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 7 <strong>of</strong> 25<br />
<strong>AM</strong>ATS Resolution #6, dated<br />
January 26, 2012.<br />
<strong>AM</strong>ATS Resolution #6, dated<br />
January 26, 2012.<br />
<strong>AM</strong>ATS Resolution #6, dated<br />
January 26, 2012.<br />
<strong>AM</strong>ATS Resolution #6, dated<br />
January 26, 2012.<br />
<strong>AM</strong>ATS Resolution #6, dated<br />
January 26, 2012.<br />
A0958<br />
A0959<br />
A0961<br />
A0961<br />
A0962<br />
A0962<br />
A0962<br />
A0963<br />
A0964<br />
A0965<br />
A0966<br />
A0967<br />
A0968<br />
A0969<br />
A0970<br />
A0971
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 4 93439 CO CO Engr $76,000 2015 4TB7 Federal Signals 1 A0971<br />
FHWA 4 93439 CO CO Engr $19,000 2015 LNTP Local Match Signals 002 Local Match 1 A0971<br />
FHWA 4 93441<br />
POR West Side Signals-<br />
Ravenna<br />
POR<br />
Signal coordination. Including fiber optic interconnect, new<br />
signal heads, pedestrian signals, ADA pushbuttons, video<br />
detection, emergency pre-emption. On various streets in the<br />
City <strong>of</strong> Ravenna.<br />
Scranton Street to King Street RAVENNA <strong>AM</strong>ATS CO CO Contr $1,177,440 $0 $1,635,334 $0 $1,635,334 2015 4TB7 Federal Signals L40E CMAQ 1 New Project/Phase New phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
FHWA 4 93441 CO CO Contr $294,360 2015 LNTP Local Match Signals 002 Local Match 1 A0972<br />
FHWA 4 93441 CO CO Engr $130,827 2015 4TB7 Federal Signals L40E CMAQ 1 A0972<br />
FHWA 4 93441 CO CO Engr $32,707 2015 LNTP Local Match Signals 002 Local Match 1 A0972<br />
FHWA 4 93442 POR SR 0043 10.26 POR<br />
Turn lanes on State Route 43 between State Route 261 and<br />
Summit Street. Signal interconnect <strong>of</strong> SR261, Beryl Drive, Cherry<br />
Street, and School Street, in the City <strong>of</strong> Kent. Including fiber State Route 261 to Summit Street<br />
optic interconnect, new signal heads, pedestrian signals, ADA<br />
pushbut<br />
KENT <strong>AM</strong>ATS RW Acquis $120,000 $0 $150,000 $0 $2,950,000 2015 4TA7 Federal Signals L23E STP URBANIZED AREAS 1 New Project/Phase New phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
A0973<br />
FHWA 4 93442 RW Acquis $30,000 2015 LNTP Local Match Signals 002 Local Match 1 A0973<br />
FHWA 4 93444 SUM SR 0091 05.12 SUM<br />
Safety and capacity improvements. Addition <strong>of</strong> turn lanes and<br />
improvements to the pedestrian corridors by eliminating the<br />
drainage problems that flood the sidewalks.<br />
Tallmadge Circle to Garwood TALLMADGE <strong>AM</strong>ATS RW Acquis $325,000 $0 $406,250 $0 $3,362,163 2015 4TB7 Federal Turn Lane Addition L40E CMAQ 1 New Project/Phase New phase<br />
<strong>AM</strong>ATS Amendment #6, dated<br />
January 26, 2012.<br />
FHWA 4 93444 RW Acquis $81,250 2015 LNTP Local Match Turn Lane Addition 002 Local Match 1 A0974<br />
FHWA 4 93728 TRU North End Trailhead TRU<br />
The proposed project will consist <strong>of</strong> constructing a trailhead and<br />
amenities at various locations along the Great <strong>Ohio</strong> Lake to<br />
River Greenway.<br />
Great <strong>Ohio</strong> Lake to River Greenway WARREN EASTGATE CO CO Contr $144,000 $0 $200,000 $0 $200,000 2013 4D57 Federal Bikeways L680 TCSP New Project/Phase Add CO phase<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
FHWA 4 93728 CO CO Contr $36,000 2013 LNTP Local Match Bikeways 002 Local Match A0975<br />
FHWA 4 93728 CO CO Engr $16,000 2013 4D57 Federal Bikeways L680 TCSP A0975<br />
FHWA 4 93728 CO CO Engr $4,000 2013 LNTP Local Match Bikeways 002 Local Match A0975<br />
FHWA 4 93729<br />
TRU Station Park<br />
Trailhead<br />
TRU<br />
Construction <strong>of</strong> Station Park Trailhead and amenities along the<br />
TRU - Greenway Trail.<br />
Station Park Trailhead WARREN EASTGATE CO CO Contr $180,000 $0 $200,000 $0 $270,625 2014 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add CO Phase<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
A0976<br />
FHWA 4 93729 CO CO Engr $20,000 2014 LNTP Local Match Bikeways 002 Local Match A0976<br />
FHWA 4 93729<br />
TRU Station Park<br />
Trailhead<br />
TRU<br />
Construction <strong>of</strong> Station Park Trailhead and amenities along the<br />
TRU - Greenway Trail.<br />
Station Park Trailhead WARREN EASTGATE PE Dtl Dsgn $10,000 $0 $0 $0 $270,625 2013 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add PE Phase<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
A0976<br />
FHWA 4 93729 PE Env PE $44,500 2013 4D57 Federal Bikeways L680 TCSP A0976<br />
FHWA 4 93729 PE Env PE $11,125 2013 LNTP Local Match Bikeways 002 Local Match A0976<br />
FHWA 4 93729<br />
TRU Station Park<br />
Trailhead<br />
TRU<br />
FHWA 5 81249 MUS IR 70 11.43A/13.06 MUS<br />
Construction <strong>of</strong> Station Park Trailhead and amenities along the<br />
TRU - Greenway Trail.<br />
Rehab the backwalls on both bridges on IR 70 in Muskingum<br />
CountyRevised work per scope: Mus-70-11.43A - New Overlay, Location 1) Ramp A over Ramp H;<br />
new Approach Slabs, Replace Breastwall and Modify to new Location 2) IR 70 over an abandoned<br />
abutment details. New parapets and guardrail. Mus-70-13.06 – Rail Road<br />
New Overlay, Pour<br />
Station Park Trailhead WARREN EASTGATE RW Acquis $5,000 $0 $0 $270,625 2013 LNTP Local Match Bikeways 002 Local Match New Project/Phase Add RW Phase<br />
Eastgate resolution #014-2012,<br />
passed June 25, 2012<br />
ODOT SPONSORING AGENCY PE Dtl Dsgn $90,000 $0 $311,659 $0 $2,023,036 2013 4PF7 Federal Bridge Repair 0 New Project/Phase MUS IR 70 11.43A/13.06 PE Phase N/A A0977<br />
FHWA 5 81249 PE Dtl Dsgn $10,000 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0977<br />
FHWA 5 81249 PE Env PE $190,043 2013 4PF7 Federal Bridge Repair 0 A0977<br />
FHWA 5 81249 PE Env PE $21,116 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0977<br />
FHWA 5 83024 MUS SR 666 02.66/5.71 MUS<br />
Location 1) Bridge replacement <strong>of</strong> SFN 6006450 (Mus-SR 666-<br />
02.66) carrying SR 666 over a ditch Location 2) Bridge<br />
replacenent <strong>of</strong> SFN 6006574 and realign SR 666.Revised work<br />
per scope: Mus-666-0266, SFN 6006450 is an existing single<br />
span steel beam, to be<br />
Location 1) 0.04 miles N <strong>of</strong> Riverview<br />
Bailey Drive on SR 666 Location 2) 0.03<br />
miles south <strong>of</strong> TR 392<br />
ODOT SPONSORING AGENCY RW Acquis $16,000 $0 $20,000 $0 $1,395,718 2013 4PF7 Federal Bridge Replacement L1CE BRIDGE 85% ON/OFF SYSTEM 0 New Project/Phase ROW for Mus-SR 666-02.66/05.71 N/A A0978<br />
FHWA 5 83024 RW Acquis $4,000 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) 0 A0978<br />
FHWA 5 84292 MUS SR 60 06.72 MUS<br />
Realignment <strong>of</strong> approximately 1000' <strong>of</strong> SR 60 away from a rock<br />
cut slope Placement <strong>of</strong> a drilled shaft wall with lagging panels. SR 60 located 0.54 miles north <strong>of</strong> TR 612 ODOT SPONSORING AGENCY<br />
Selected as a FY 2012 GSM project.<br />
RW Acquis $40,000 $0 $65,000 $51,815 $2,120,373 2013 4PF7 Federal Slide Repair 0 New Project/Phase MUS SR 60 06.72 RW Phase not previously listed N/A A0979<br />
FHWA 5 84292 RW Acquis $10,000 2013 4PS7 State Slide Repair 002 State Funds (S,O) 0 A0979<br />
FHWA 5 84292 RW RW Serv $12,000 2013 4PF7 Federal Slide Repair 0 A0979<br />
FHWA 5 84292 RW RW Serv $3,000 2013 4PS7 State Slide Repair 002 State Funds (S,O) 0 A0979<br />
FHWA 5 87346<br />
MUS SR 146<br />
30.95/31.51/31.58<br />
MUS<br />
Repair <strong>of</strong> landslides that are slipping out from under the<br />
roadway at three locations on SR 146 in Muskingum County. Location 1 is 0.25 mi east <strong>of</strong> CR 61 (Zion<br />
Location 1 is 0.25 mi east <strong>of</strong> CR 61 (Zion Ridge Rd); Locations 2 & Ridge Rd); Locations 2 & 3 are 0.14 & ODOT SPONSORING AGENCY<br />
3 are 0.14 & 0.21 mi east <strong>of</strong> Spratt. 01/11/2012 - location has 0.21 mi east <strong>of</strong> Spratt<br />
been re<br />
RW Acquis $4,800 $0 $6,000 $21,796 $83,296 2013 4PF7 Federal Slide Repair 0 New Project/Phase<br />
MUS SR 146 30.95/31.51/31.58 RW Phase not<br />
previously listed<br />
N/A A0980<br />
FHWA 5 87346 RW Acquis $1,200 2013 4PS7 State Slide Repair 002 State Funds (S,O) 0 A0980<br />
FHWA 5 91811 GUE IR 70 12.32 L&R GUE<br />
Repair the backwalls and overlay the wearing surface on the IR<br />
70 L&R bridges over SR 265 (SFN 3001474 and SFN 3001504)<br />
Treatment Revised: In Accordance with the Bridge Design<br />
Manual and in coordination with Tim Keller, the large amount <strong>of</strong><br />
patching and p<br />
IR 70 over SR 265 DISTRICT 5 PRODUCTION PE Dtl Dsgn $135,000 $0 $395,000 $0 $7,990,416 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE 0 New Project/Phase GUE IR 70 12.32 L&R PE Phase N/A A0981<br />
FHWA 5 91811 PE Dtl Dsgn $15,000 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 A0981<br />
FHWA 5 91811 PE Env PE $175,500 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE 0 A0981<br />
FHWA 5 91811 PE Env PE $50,000 2014 LABR State Bridge Deck Replacement 002 State Funds (S,O) 0 A0981<br />
FHWA 5 91811 PE Env PE $19,500 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 A0981<br />
FHWA 5 91852<br />
COS SR 79<br />
01.60/03.94/08.34/9.55<br />
COS<br />
Replacement <strong>of</strong> the Bridge. SFN 1610474 located 0.23 miles<br />
south <strong>of</strong> TR 185 carrying SR 79 over Winding Fork <strong>of</strong><br />
Four locations on SR 79 in Coshocton<br />
Wakatomika Creek; SFN 1601539 located 0.16 miles south <strong>of</strong> CR<br />
County<br />
18 carrying SR 79 over Winding Fork <strong>of</strong> Wakatomika Creek; SFN<br />
1601563 located 0.14<br />
ODOT SPONSORING AGENCY PE Dtl Dsgn $120,000 $0 $464,070 $0 $3,288,702 2013 4PF7 Federal Bridge Replacement 0 New Project/Phase COS SR 79 01.60/03.94/08.34/9.55 PE Phase N/A A0982<br />
FHWA 5 91852 PE Dtl Dsgn $30,000 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) 0 A0982<br />
FHWA 5 91852 PE Env PE $250,856 2013 4PF7 Federal Bridge Replacement 0 A0982<br />
FHWA 5 91852 PE Env PE $62,714 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) 0 A0982<br />
FHWA 5 91856 FAI SR 37 07.36/19.62 FAI<br />
Rehabilitation <strong>of</strong> the abutments and overlaying <strong>of</strong> the decks on<br />
two structures on SR 37 in Fairfield County. SFN 2301237<br />
located 0.07 miles south <strong>of</strong> TR 378 (Holder Rd) carrying SR 37<br />
over Walnut Creek; SFN 2301326 located 0.07 miles west <strong>of</strong> CR<br />
51 (Schwi<br />
SFN 2301237 located 0.07 miles south<br />
<strong>of</strong> TR 378 (Holder Rd) and SFN 2301326<br />
ODOT SPONSORING AGENCY<br />
located 0.07 miles west <strong>of</strong> CR 51<br />
(Schwilk Rd)<br />
CO CO Contr $783,357 $0 $1,477,673 $0 $1,746,841 2013 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM 0 New Project/Phase<br />
FAI SR 37 07.36/19.62 CO Phase not previously<br />
listed<br />
A0972<br />
A0974<br />
A0975<br />
A0976<br />
N/A A0983<br />
FHWA 5 91856 CO CO Contr $291,314 2013 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM 0 A0983<br />
FHWA 5 91856 CO CO Contr $195,839 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
FHWA 5 91856 CO CO Contr $72,829 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
FHWA 5 91856 CO CO Engr $78,336 2013 LABR Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM 0 A0983<br />
FHWA 5 91856 CO CO Engr $29,131 2013 LABR Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM 0 A0983<br />
FHWA 5 91856 CO CO Engr $19,584 2013 LABR State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
FHWA 5 91856 CO CO Engr $7,283 2013 LABR State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 8 <strong>of</strong> 25
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 5 91856 FAI SR 37 07.36/19.62 FAI<br />
Rehabilitation <strong>of</strong> the abutments and overlaying <strong>of</strong> the decks on<br />
two structures on SR 37 in Fairfield County. SFN 2301237<br />
located 0.07 miles south <strong>of</strong> TR 378 (Holder Rd) carrying SR 37<br />
over Walnut Creek; SFN 2301326 located 0.07 miles west <strong>of</strong> CR<br />
51 (Schwi<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
SFN 2301237 located 0.07 miles south<br />
<strong>of</strong> TR 378 (Holder Rd) and SFN 2301326<br />
ODOT SPONSORING AGENCY<br />
located 0.07 miles west <strong>of</strong> CR 51<br />
(Schwilk Rd)<br />
PE Dtl Dsgn $80,000 $0 $0 $0 $1,746,841 2013 4PF7 Federal Bridge Repair 0 New Project/Phase FAI SR 37 07.36/19.62 PE Phase N/A A0983<br />
FHWA 5 91856 PE Dtl Dsgn $20,000 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
FHWA 5 91856 PE Env PE $134,934 2013 4PF7 Federal Bridge Repair 0 A0983<br />
FHWA 5 91856 PE Env PE $33,734 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 A0983<br />
FHWA 5 91857 KNO SR 661 02.98 KNO<br />
Repair <strong>of</strong> backwalls and overlay <strong>of</strong> the deck on SFN 4203720<br />
located 0.2 miles south <strong>of</strong> CR 27 (Sycamore Rd) carrying SR 661<br />
over Sycamore CreekRevised work per scope: Replace Existing<br />
Superstructure including cutting <strong>of</strong>f abutment down to footer.<br />
Located 0.2 miles south <strong>of</strong> CR 27<br />
(Sycamore Rd) on SR 661<br />
ODOT SPONSORING AGENCY CO CO Contr $521,151 $0 $716,583 $0 $717,083 2013 4PF7 Federal Bridge Deck Replacement L1CE BRIDGE 85% ON/OFF SYSTEM 0 New Project/Phase KNO SR 661 02.98 CO Phase not previously listed N/A A0984<br />
Keep Pier<br />
FHWA 5 91857 CO CO Contr $130,288 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 A0984<br />
FHWA 5 91857 CO CO Engr $52,115 2013 LABR Federal Bridge Deck Replacement L1CE BRIDGE 85% ON/OFF SYSTEM 0 A0984<br />
FHWA 5 91857 CO CO Engr $13,029 2013 LABR State Bridge Deck Replacement 002 State Funds (S,O) 0 A0984<br />
FHWA 5 92382 MUS SR 60 28.87 MUS<br />
To replace the bridge deck and repair the abutment on SFN<br />
6002196 carrying SR 60 over Big Run.Revised work per scope:<br />
Replace Existing Superstructure including cutting <strong>of</strong>f abutment<br />
down to footer. Keep Pier with minor item 511 concrete<br />
Located 0.05 miles north <strong>of</strong> TR 117<br />
(Airyview Road)<br />
ODOT SPONSORING AGENCY CO CO Contr $441,235 $0 $606,698 $0 $614,198 2013 4PF7 Federal Bridge Deck Replacement L1CE BRIDGE 85% ON/OFF SYSTEM 0 New Project/Phase MUS SR 60 28.87 CO Phase not previously listed N/A A0985<br />
patching. New App<br />
FHWA 5 92382 CO CO Contr $110,309 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) 0 A0985<br />
FHWA 5 92382 CO CO Engr $44,124 2013 LABR Federal Bridge Deck Replacement L1CE BRIDGE 85% ON/OFF SYSTEM 0 A0985<br />
FHWA 5 92382 CO CO Engr $11,031 2013 LABR State Bridge Deck Replacement 002 State Funds (S,O) 0 A0985<br />
FHWA 5 92696<br />
FAI/LIC IR 70<br />
Various/00.74<br />
FAI<br />
Backwall repairs and approach slab repairs <strong>of</strong> SFN 4502884 and<br />
4502914 carrying IR 70 over Palmer Road in Licking County;<br />
Backwall repairs and approach slab repairs <strong>of</strong> SFN 2301598 and<br />
2301563 carrying IR 70 over Blacklick Creek in Fairfield County;<br />
IR 70 over Palmer Road in Lic Co; IR 70<br />
over Blacklick Creek in Fai Co; IR 70 over<br />
SR 256 in Fai Co<br />
ODOT SPONSORING AGENCY MORPC CO CO Contr $158,738 $0 $1,072,775 $0 $1,073,275 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 New Project/Phase<br />
FAI/LIC IR 70 Various/00.74 using District<br />
Preservation Funding 4PF7(90%<br />
Federal)/4PS7(10% State)<br />
T-8-12 A0986<br />
Backwal<br />
FHWA 5 92696 CO CO Contr $158,738 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Contr $140,063 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Contr $140,063 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Contr $140,063 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Contr $140,063 2013 4PF7 Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Contr $17,638 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Contr $17,638 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Contr $15,563 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Contr $15,563 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Contr $15,563 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Contr $15,563 2013 4PS7 State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $15,874 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $15,874 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $14,006 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $14,006 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $14,006 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $14,006 2013 LABR Federal Bridge Maintenance/Repair (NEW) L01E INTERSTATE MAINTENANCE 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,764 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,764 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,556 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,556 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,556 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 92696 CO CO Engr $1,556 2013 LABR State Bridge Maintenance/Repair (NEW) 002 State Funds (S,O) 0 A0986<br />
FHWA 5 93517 D05 Wet Location Crashes D05<br />
District wide Safety Project to address wet pavement crash<br />
District wide project to address wet<br />
locations using applications <strong>of</strong> micro surfacing or traditional mill<br />
pavement crash locations<br />
and fill based on the conditions at each location.<br />
ODOT SPONSORING AGENCY LCATS CO CO Mtrls $141,168 $0 $253,667 $0 $254,167 2013 4DP7 Federal Pass-Thru Resurfacing, Divided System 3 New Project/Phase D05-Wet Location Crashes using 100% 4DP7<br />
FHWA 5 93517 CO CO Mtrls $84,973 2013 4DP7 Federal Pass-Thru Resurfacing, Divided System 3 A0987<br />
FHWA 5 93517 CO CO Mtrls $27,526 2013 4DP7 Federal Pass-Thru Resurfacing, Divided System 3 A0987<br />
FHWA 6 13034 FRA SGNL PHASE B FRA<br />
Columbus Signalization Phase B (previously was called 11) will<br />
connect up to 300 City <strong>of</strong> Columbus and approximately 25<br />
Franklin County traffic signals to a new central traffic control<br />
system. The project will install fiber optic cable and use<br />
wireless te<br />
Majority <strong>of</strong> locations in Columbus, also<br />
in FRA County, Grandview Heights,<br />
Upper Arlington, and Marble Cliff.<br />
LCATS (NNA) dated May 29,<br />
2012<br />
COLUMBUS MORPC CO CO Contr $7,120,000 $0 $10,350,000 $2,499,918 $12,974,918 2013 4TB7 Federal Signals L400 CMAQ 9 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold T-8-12 A0988<br />
FHWA 6 13034 CO CO Contr $2,289,090 2013 LNTP Local Match Signals 002 Local Match 9 CO Air Quality Exempt A0988<br />
FHWA 6 13034 CO CO Engr $940,910 2013 LNTP Local Match Signals 002 Local Match 9 CO Air Quality Exempt A0988<br />
FHWA 6 16707 MAD TR 24 02.750 MAD<br />
REPLACEMENT OF DEFICIENT NARROW STRUCTURE OVER<br />
LITTLE DARBY CREEK.<br />
PIKE TOWNSHIP. TR24 (ROSEDALE-<br />
PLAIN CITY ROAD) 0.20 MILES EAST OF<br />
SR-38.<br />
MADISON COUNTY ENGINEER PE Dtl Dsgn $128,345 $0 $198,600 $0 $1,985,600 2015 4B87 Federal Bridge Replacement 0 New Project/Phase New Project A0989<br />
FHWA 6 16707 PE Dtl Dsgn $6,755 2015 4BG7 Local Match Bridge Replacement 002 Local Match 0 A0989<br />
FHWA 6 16707 PE Env PE $50,000 2013 4B87 Federal Bridge Replacement ISTE ISTEA - Interstate Surface <strong>Transportation</strong> 0 Effecienty Act <strong>of</strong> 1991<br />
A0989<br />
FHWA 6 22937 FAY SR 753 12.87 FAY<br />
Extension <strong>of</strong> SR 753 from the existing terminus at US 22 to a<br />
point south <strong>of</strong> SR 38 on US 62.Consultant Project Manager:<br />
Andy Shahan<br />
WASHINGTON COURT HOUSE, UNION<br />
TWP.<br />
FAYETTE COUNTY ENGINEER CO CO Contr $2,288,800 $0 $5,333,900 $2,112,473 $7,447,373 2013 4PF7 Federal New Construction L20E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 6 82073 CO CO Engr $52,698 2013 LABR Local Match Resurfacing, Undivided System 002 Local Match 6 A0992<br />
FHWA 6 82073 CO CO Engr $42,418 2013 LABR Federal Resurfacing, Undivided System L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 6 91068 CO CO Engr $80,000 2013 LABR Federal Culvert Construction/Reconstr/Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 7 77247 MOT IR 75 12.00 MOT<br />
FHWA 7 83922<br />
AUG SR 274/364<br />
0.00/5.71<br />
AUG<br />
RECONSTRUCTION OF THE DAYTON DOWNTOWN CORE AREA,<br />
WORK TO INCLUDE PROVIDING THREE CONTINUOUS LANES.<br />
PHASE 2.<br />
Resurface the existing roadway,and add 2' berm stabilization<br />
left and right along with other roadway related items.Bridge:<br />
Remove existing 2 1/2-3 inches <strong>of</strong> wearing surfact and<br />
waterpro<strong>of</strong>ing replacing with asphalt overlay with<br />
waterpro<strong>of</strong>ing. Also remove &<br />
FROM STATION 299+00 TO STATION<br />
342+00 ON IR75.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
ODOT SPONSORING AGENCY MVRPC RW Acquis $2,300,000 $2,025,300 $14,328,701 $184,033,008 2013 4BD7 State New Construction 002 State Funds (S,O) 1<br />
SR 274 MER/AUG CL (SLM 0.00) to WCL<br />
<strong>of</strong> New Bremen (SLM 3.15), SR364 fr JCT<br />
ODOT SPONSORING AGENCY<br />
<strong>of</strong> SR 274 (5.71) to JCT <strong>of</strong> SR219 (SLM<br />
9.72) SFN 0603392<br />
CO CO Contr $721,800 $0 $1,947,291 $0 $1,948,291 2013 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 7 Revised Other<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
CO Air Quality<br />
Nonexempt<br />
New Project/Phase Added new sub-phase 100% State MN MVRPC TIP Amendment # 10 A1011<br />
Scope changed due to addition <strong>of</strong> bridge work<br />
along with a 3% funding increase<br />
FHWA 7 83922 CO CO Contr $453,600 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 7 88561 MIA SR 55/66 13.36/1.51 MIA<br />
Miami SR 55, berm stabilization and Miami SR 66 resurfacing <strong>of</strong><br />
the existing roadway. Remove asphalt wearing surface on box<br />
beam bridge, waterpro<strong>of</strong> and overlay with asphalt.<br />
MIA SR 55 fr E CL <strong>of</strong> Troy to<br />
Sidney/Casstown Rd SLM 15.30,MIA SR<br />
66 fr NCL <strong>of</strong> Piqua to MIA/SHE CL SLM<br />
4.38 MIA 55 1533 SFN 5501563<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
ODOT SPONSORING AGENCY MVRPC CO CO Contr $494,508 $0 $931,438 $0 $932,438 2014 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 7 93176 MOT SR 741 5.52 MOT<br />
Replace Deteriorated concrete slab bridge with new bridge deck SFN 5710448 MOT 741 0552 Tributary<br />
and substructure. Minimal approach work.<br />
over Great Miami River<br />
ODOT SPONSORING AGENCY MVRPC PE Dtl Dsgn $24,000 $0 $0 $0 $350,400 2013 4PF7 Federal Bridge Replacement L24E STP FLEXIBLE New Project/Phase New Project MVRPC TIP Amendment # 9 A1033<br />
FHWA 7 93176 PE Dtl Dsgn $6,000 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) A1033<br />
FHWA 7 93176 PE Env PE $32,000 2013 4PF7 Federal Bridge Replacement L24E STP FLEXIBLE A1033<br />
FHWA 7 93176 PE Env PE $8,000 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) A1033<br />
FHWA 7 93196 MIA IR 75 0.00 MIA Priority System Crack sealing the existing pavement.<br />
MIA IR 75 SLM 0.00 to 4.92; MOT IR 75<br />
ODOT SPONSORING AGENCY<br />
18.24 to 24.42<br />
MVRPC CO CO Contr $344,610 $0 $421,190 $0 $422,190 2014 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L01E INTERSTATE MAINTENANCE 11 New Project/Phase New Project MVRPC TIP Amendment #9 A1034<br />
FHWA 7 93196 CO CO Contr $38,290 2014 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 11 A1034<br />
FHWA 7 93196 CO CO Engr $34,461 2014 LABR Federal Minor Rehabilitation - Pavement Prmy Sys L01E INTERSTATE MAINTENANCE 11 A1034<br />
FHWA 7 93196 CO CO Engr $3,829 2014 LABR Local Match Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 11 A1034<br />
FHWA 7 93200 MOT SR 4 16.53 MOT<br />
Work shall consist <strong>of</strong> pavement planing and resurfacing with<br />
asphalt concrete.Urban Paving Program<br />
Fom SLM 16.53 (Patterson Street) to<br />
SLM 17.06 (Keowee Street)<br />
ODOT SPONSORING AGENCY MVRPC CO CO Contr $199,080 $0 $273,735 $0 $274,735 2014 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L24E STP FLEXIBLE 1 New Project/Phase New Project MVRPC TIP Amendment #9 A1035<br />
FHWA 7 93200 CO CO Contr $49,770 2014 4BG7 Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 1 A1035<br />
FHWA 7 93200 CO CO Engr $19,908 2014 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys L24E STP FLEXIBLE 1 A1035<br />
FHWA 7 93200 CO CO Engr $4,977 2014 LABR Local Match Minor Rehabilitation - Pavement Gnrl Sys 002 Local Match 1 A1035<br />
FHWA 7 93206<br />
MOT US40/IR70<br />
18.83/1.06<br />
MOT<br />
Remove and replace existing microsilica and latex modified<br />
concrete deck overlays.<br />
SFN 5703484 MOT 1883 over Chessie<br />
SYS RR; SFN 5704685 MOT 70 0106<br />
(Number Nine Road)<br />
ODOT SPONSORING AGENCY MVRPC CO CO Contr $149,109 $0 $284,758 $0 $285,758 2014 4PF7 Federal Bridge Repair L01E INTERSTATE MAINTENANCE New Project/Phase New Project MVRPC TIP Amendment #9 A1036<br />
FHWA 7 93206 CO CO Contr $74,555 2014 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM A1036<br />
FHWA 7 93206 CO CO Contr $18,639 2014 4PS7 State Bridge Repair 002 State Funds (S,O) A1036<br />
FHWA 7 93206 CO CO Contr $16,568 2014 4PS7 State Bridge Repair 002 State Funds (S,O) A1036<br />
FHWA 7 93206 CO CO Engr $14,911 2014 LABR Federal Bridge Repair L01E INTERSTATE MAINTENANCE A1036<br />
FHWA 7 93206 CO CO Engr $7,455 2014 LABR Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM A1036<br />
FHWA 7 93206 CO CO Engr $1,864 2014 LABR State Bridge Repair 002 State Funds (S,O) A1036<br />
FHWA 7 93206 CO CO Engr $1,657 2014 LABR State Bridge Repair 002 State Funds (S,O) A1036<br />
FHWA 7 93231<br />
MOT Gateway<br />
Enhancement PH II<br />
MOT<br />
Construct a City <strong>of</strong> Centerville signage wall, Mercedes-Benz <strong>of</strong><br />
Centerville vehicle display area, flagpoles, decorative fencing,<br />
decorative columns and landscaping.<br />
Northeast corner <strong>of</strong> SR 48 I-675 CENTERVILLE MVRPC CO CO Contr $110,720 $0 $304,480 $0 $305,480 2014 4TC7 Federal Landscaping New Project/Phase New Project MVRPC TIP Amendment 9 A1037<br />
FHWA 7 93231 CO CO Contr $110,720 2014 4TA7 Federal Landscaping A1037<br />
FHWA 7 93231 CO CO Contr $27,680 2014 LNTP Local Match Landscaping LNTP Non Traditional Local Match A1037<br />
FHWA 7 93231 CO CO Contr $27,680 2014 LNTP Local Match Landscaping LNTP Non Traditional Local Match A1037<br />
FHWA 7 93231 CO CO Engr $11,072 2014 4TC7 Federal Landscaping A1037<br />
FHWA 7 93231 CO CO Engr $11,072 2014 4TA7 Federal Landscaping A1037<br />
FHWA 7 93231 CO CO Engr $2,768 2014 LNTP Local Match Landscaping LNTP Non Traditional Local Match A1037<br />
FHWA 7 93231 CO CO Engr $2,768 2014 LNTP Local Match Landscaping LNTP Non Traditional Local Match A1037<br />
FHWA 7 93234 MOT Salem Ave Brdg TE MOT<br />
To add amenities (such as statues, plaaques, lighting, etc.) to<br />
the Salem Avenue Bridge as a tribute to the late Ambassador<br />
Richard Holbrooke.<br />
Salem Avenue Bridge over the Great<br />
Miami River<br />
DAYTON MVRPC CO CO Contr $264,000 $0 $363,000 $0 $364,000 2015 4TC7 Federal Design Aesthetics L22E STP ENHANCEMENT New Project/Phase New Project MVRPC TIP Amendment 9 A1038<br />
FHWA 7 93234 CO CO Contr $66,000 2015 LNTP Local Match Design Aesthetics LNTP Non Traditional Local Match A1038<br />
FHWA 7 93234 CO CO Engr $26,400 2015 4TC7 Federal Design Aesthetics L22E STP ENHANCEMENT A1038<br />
FHWA 7 93234 CO CO Engr $6,600 2015 LNTP Local Match Design Aesthetics LNTP Non Traditional Local Match A1038<br />
FHWA 7 93240<br />
MIA Troy Downtown<br />
Streetscape 3B<br />
MIA<br />
Streetscape inclused decorative pavers, new sidewalk, curb<br />
bump-outs, ADA ramps, new curbs, pavement and underground Troy Downtown Streetscape Ph 3B<br />
electric with decorative light poles.<br />
TROY MVRPC CO CO Contr $337,504 $0 $700,480 $0 $701,480 2015 LNTP Local Match Environmental/Scenic LNTP Non Traditional Local Match New Project/Phase New Project MVRPC TIP Amendment # 10 A1039<br />
FHWA 7 93240 CO CO Contr $299,296 2015 4TC7 Federal Environmental/Scenic L22E STP ENHANCEMENT A1039<br />
FHWA 7 93240 CO CO Engr $63,680 2015 LNTP Local Match Environmental/Scenic LNTP Non Traditional Local Match A1039<br />
FHWA 7 93246<br />
MOT Upper Wolf Creek<br />
Bikeway<br />
MOT Pavement repairs and asphalt overlay <strong>of</strong> existing bikeway.<br />
Wolf Creek Bikeway from the<br />
Montgomery/Preble County line to<br />
Albert Street in Brookville<br />
Five Rivers Metroparks District MVRPC CO CO Contr $226,028 $0 $310,785 $0 $311,785 2014 4TC7 Federal Bikeways L22E STP ENHANCEMENT New Project/Phase New Project MVRPC TIP 11 A1040<br />
FHWA 7 93246 CO CO Contr $56,507 2014 LNTP Local Match Bikeways LNTP Non Traditional Local Match A1040<br />
FHWA 7 93246 CO CO Engr $22,600 2014 4TC7 Federal Bikeways L22E STP ENHANCEMENT A1040<br />
FHWA 7 93246 CO CO Engr $5,650 2014 LNTP Local Match Bikeways LNTP Non Traditional Local Match A1040<br />
FHWA 7 93260 MOT IR 75 7.76 MOT<br />
Overlay bridge deck with latex modified concrete, and raise<br />
superstructure to meet required vertical clearance.<br />
SFN 5706939 MOT IR 75 0776 East River<br />
ODOT SPONSORING AGENCY<br />
Road over IR 75.<br />
MVRPC CO CO Contr $658,737 $0 $805,123 $0 $891,123 2014 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM New Project/Phase New Project MVRPC TIP Amendment #9 A1041<br />
FHWA 7 93260 CO CO Contr $73,193 2014 4PS7 State Bridge Repair 002 State Funds (S,O) A1041<br />
FHWA 7 93260 CO CO Engr $65,874 2014 LABR Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM A1041<br />
FHWA 7 93260 CO CO Engr $7,319 2014 LABR State Bridge Repair 002 State Funds (S,O) A1041<br />
FHWA 7 93260 MOT IR 75 7.76 MOT<br />
Overlay bridge deck with latex modified concrete, and raise<br />
superstructure to meet required vertical clearance.<br />
SFN 5706939 MOT IR 75 0776 East River<br />
ODOT SPONSORING AGENCY<br />
Road over IR 75.<br />
MVRPC PE Dtl Dsgn $54,000 $0 $0 $0 $891,123 2013 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM New Project/Phase New Project MVRPC Amendment #9 A1041<br />
FHWA 7 93260 PE Dtl Dsgn $6,000 2013 4PS7 State Bridge Repair 002 State Funds (S,O) A1041<br />
FHWA 7 93260 PE Env PE $22,500 2013 4PF7 Federal Bridge Repair L1CE BRIDGE 85% ON/OFF SYSTEM A1041<br />
FHWA 7 93260 PE Env PE $2,500 2013 4PS7 State Bridge Repair 002 State Funds (S,O) A1041<br />
FHWA 7 93318 MOT IR 75 11.64 E MOT<br />
Replace deficient bridge deck with minimal approach<br />
transitions. Structure part <strong>of</strong> I75/US35 interchange. Project to<br />
remove structural and functional deficiencies. (Co-ordinate<br />
SFN 5707404 MOT 75 1164E on Albany<br />
Street Ramp (IR 75 North - US 35 East)<br />
ODOT SPONSORING AGENCY MVRPC CO CO Contr $1,159,218 $0 $1,416,822 $0 $1,617,822 2015 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE New Project/Phase New Project MVRPC TIP Amendment #10 A1042<br />
work with PID 86675 MOT 75 11.74)<br />
FHWA 7 93318 CO CO Contr $128,802 2015 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) A1042<br />
FHWA 7 93318 CO CO Engr $115,922 2015 LABR Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE A1042<br />
FHWA 7 93318 CO CO Engr $12,880 2015 LABR State Bridge Deck Replacement 002 State Funds (S,O) A1042<br />
FHWA 7 93318 MOT IR 75 11.64 E MOT<br />
Replace deficient bridge deck with minimal approach<br />
transitions. Structure part <strong>of</strong> I75/US35 interchange. Project to<br />
remove structural and functional deficiencies. (Co-ordinate<br />
SFN 5707404 MOT 75 1164E on Albany<br />
Street Ramp (IR 75 North - US 35 East)<br />
ODOT SPONSORING AGENCY MVRPC PE Dtl Dsgn $112,500 $0 $0 $0 $1,617,822 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE New Project/Phase New Project MVRPC TIP Amendment # 10 A1042<br />
work with PID 86675 MOT 75 11.74)<br />
FHWA 7 93318 PE Dtl Dsgn $12,500 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) A1042<br />
FHWA 7 93318 PE Env PE $67,500 2013 4PF7 Federal Bridge Deck Replacement L01E INTERSTATE MAINTENANCE A1042<br />
FHWA 7 93318 PE Env PE $7,500 2013 4PS7 State Bridge Deck Replacement 002 State Funds (S,O) A1042<br />
FHWA 7 93389 D07 Systematic GR FY 13 D07 Districtwide Systematic Guardrail End Terminal Upgrade.<br />
Districtwide Systematic Guardrail End<br />
Terminal Upgrade to upgrade non-<br />
ODOT SPONSORING AGENCY<br />
crashworthy guardrail end terminals on<br />
the Interstate System<br />
MVRPC CO CO Contr $312,000 $0 $660,000 $0 $661,000 2013 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 New Project/Phase New Project MVRPC TIP Amendment # 10 A1043<br />
FHWA 7 93389 CO CO Contr $258,000 2013 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93389 CO CO Contr $24,000 2013 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93389 CO CO Contr $6,000 2013 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93389 CO CO Engr $31,200 2013 LABR Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93389 CO CO Engr $25,800 2013 LABR Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93389 CO CO Engr $2,400 2013 LABR Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 62 A1043<br />
FHWA 7 93398 CHP/CLA VAR/VAR CHP<br />
Field pave invert <strong>of</strong> steel culverts with concrete.SFN 1100947<br />
Tributary to Buck CreekSFN 1101013 Tributary to Treacle<br />
CreekSFN 1102990 on Branch <strong>of</strong> Darby CreekSFN 1206532 on<br />
Warden Ditch<br />
SFN 1100947 CHP 36 2157; SFN<br />
1101013 CHP 36 2327;SFN 1102990 CHP<br />
559 0895; SFN 1206532 CLA 675 0102;<br />
ODOT SPONSORING AGENCY CCSTS CO CO Contr $48,283 $0 $161,926 $0 $162,926 2014 4PF7 Federal Bridge Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 7 93398 CO CO Engr $4,475 2014 LABR Federal Bridge Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 7 93629 MER US 127 4.00 MER<br />
FHWA 7 93635<br />
D07 Micro Diamond<br />
Grinding<br />
D07<br />
Grind an 16" wide centerline rumble strip from mile marker<br />
4.00 to 9.00<br />
Micro diamond grinding in Clark County on IR 675 and IR 70<br />
ramps on the south side <strong>of</strong> IR 70 - ramp from IR 675 SF to IR 70<br />
EB and the ramp from IR 70 EB to IR 675 NB. Auglaize County<br />
IR 75 SB to US 33 WB and US 33 EB to IR 75 NB<br />
MER 127 mile marker 4.00 to<br />
milemarker 9.00<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
ODOT SPONSORING AGENCY CO Oth Remb $5,800 $0 $5,800 $0 $6,800 2013 4BC7 State Rumble Strips 002 State Funds (S,O) 5 New Project/Phase New Project A1056<br />
CLA Ramp from IR 675 SB to IR 70 EB<br />
and the ramp from IR 70 EB to IR 675<br />
ODOT SPONSORING AGENCY<br />
NB;AUG IR75 SB to 33 WB & 33 EB to IR<br />
75 NB<br />
CO Oth Remb $24,888 $0 $24,888 $0 $25,888 2013 4BC7 State Spot Safety 002 State Funds (S,O) New Project/Phase New Project A1057<br />
FHWA 7 93735<br />
D07 SRTS DAR Versailles<br />
Infra<br />
DAR<br />
Installing pedestrian signal heads, pedestal poles, conduit, wire,<br />
Versailles End <strong>of</strong> radius on all 4 corners<br />
and pull boxes at four intersections within the Village <strong>of</strong><br />
<strong>of</strong> each <strong>of</strong> four intersection: Main &<br />
Versailles. Pavement, sidewalk, curb ramp, and pavement<br />
Versailles, Village <strong>of</strong><br />
West, Main & Center, Center & Wood,<br />
marking restoration will be included.SR 185 (Center Street)SR 47<br />
& Center & Ward<br />
(Main S<br />
CO CO Contr $223,000 $0 $245,300 $0 $262,760 2014 4SC7 Federal S.R.T.S School Travel Plan LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New Project A1058<br />
FHWA 7 93735 CO CO Engr $22,300 2014 4SC7 Federal S.R.T.S School Travel Plan LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE A1058<br />
FHWA 7 93735<br />
FHWA 7 93738<br />
FHWA 7 93739<br />
D07 SRTS DAR Versailles<br />
Infra<br />
D07 SRTS AUG Wapak<br />
Non-Infra<br />
D07 SRTS AUG Wapak<br />
Infrastructur<br />
DAR<br />
Installing pedestrian signal heads, pedestal poles, conduit, wire,<br />
and pull boxes at four intersections within the Village <strong>of</strong><br />
Versailles. Pavement, sidewalk, curb ramp, and pavement<br />
marking restoration will be included.SR 185 (Center Street)SR 47<br />
(Main S<br />
Versailles End <strong>of</strong> radius on all 4 corners<br />
<strong>of</strong> each <strong>of</strong> four intersection: Main &<br />
West, Main & Center, Center & Wood,<br />
& Center & Ward<br />
Versailles, Village <strong>of</strong> PE Dtl Dsgn $16,460 $0 $0 $262,760 2013 4SC7 Federal S.R.T.S School Travel Plan LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New Project A1058<br />
AUG Provide programs and events such as a walking club. Wapakoneta Wapakoneta, City <strong>of</strong> OTH Oth Remb $2,000 $0 $2,000 $0 $3,000 2014 4SC7 Federal S.R.T.S Education & Encouragement LU1E SAFE ROUTES TO SCHOOL PROGR<strong>AM</strong> New Project/Phase New Project A1059<br />
AUG<br />
Install sidewalk with curb and gutter and ADA curb ramps along<br />
Gardenia Avenue, Warren Avenue, Carnation Drive, Poppy<br />
Drive, Primrose Drive, Magnolia Drive and Laurel Drive.<br />
In Wapakoneta Auglaize County<br />
Carnation Street: Defiance Street to<br />
Gardenia Avenue<br />
Wapakoneta, City <strong>of</strong> CO CO Contr $475,000 $0 $475,000 $0 $476,000 2014 4SC7 Federal S.R.T.S School Travel Plan LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New Project A1060<br />
FHWA 8 75645 H<strong>AM</strong> US 22 7.38 H<strong>AM</strong><br />
Repair Bridge No. H<strong>AM</strong>-22-0740, SFN: 3100871. Bridge carries From 1.1 miles north <strong>of</strong> SR 562 to 1.15<br />
US 22 over I.O. Railroad.<br />
miles north <strong>of</strong> SR 562.<br />
ODOT SPONSORING AGENCY OKI CO CO Contr $240,000 $0 $330,000 $234,731 $565,731 2013 4PF7 Federal Bridge Maintenance L1C0 BRIDGE 85% ON/OFF CO Air Quality Exempt New Project/Phase move project into FY13 from FY16 OKI TIP Amendment # 8 A1061<br />
FHWA 8 75645 CO CO Contr $60,000 2013 4PS7 State Bridge Maintenance 002 State Funds (S,O) CO Air Quality Exempt A1061<br />
FHWA 8 75645 CO CO Engr $24,000 2013 LABR Federal Bridge Maintenance L1C0 BRIDGE 85% ON/OFF CO Air Quality Exempt A1061<br />
FHWA 8 75645 CO CO Engr $6,000 2013 LABR State Bridge Maintenance 002 State Funds (S,O) CO Air Quality Exempt A1061<br />
FHWA 8 75909 D08 PPS FY2013 D08<br />
District-wide priority system preventive maintenance project.<br />
FY 2013. Approx. 14 lane miles<br />
Various routes to be selected. DISTRICT 8 PRODUCTION CO CO Contr $634,500 $0 $775,500 $0 $775,500 2013 4PF7 Federal Preventive Maintenance CO Air Quality Exempt New Project/Phase added project OKI TIP Amendment # 8 A1062<br />
FHWA 8 75909 CO CO Contr $70,500 2013 4PS7 State Preventive Maintenance CO Air Quality Exempt A1062<br />
FHWA 8 75909 CO CO Engr $63,450 2013 LABR Federal Preventive Maintenance CO Air Quality Exempt A1062<br />
FHWA 8 75909 CO CO Engr $7,050 2013 LABR State Preventive Maintenance CO Air Quality Exempt A1062<br />
FHWA 8 76289 CLE IR 275 10.15 CLE<br />
Reconstruct the interchange <strong>of</strong> IR275/SR32 to accommodate 20<br />
year projected traffic. This will include work on SR32. Phase 1<br />
construction+Eastgate structure and Phase 1&2 right <strong>of</strong> way.<br />
Approximately 1.5 miles north <strong>of</strong> SR32<br />
to 1.0 miles south <strong>of</strong> SR32<br />
ODOT SPONSORING AGENCY OKI CO CO Contr $37,700,000 $0 $44,267,500 $33,832,487 $82,122,987 2014 7BDB Bonds Major Reconstruction 042 Bond Funds (1997+) 5<br />
FHWA 8 76289 CO CO Engr $5,517,000 2014 LABR Federal Major Reconstruction H010 INTERSTATE MAINTENANCE 5<br />
CO Air Quality<br />
Nonexempt<br />
FHWA 8 76289 CO CO Engr $613,000 2014 LABR State Major Reconstruction 002 State Funds (S,O) 5<br />
CO Air Quality<br />
Nonexempt<br />
FHWA 8 76289 CO CO Engr $350,000 2014 4TA7 Federal Major Reconstruction L230 URBANIZED AREAS 5<br />
CO Air Quality<br />
Nonexempt<br />
FHWA 8 76289 CO CO Engr $87,500 2014 4BD7 State Major Reconstruction 002 State Funds (S,O) 5<br />
CO Air Quality<br />
Nonexempt<br />
FHWA 8 81769 BUT US 27 14.16 BUT<br />
Widen mainline US 27 to preferred design standards including<br />
increased shoulder width, horizontal and vertical curvature<br />
considerations, lane width deficiencies, and need for center<br />
turn lane provision at all major access points; upgrade<br />
signalized inters<br />
Stillwell-Beckett Road to Chestnut<br />
Street<br />
CO Air Quality<br />
Nonexempt<br />
Revised Funding Moved OKI funding to PID 92502 OKI TIP Amendment # 9 A1063<br />
OXFORD; CITY OF OKI CO CO Contr $6,660,000 $0 $7,557,834 $1,360,866 $11,008,700 2014 4R47 Federal Major Widening LY20 HI PRI SEC 1702 4 CO Air Quality Exempt Revised Funding funding revision OKI TIP Amendment # 9 A1064<br />
FHWA 8 81769 CO CO Contr $140,334 2014 4R47 Federal Major Widening LY60 HI PRI SEC 112 4 CO Air Quality Exempt A1064<br />
FHWA 8 81769 CO CO Engr $560,000 2014 LABR Federal Major Widening LY20 HI PRI SEC 1702 4 CO Air Quality Exempt A1064<br />
FHWA 8 81769 CO CO Engr $150,000 2014 LABR Federal Major Widening L05E NATIONAL HIGHWAY SYSTEM 4 CO Air Quality Exempt A1064<br />
FHWA 8 81769 CO CO Engr $37,500 2014 LABR Local Match Major Widening 002 Local Match 4 CO Air Quality Exempt A1064<br />
FHWA 8 81769 CO CO Engr $8,000 2014 4R47 Federal Major Widening LY20 HI PRI SEC 1702 4 CO Air Quality Exempt A1064<br />
FHWA 8 81769 CO CO Engr $2,000 2014 4BG7 Local Match Major Widening 002 Local Match 4 CO Air Quality Exempt A1064<br />
FHWA 8 83823 D08 GPS FY2013 D08<br />
District Wide preventative maintenance on the general system<br />
for FY2013. Approx. 32 lane miles.<br />
routes to be determined ODOT SPONSORING AGENCY OKI CO CO Contr $1,442,720 $0 $1,983,740 $0 $1,983,740 2013 4PF7 Federal Preventive Maintenance New Project/Phase added project OKI TIP Amendment # 8 A1065<br />
FHWA 8 83823 CO CO Contr $360,680 2013 4PS7 State Preventive Maintenance A1065<br />
FHWA 8 83823 CO CO Engr $144,272 2013 LABR Federal Preventive Maintenance A1065<br />
FHWA 8 83823 CO CO Engr $36,068 2013 LABR State Preventive Maintenance A1065<br />
FHWA 8 84222<br />
GRE New Germany<br />
Trebein Road<br />
GRE<br />
Reconstruction <strong>of</strong> New Germany-Trebein Road from Golf<br />
Course Drive to .13 mi. east <strong>of</strong> Wyndham Drive to correct the<br />
existing substandard pavement width and to improve sight<br />
distance by widening to three lanes.<br />
From Golf course Drive to .13 mi. east<br />
<strong>of</strong> Wyndham Drive<br />
BEAVERCREEK MVRPC CO CO Contr $1,100,000 $0 $2,161,000 $0 $2,161,000 2013 4TA7 Federal Minor Widening L230 URBANIZED AREAS Revised Funding Cost Increase Above Threshold MVRPC TIP Amendment # 11 A1066<br />
FHWA 8 84222 CO CO Contr $590,000 2013 LNTP Local Match Minor Widening LNTP Non Traditional Local Match A1066<br />
FHWA 8 84222 CO CO Contr $275,000 2013 LNTP Local Match Minor Widening LNTP Non Traditional Local Match A1066<br />
FHWA 8 84222 CO CO Engr $196,000 2013 LNTP Local Match Minor Widening LNTP Non Traditional Local Match A1066<br />
FHWA 8 84610 CLE SR 28 8.52 CLE<br />
Replace or rehabilitate bridge CLE-28-0854 over O'Bannon<br />
Creek.<br />
SR 28: from 0.10 to 0.02 miles west <strong>of</strong><br />
SR 132.<br />
DISTRICT 8 PRODUCTION OKI CO CO Contr $800,000 $0 $1,190,500 $193,179 $1,384,679 2014 4PF7 Federal Bridge Replacement L24E STP FLEXIBLE New Project/Phase Add new project OKI TIP Amendment # 8 A1067<br />
FHWA 8 84610 CO CO Contr $200,000 2014 4PS7 State Bridge Replacement 002 State Funds (S,O) A1067<br />
FHWA 8 84610 CO CO Engr $148,400 2014 LABR Federal Bridge Replacement L24E STP FLEXIBLE A1067<br />
FHWA 8 84610 CO CO Engr $37,100 2014 LABR State Bridge Replacement 002 State Funds (S,O) A1067<br />
FHWA 8 84610 CO CO Engr $5,000 2014 4PS7 State Bridge Replacement 002 State Funds (S,O) A1067<br />
FHWA 8 87762 CLE SR 28 6.80 CLE Widen for westbound left turn lane to Charles Snyder Road.<br />
0.06 miles west <strong>of</strong> Charles Snyder Road<br />
to 0.09 miles east <strong>of</strong> Charles Snyder<br />
Road<br />
ODOT SPONSORING AGENCY OKI CO CO Contr $410,000 $0 $601,000 $0 $601,000 2013 4DP7 Federal Pass-Thru Turn Lane Addition 0 Revised Funding Cost Increase Above Threshold OKI 5/10/12 A1068<br />
FHWA 8 87762 CO CO Contr $150,000 2013 4BG7 Local Match Turn Lane Addition 002 Local Match 0 A1068<br />
FHWA 8 87762 CO CO Engr $26,000 2013 LABR Federal Turn Lane Addition LS3E HSIP - HWY SAFETY IMPR 0 A1068<br />
FHWA 8 87762 CO CO Engr $15,000 2013 LABR Local Match Turn Lane Addition 002 Local Match 0 A1068<br />
FHWA 8 89179<br />
WAR<br />
MasonMont/Bethany<br />
Roundabout<br />
WAR<br />
Project involves improving the intersection by constructing a<br />
two-lane roundabout with two lane approaches and departures,<br />
curb and gutter, storm sewers, bike path, sidewalk, a culvert<br />
replacement, and necessary utility relocation.<br />
Intersection <strong>of</strong> Bethany & Mason-<br />
Montgomery Roads: 750' on all four<br />
approaches to the intersection.<br />
MASON OKI CO CO Contr $1,717,600 $0 $2,670,000 $0 $2,920,000 2013 4TB7 Federal Intersection Improvement L40E CMAQ 1 Revised Funding Cost Increase Above Threshold OKI TIP Amendment # 8 A1069<br />
FHWA 8 89179 CO CO Contr $429,400 2013 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 1 A1069<br />
FHWA 8 89179 CO CO Contr $323,000 2013 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 1 A1069<br />
FHWA 8 89179 CO CO Engr $200,000 2013 LNTP Local Match Intersection Improvement LNTP Non Traditional Local Match 1 A1069<br />
FHWA 8 90716<br />
H<strong>AM</strong> CR 235 3.80 Sharon<br />
Rd Enhanc<br />
H<strong>AM</strong><br />
Project includes transportation enhancements to East Sharon<br />
Road including clay paver sidewalks, reconstruction <strong>of</strong> curbs<br />
and commercial drive aprons, ADA curb ramps, decorative<br />
signing and lighting, seating benches, bike racks, trash<br />
recepticles and other<br />
East Sharon Road: from 375 west <strong>of</strong><br />
GLENDALE OKI CO CO Contr $240,000 $0 $327,702 $0 $327,702 2013 4TC7 Federal Landscaping L22E STP ENHANCEMENT 0 New Project/Phase New Project OKI TIP Amendment # 8 A1070<br />
Greenville Avenue to Greenville Avenue<br />
FHWA 8 90716 CO CO Contr $60,000 2013 4BG7 Local Match Landscaping 002 Local Match 0 A1070<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 16 <strong>of</strong> 25<br />
A1063<br />
A1063<br />
A1063<br />
A1063
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 8 90716 CO CO Engr $22,162 2013 LABR Federal Landscaping L22E STP ENHANCEMENT 0 A1070<br />
FHWA 8 90716 CO CO Engr $5,540 2013 LABR Local Match Landscaping 002 Local Match 0 A1070<br />
FHWA 8 90791<br />
GRE CR 97 3.87 Bellbrook<br />
Resurfa<br />
GRE<br />
Project will improve the roadway by resurfacing the existing<br />
pavement surface. Pavement will be milled 2in in the existing 2- Wilmington-Dayton Rd: from Centerville<br />
BELLBROOK<br />
lane section <strong>of</strong> roadway, and 3.5in in the 3 and 4-lane sections. Station Road to SR-725<br />
The existing loop detectors at the southern leg <strong>of</strong> the SR-725 int<br />
MVRPC CO CO Contr $208,587 $0 $286,807 $0 $286,807 2013 4TA7 Federal Mill and Fill L23E STP URBANIZED AREAS 1 New Project/Phase MVRPC approved TIP Page 70 N/A A1071<br />
FHWA 8 90791 CO CO Contr $52,147 2013 4BG7 Local Match Mill and Fill 002 Local Match 1 A1071<br />
FHWA 8 90791 CO CO Engr $20,858 2013 LABR Federal Mill and Fill L23E STP URBANIZED AREAS 1 A1071<br />
FHWA 8 90791 CO CO Engr $5,215 2013 LABR Local Match Mill and Fill 002 Local Match 1 A1071<br />
FHWA 8 91060 H<strong>AM</strong> CR 4 3.96 H<strong>AM</strong><br />
Widen Fields Ertel Road to provide a right turn lane to<br />
northbound I-71, restripe Fields Ertel and Mason Montgomery<br />
intersection, widen Gregory for an additional northbound lane<br />
and restripe the Gregory and Fields Ertel intersection. Apply<br />
0.26 miles south <strong>of</strong> the<br />
hamilton/warren county line to 0.28<br />
miles north <strong>of</strong> the county line<br />
ODOT SPONSORING AGENCY OKI PE Dtl Dsgn $286,160 $0 $963,500 $0 $5,932,900 2013 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Add PE Env & Detailed Design OKI TIP Amendment # 8 A1072<br />
access managem<br />
FHWA 8 91060 PE Dtl Dsgn $31,796 2013 4BC7 State Section Improvement 002 State Funds (S,O) 0 A1072<br />
FHWA 8 91060 PE Env PE $580,991 2012 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 0 A1072<br />
FHWA 8 91060 PE Env PE $64,555 2012 4BC7 State Section Improvement 002 State Funds (S,O) 0 A1072<br />
Widen Fields Ertel Road to provide a right turn lane to<br />
northbound I-71, restripe Fields Ertel and Mason Montgomery 0.26 miles south <strong>of</strong> the<br />
FHWA 8 91060 H<strong>AM</strong> CR 4 3.96 H<strong>AM</strong> intersection, widen Gregory for an additional northbound lane hamilton/warren county line to 0.28 ODOT SPONSORING AGENCY OKI RW Acquis $657,000 $0 $0 $0 $5,932,900 2014 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Add RW Phase OKI TIP Amendment # 8 A1072<br />
and restripe the Gregory and Fields Ertel intersection. Apply<br />
access managem<br />
miles north <strong>of</strong> the county line<br />
FHWA 8 91060 RW Acquis $73,000 2014 4BC7 State Section Improvement 002 State Funds (S,O) 0 A1072<br />
FHWA 8 91688<br />
GRE TR247 1.65 Hanes Rd<br />
Br Repl<br />
GRE<br />
Replacement <strong>of</strong> the structurally deficient bridge carrying Hanes<br />
Road over the Fairground Road tributary. Work includes<br />
replacing the structure and associated in-stream work. New<br />
structure will be widened to accomodate three travel lanes,<br />
Hanes Road (TR-247): from<br />
approximately 350 south <strong>of</strong> Kings Gate<br />
Blvd. to Kings Gate Blvd.<br />
BEAVERCREEK MVRPC CO CO Contr $315,040 $0 $630,000 $0 $630,000 2014 4R87 Federal Bridge Replacement L11E BRIDGE 15% OFF SYSTEM 0 New Project/Phase Added project MVRPC TIP Amendment # 11 A1073<br />
shoulders, and a<br />
FHWA 8 91688 CO CO Contr $179,200 2014 LNTP Local Match Bridge Replacement LNTP Non Traditional Local Match 0 A1073<br />
FHWA 8 91688 CO CO Contr $78,760 2014 LNTP Local Match Bridge Replacement LNTP Non Traditional Local Match 0 A1073<br />
FHWA 8 91688 CO CO Engr $57,000 2014 LNTP Local Match Bridge Replacement LNTP Non Traditional Local Match 0 A1073<br />
FHWA 8 92040<br />
WAR IR 75 10.02 New<br />
Ramp C<br />
WAR<br />
Add a new westbound to northbound ramp from SR73 to IR75.<br />
Retime/Reconfigure signal because the left turn from SR73 is no SR73 to 1 mile north <strong>of</strong> SR73<br />
longer needed.<br />
WARREN COUNTY ENGINEER MVRPC CO CO Contr $2,355,262 $0 $3,321,524 $0 $4,222,524 2014 4TA7 Federal Intersection Improvement L23E STP URBANIZED AREAS New Project/Phase new project MVRPC TIP Amendment # 10 A1074<br />
FHWA 8 92040 CO CO Contr $664,305 2014 4BG7 Local Match Intersection Improvement 002 Local Match A1074<br />
FHWA 8 92040 CO CO Engr $235,526 2014 LABR Federal Intersection Improvement L23E STP URBANIZED AREAS A1074<br />
FHWA 8 92040 CO CO Engr $66,431 2014 LABR Local Match Intersection Improvement 002 Local Match A1074<br />
FHWA 8 92040<br />
WAR IR 75 10.02 New<br />
Ramp C<br />
WAR<br />
FHWA 8 92098 CLE Various ITS Phase 2 CLE<br />
Add a new westbound to northbound ramp from SR73 to IR75.<br />
Retime/Reconfigure signal because the left turn from SR73 is no SR73 to 1 mile north <strong>of</strong> SR73<br />
longer needed.<br />
WARREN COUNTY ENGINEER MVRPC RW Acquis $550,000 $0 $0 $4,222,524 2012 4BG7 Local Match Intersection Improvement New Project/Phase New project MVRPC TIP Amendment # 10 A1074<br />
Project includes installation <strong>of</strong> a centralized County Traffic Various intersections in the Eastgate,<br />
Management Center (CTMC) at the CCEO to control 49 existing Business-28, SR-28/US-50/Rivers Edge,<br />
traffic signals, adaptive signal control system at 12 signals in the & Clough Pike/Mt. Carmel Tobasco<br />
Eastgate Retail District and associated detection systems, signa areas in Clermont Co<br />
Clermont County T.I.D. OKI CO CO Contr $1,970,909 $0 $2,710,000 $0 $2,710,000 2013 4TB7 Federal Traffic Management System L40E CMAQ 29 New Project/Phase Programmed 8/18/11 OKI TIP Amendment 5/13/10 A1075<br />
FHWA 8 92098 CO CO Contr $492,727 2013 LNTP Local Match Traffic Management System LNTP Non Traditional Local Match 29 A1075<br />
FHWA 8 92098 CO CO Engr $197,091 2013 4TB7 Federal Traffic Management System L40E CMAQ 29 A1075<br />
FHWA 8 92098 CO CO Engr $49,273 2013 LNTP Local Match Traffic Management System LNTP Non Traditional Local Match 29 A1075<br />
FHWA 8 92502 CLE CR 341 0.17 CLE<br />
Replace and widen Eastgate Blvd bridge and widen approaches<br />
to bridge to accommodate new ramps to/from SR32. Include<br />
improvements to Eastgate North Frontage Road to<br />
accommodate ramp connection for SR32 westbound. Include<br />
ramp construction for west SR32.<br />
0.1 miles south <strong>of</strong> Eastgate Blvd bridge<br />
over SR32 to 0.1 miles north <strong>of</strong> bridge<br />
ODOT SPONSORING AGENCY OKI CO CO Contr $3,420,000 $0 $12,100,000 $0 $12,100,000 2013 4HJ7 Federal Interchange, Reconstruction 0 New Project/Phase added project OKI TIP Amendment # 9 A1076<br />
FHWA 8 92502 CO CO Contr $2,000,000 2013 4TA7 Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Contr $2,000,000 2013 4TA7 Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Contr $1,540,000 2013 4TA7 Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Contr $660,000 2013 4BG7 Local Match Interchange, Reconstruction 002 Local Match 0 A1076<br />
FHWA 8 92502 CO CO Contr $500,000 2013 4BG7 Local Match Interchange, Reconstruction 002 Local Match 0 A1076<br />
FHWA 8 92502 CO CO Contr $500,000 2013 4JC7 State Interchange, Reconstruction 002 State Funds (S,O) 0 A1076<br />
FHWA 8 92502 CO CO Contr $380,000 2013 4BC7 State Interchange, Reconstruction 002 State Funds (S,O) 0 A1076<br />
FHWA 8 92502 CO CO Engr $332,000 2013 LABR Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Engr $235,000 2013 LABR Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Engr $180,000 2013 LABR Federal Interchange, Reconstruction 0 A1076<br />
FHWA 8 92502 CO CO Engr $83,000 2013 LABR State Interchange, Reconstruction 002 State Funds (S,O) 0 A1076<br />
FHWA 8 92502 CO CO Engr $58,750 2013 LABR State Interchange, Reconstruction 002 State Funds (S,O) 0 A1076<br />
FHWA 8 92502 CO CO Engr $20,000 2013 LABR State Interchange, Reconstruction 002 State Funds (S,O) 0 A1076<br />
FHWA 8 92552 BUT SR 4 3.00 BUT Improve Holden Gilmore intersection by adding turn lanes.<br />
0.1 miles north and south <strong>of</strong><br />
Holden/Bilmore intersection<br />
FAIRFIELD OKI CO CO Contr $1,283,850 $0 $1,569,150 $0 $2,552,175 2015 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Added CO phase OKI TIP Amendment #7 A1077<br />
FHWA 8 92552 CO CO Contr $142,650 2015 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1077<br />
FHWA 8 92552 CO CO Engr $128,385 2015 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 A1077<br />
FHWA 8 92552 CO CO Engr $14,265 2015 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1077<br />
FHWA 8 92552 BUT SR 4 3.00 BUT Improve Holden Gilmore intersection by adding turn lanes.<br />
0.1 miles north and south <strong>of</strong><br />
Holden/Bilmore intersection<br />
FAIRFIELD OKI RW Acquis $563,760 $0 $0 $0 $2,552,175 2014 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase Added RW phase OKI TIP Amendment #7 A1077<br />
FHWA 8 92552 RW Acquis $62,640 2014 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1077<br />
FHWA 8 92553 GRE US 42 8.36 GRE Add southbound left turn lane from US42 to Ledbetter.<br />
Ledbetter to 0.12 miles north <strong>of</strong><br />
Ledbetter in Xenia<br />
ODOT SPONSORING AGENCY MVRPC CO CO Contr $397,800 $0 $486,200 $0 $552,831 2014 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase New Project MVRPC TIP Amendment #9 A1078<br />
FHWA 8 92553 CO CO Contr $44,200 2014 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1078<br />
FHWA 8 92553 CO CO Engr $39,780 2014 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 A1078<br />
FHWA 8 92553 CO CO Engr $4,420 2014 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1078<br />
FHWA 8 92554 GRE CR 36 0.27 GRE<br />
Reconfigure lanes on Inidan Ripple Road as they approach the<br />
ramps for IR675. Improve signal timing and phasing at the<br />
ramps.<br />
0.27 miles west <strong>of</strong> IR675 to 0.1 miles<br />
east <strong>of</strong> IR675<br />
BEAVERCREEK MVRPC CO CO Contr $270,900 $0 $331,100 $0 $394,476 2014 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase New Project MVRPC TIP Amendment #9 A1079<br />
FHWA 8 92554 CO CO Contr $30,100 2014 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1079<br />
FHWA 8 92554 CO CO Engr $27,090 2014 4HJ7 Federal Intersection Improvement LS3E HSIP - HWY SAFETY IMPR 0 A1079<br />
FHWA 8 92554 CO CO Engr $3,010 2014 4BG7 Local Match Intersection Improvement 002 Local Match 0 A1079<br />
FHWA 8 92555 H<strong>AM</strong> US 27 14.15 H<strong>AM</strong><br />
Widen northbound US27 for a third lane ending as a right turn<br />
lane at Struble. Part 1 PID 92555; Part 2 PID 84437, to be sold<br />
as one construction project.<br />
0.07 miles north <strong>of</strong> IR275 to Struble<br />
Road (0.61 miles north <strong>of</strong> IR275)<br />
ODOT SPONSORING AGENCY OKI CO CO Contr $1,300,000 $0 $1,430,000 $169,331 $2,581,736 2014 4DP7 Federal Pass-Thru Widening 1 New Project/Phase added CO Phase OKI TIP Amendment #7 A1080<br />
FHWA 8 92555 CO CO Engr $117,000 2014 4HJ7 Federal Widening LS3E HSIP - HWY SAFETY IMPR 1 A1080<br />
FHWA 8 92555 CO CO Engr $13,000 2014 4BC7 State Widening 002 State Funds (S,O) 1 A1080<br />
FHWA 8 92555 H<strong>AM</strong> US 27 14.15 H<strong>AM</strong><br />
Widen northbound US27 for a third lane ending as a right turn<br />
lane at Struble. Part 1 PID 92555; Part 2 PID 84437, to be sold<br />
as one construction project.<br />
0.07 miles north <strong>of</strong> IR275 to Struble<br />
Road (0.61 miles north <strong>of</strong> IR275)<br />
ODOT SPONSORING AGENCY OKI RW Acquis $630,000 $0 $0 $169,331 $2,581,736 2013 4HJ7 Federal Widening LS3E HSIP - HWY SAFETY IMPR 1 New Project/Phase Added RW Phase OKI TIP Amendment #7 A1080<br />
FHWA 8 92555 RW Acquis $70,000 2013 4BC7 State Widening 002 State Funds (S,O) 1 A1080<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 17 <strong>of</strong> 25
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 8 92555 RW RW Serv $47,205 2013 4HJ7 Federal Widening LS3E HSIP - HWY SAFETY IMPR 1 A1080<br />
FHWA 8 92555 RW RW Serv $5,245 2013 4BC7 State Widening 002 State Funds (S,O) 1 A1080<br />
FHWA 8 93100 H<strong>AM</strong> SR 562 1.47 H<strong>AM</strong><br />
Bridge maintenance to structure H<strong>AM</strong>-562-0147 to include spot<br />
painting, steel retr<strong>of</strong>its, and drainage repair.<br />
S.R. 562 from SLM 1.45 to SLM 1.49 ODOT SPONSORING AGENCY CO CO Contr $400,000 $0 $550,000 $0 $550,000 2014 4PF7 Federal Bridge Maintenance L1CE BRIDGE 85% ON/OFF SYSTEM New Project/Phase New project OKI TIP Amendment #7 A1081<br />
FHWA 8 93100 CO CO Contr $100,000 2014 4PS7 State Bridge Maintenance 002 State Funds (S,O) A1081<br />
FHWA 8 93100 CO CO Engr $40,000 2014 4PF7 Federal Bridge Maintenance L1CE BRIDGE 85% ON/OFF SYSTEM A1081<br />
FHWA 8 93100 CO CO Engr $10,000 2014 4PS7 State Bridge Maintenance 002 State Funds (S,O) A1081<br />
FHWA 8 93421 H<strong>AM</strong> US 22 3.54 H<strong>AM</strong><br />
Apply friction treatment to US22-Blair to Victory and Durrell to<br />
Harvard, US27-Raeburn to 550' east <strong>of</strong> Tranquility, SR561-<br />
McLaughlin to Beechmont, SR264-Overlook to Olivia, CR379-<br />
Moon Valley to 550 south <strong>of</strong> Putnam, CR619 400' west to 300'<br />
east <strong>of</strong> LaFueill<br />
US 22 from Blair to Victory and other<br />
routes within Cincinnati<br />
CINCINNATI OKI CO CO Contr $900,000 $0 $1,100,000 $0 $1,100,000 2013 4HJ7 Federal Spot Safety LS3E HSIP - HWY SAFETY IMPR 2 New Project/Phase added project OKI TIP Amendment # 9 A1082<br />
FHWA 8 93421 CO CO Contr $100,000 2013 4BG7 Local Match Spot Safety 002 Local Match 2 A1082<br />
FHWA 8 93421 CO CO Engr $90,000 2013 4HJ7 Federal Spot Safety LS3E HSIP - HWY SAFETY IMPR 2 A1082<br />
FHWA 8 93421 CO CO Engr $10,000 2013 4BC7 State Spot Safety 002 State Funds (S,O) 2 A1082<br />
FHWA 8 93513<br />
H<strong>AM</strong> CR 614 0.87<br />
Northland Blvd<br />
H<strong>AM</strong><br />
Streetscape improvements including new identification signage<br />
via feature poles at key locations, vehicular directional signage, Northland Blvd: from Waycross Road to<br />
FOREST PARK<br />
landscaping improvements within existing medians, up-lighting, Springfield Pike (SR-4)<br />
installation <strong>of</strong> pavers within landscaped medians, addition <strong>of</strong> a<br />
OKI CO CO Contr $681,840 $0 $937,500 $0 $937,500 2015 4TC7 Federal Landscaping L22E STP ENHANCEMENT 1 New Project/Phase added project OKI TIP Amendment # 9 A1083<br />
FHWA 8 93513 CO CO Contr $170,460 2015 4BG7 Local Match Landscaping 002 Local Match 1 A1083<br />
FHWA 8 93513 CO CO Engr $68,160 2015 LABR Federal Landscaping L22E STP ENHANCEMENT 1 A1083<br />
FHWA 8 93513 CO CO Engr $17,040 2015 LABR Local Match Landscaping 002 Local Match 1 A1083<br />
FHWA 8 93532<br />
GRE Sugarcreek SRTS 12<br />
Feedwire<br />
GRE<br />
Extend existing path from Intermediate School south to existing<br />
path by water tower on east side <strong>of</strong> Upper Bellbrook Road to Upper Bellbrook Rd. from existing path<br />
connect to school sidewalk; Extend path (current SRTS Infra. to School. Feedwire Rd. from existing District 8 Planning<br />
Proj.) from Middle School drive to Eden Meadows Way on south path to Eden Meadows Way<br />
side <strong>of</strong> F<br />
MVRPC PE Dtl Dsgn $10,000 $0 $49,000 $0 $460,000 2013 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase added PE Phase MVRPC TIP Amendment # 11 A1084<br />
FHWA 8 93532 PE Env PE $39,000 2013 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE A1084<br />
FHWA 8 93532<br />
GRE Sugarcreek SRTS 12<br />
Feedwire<br />
Extend existing path from Intermediate School south to existing<br />
path by water tower on east side <strong>of</strong> Upper Bellbrook Road to Upper Bellbrook Rd. from existing path<br />
GRE connect to school sidewalk; Extend path (current SRTS Infra. to School. Feedwire Rd. from existing District 8 Planning MVRPC RW Acquis $50,000 $0 $0 $0 $460,000 2015 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase Added RW phase MVRPC TIP Amendment # 11 A1084<br />
Proj.) from Middle School drive to Eden Meadows Way on south path to Eden Meadows Way<br />
side <strong>of</strong> F<br />
FHWA 9 13234 SCI SR 73 1.10 SCI<br />
REPLACE THE EXISTING DEFICIENT STRUCTURE NO 7302193<br />
WITH A NEW STRUCTURE AND ANY NECESSARY APPROACH<br />
WORK. BRIDGE SPANS RARDEN CREEK.<br />
.01 MI. W OF RARDEN WCL PT. 1 DISTRICT 9 PRODUCTION CO CO Contr $868,800 $0 $1,194,600 $154,039 $1,355,639 2014 4PF7 Federal Bridge Replacement Q250 STP Rural 110% 91 RS Allocation Revised Funding Cost Increase Above Threshold A1085<br />
FHWA 9 13234 CO CO Contr $217,200 2014 4PS7 State Bridge Replacement 002 State Funds (S,O) A1085<br />
FHWA 9 13234 CO CO Engr $86,880 2014 LABR Federal Bridge Replacement Q250 STP Rural 110% 91 RS Allocation A1085<br />
FHWA 9 13234 CO CO Engr $21,720 2014 LABR State Bridge Replacement 002 State Funds (S,O) A1085<br />
FHWA 9 19415<br />
SCI SR 823 6.67<br />
PortsByPass Ph 1<br />
SCI<br />
It is proposed to construct a new 4-lane limited access<br />
Intersection <strong>of</strong> Lucasville-Minford Rd &<br />
highway/bypass <strong>of</strong> Portsmouth, <strong>Ohio</strong>. Phase 1 shall be<br />
Flowers-Ison east to SR335 &<br />
constructed from the TR 234 (Shumway Hollow Road)<br />
DISTRICT 9 PRODUCTION<br />
terminating in the vicinity <strong>of</strong> the Scioto<br />
interchange near the Scioto County Airport, to an interchange at<br />
County Airport.<br />
CR 28 (Lucasville-Minford Road)<br />
PE Dtl Dsgn $5,088,000 $28,925,019 $36,648,818 $37,189,337 $129,010,895 2013 4D27 Federal Bypass H980 APPALACHIAN HWYS DEV 4 New Project/Phase New Project A1086<br />
FHWA 9 19415 PE Dtl Dsgn $1,272,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $320,000 2013 4D27 Federal Bypass H980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $160,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $80,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $40,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $32,000 2013 4D27 Federal Bypass H980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 PE Dtl Dsgn $8,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415<br />
SCI SR 823 6.67<br />
PortsByPass Ph 1<br />
SCI<br />
It is proposed to construct a new 4-lane limited access<br />
Intersection <strong>of</strong> Lucasville-Minford Rd &<br />
highway/bypass <strong>of</strong> Portsmouth, <strong>Ohio</strong>. Phase 1 shall be<br />
Flowers-Ison east to SR335 &<br />
constructed from the TR 234 (Shumway Hollow Road)<br />
DISTRICT 9 PRODUCTION<br />
terminating in the vicinity <strong>of</strong> the Scioto<br />
interchange near the Scioto County Airport, to an interchange at<br />
County Airport.<br />
CR 28 (Lucasville-Minford Road)<br />
RW Acquis $2,160,000 $8,252,318 $0 $37,189,337 $129,010,895 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 New Project/Phase New Project A1086<br />
FHWA 9 19415 RW Acquis $720,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW Acquis $560,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW Acquis $540,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Acquis $500,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Acquis $180,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Acquis $140,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW RW Serv $626,120 2013 4D27 Federal Bypass H980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW RW Serv $560,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW RW Serv $320,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW RW Serv $240,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW RW Serv $156,530 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW RW Serv $140,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW RW Serv $116,800 2013 4D27 Federal Bypass H980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW RW Serv $80,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW RW Serv $60,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW RW Serv $29,200 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Utl Remb $680,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW Utl Remb $320,000 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW Utl Remb $170,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Utl Remb $155,030 2013 4D27 Federal Bypass L980 APPALACHIAN HWYS DEV 4 A1086<br />
FHWA 9 19415 RW Utl Remb $80,000 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 19415 RW Utl Remb $38,757 2013 4BD7 State Bypass 002 State Funds (S,O) 4 A1086<br />
FHWA 9 23023 JAC SR 139 12.28 JAC<br />
FHWA 9 75923<br />
LAW Chesapeake Bypass<br />
Phase 2<br />
LAW<br />
IT IS PROPOSED TO REPLACE EXISTING DEF- CIENT STRUCTURE<br />
NO. 4002822 OVER BRANCH OF MACDOWELL'S RUN WITH A<br />
NEW STRUCTURE AND ANY NECESSARY APPROACH WORK.<br />
Phase 2. Purchase Right-Of-Way and Construct the East bound<br />
lanes <strong>of</strong> the proposed Chesapeake Bypass (SR7) from the<br />
interchange <strong>of</strong> SR7 and SR527 eastward to it's intersection with<br />
SR775. Project length is 5.2 miles, has 11 bridges. DEMO Id's<br />
0.13 MI NE OF TR274 DISTRICT 9 PRODUCTION RW Acquis $2,500 $17,000 $19,500 $17,000 $425,300 2013 4PS7 State Bridge Replacement 002 State Funds (S,O) Revised Funding Cost Increase Above Threshold A1087<br />
From the Interchange <strong>of</strong> SR7 and SR527<br />
east to it's intersection with SR775.<br />
ODOT SPONSORING AGENCY KYOVA RW Acquis $1,458,148 $247,500 $22,179,619 $4,765,900 $182,899,019 2013 4R77 Federal Bypass HY10 Hi Priority Projects Sec 1702 "House"5 New Project/Phase New Project A1088<br />
OH131, OH232,<br />
FHWA 9 75923 RW Acquis $912,200 2013 4R47 Federal Bypass H660 SECTION 117 DEMO ID PROJECTS 5 A1088<br />
FHWA 9 75923 RW Acquis $735,000 2013 4R77 Federal Bypass LY90 Sction 129 STP 5 A1088<br />
FHWA 9 75923 RW Acquis $660,253 2013 4R57 Federal Bypass L680 TCSP 5 A1088<br />
FHWA 9 75923 RW Acquis $444,600 2013 4R57 Federal Bypass L680 TCSP 5 A1088<br />
FHWA 9 75923 RW Acquis $165,063 2013 4BD7 State Bypass 002 State Funds (S,O) 5 A1088<br />
FHWA 9 75923 RW Acquis $111,150 2013 4BD7 State Bypass 002 State Funds (S,O) 5 A1088<br />
FHWA 9 75923 RW Acquis $70,210 2013 4R47 Federal Bypass H660 SECTION 117 DEMO ID PROJECTS 5 A1088<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 18 <strong>of</strong> 25
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
To maintain and preserve the existing pavement by making the<br />
necessary repairs & by overlaing the existing pavement with<br />
asphalt concrete.<br />
Begin 0.29 miles east <strong>of</strong> SR104, heading<br />
east for 7.04 miles, and ending 0.47<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 9 76457 PIK SR 32 13.43 PIK<br />
ODOT SPONSORING AGENCY CO CO Contr $256,000 $3,669,696 $3,994,550 $3,669,696 $3,995,550 2013 4DP7 Federal Pass-Thru Minor Rehabilitation - Pavement Prmy Sys 7 Revised Funding Cost Increase Above Threshold A1089<br />
miles east <strong>of</strong> SR220.<br />
FHWA 9 76457 CO CO Engr $25,600 2013 4DP7 Federal Pass-Thru Minor Rehabilitation - Pavement Prmy Sys 7 A1089<br />
FHWA 9 76457 CO CO Mtrls $34,603 2012 4RI7 Federal Minor Rehabilitation - Pavement Prmy Sys L56E RESEARCH 7 A1089<br />
FHWA 9 76457 CO CO Mtrls $8,651 2012 4RH7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 7 A1089<br />
FHWA 9 79221<br />
PIK SR 220 6.98<br />
WaverlyConnector<br />
PIK<br />
Construct a new segment <strong>of</strong> SR 220 roadway along the south<br />
west side <strong>of</strong> the City <strong>of</strong> Waverly within the City limits. This<br />
roadway will connect US23 south <strong>of</strong> the City, intersect with SR<br />
104 and tie back into existing SR220 West <strong>of</strong> the City. The<br />
existing SR 2<br />
Begin @ intersection US23 and current<br />
east-west road between US23 & Second<br />
WAVERLY<br />
St, proceed NW intersecting w/SR104 &<br />
terminate @ SR220<br />
RW RW Serv $81,000 $0 $926,569 $1,051,916 $15,313,233 2012 4R47 Federal New Construction HY10 Hi Priority Projects Sec 1702 "House" Revised Funding Cost Increase Above Threshold A1090<br />
FHWA 9 79974 ROS US 35 10.20 ROS D09 Preventive Maintenance 4 Lane FY2013<br />
D09 Preventive Maintenance 4 Lane<br />
FY2013<br />
ODOT SPONSORING AGENCY CO CO Contr $634,608 $0 $1,044,704 $0 $1,045,704 2013 4PF7 Federal Preventive Maintenance L05E NATIONAL HIGHWAY SYSTEM 4 Revised Funding Cost Increase Above Threshold A1091<br />
FHWA 9 79974 CO CO Contr $158,652 2013 4PS7 State Preventive Maintenance 002 State Funds (S,O) 4 A1091<br />
FHWA 9 79974 CO CO Contr $125,177 2013 4PF7 Federal Preventive Maintenance L05E NATIONAL HIGHWAY SYSTEM 4 A1091<br />
FHWA 9 79974 CO CO Contr $31,294 2013 4PS7 State Preventive Maintenance 002 State Funds (S,O) 4 A1091<br />
FHWA 9 79974 CO CO Engr $63,461 2013 LABR Federal Preventive Maintenance L05E NATIONAL HIGHWAY SYSTEM 4 A1091<br />
FHWA 9 79974 CO CO Engr $15,865 2013 LABR State Preventive Maintenance 002 State Funds (S,O) 4 A1091<br />
FHWA 9 79974 CO CO Engr $12,518 2013 LABR Federal Preventive Maintenance L05E NATIONAL HIGHWAY SYSTEM 4 A1091<br />
FHWA 9 79974 CO CO Engr $3,129 2013 LABR State Preventive Maintenance 002 State Funds (S,O) 4 A1091<br />
FHWA 9 83083<br />
D09 Preventive Maint 2<br />
Lane 2013<br />
D09 Preventive Maintenance PID for 2013. 2 Lane PM, 2013 ODOT SPONSORING AGENCY CO CO Contr $553,726 $0 $832,042 $0 $833,042 2013 4PF7 Federal Preventive Maintenance L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 9 85678<br />
HIG CR 5/ CR 74 / T192<br />
Intersect<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
HIG<br />
It is proposed to improve the intersection <strong>of</strong> CR5 (Prospect Rd),<br />
CR74B (Pleasant Rd), & TR192A (Main Rd) by vertical pr<strong>of</strong>ile<br />
adjustments at the intersection to meet 55 mph design<br />
standards and intersection and vertical sight distance standards.<br />
Marshal Twp, 1.23 mile east <strong>of</strong> SR125,<br />
intersections <strong>of</strong> CR5, CR74B, & T192A.<br />
HIGHLAND COUNTY ENGINEER CO CO Contr $539,786 $0 $742,206 $45,983 $789,189 2014 4HB7 Federal Intersection Improvement LS30 HIGHWAY SAFETY IMP PROG 1 Revised Funding Cost Increase Above Threshold A1101<br />
FHWA 9 85678 CO CO Contr $134,947 2014 4BG7 Local Match Intersection Improvement 002 Local Match 1 A1101<br />
FHWA 9 85678 CO CO Engr $53,979 2014 LABR Federal Intersection Improvement LS30 HIGHWAY SAFETY IMP PROG 1 A1101<br />
FHWA 9 85678 CO CO Engr $13,495 2014 LABR Local Match Intersection Improvement 002 Local Match 1 A1101<br />
FHWA 9 85825 LAW Ironton Traffic Imp. LAW<br />
It is proposed to improve efficiency <strong>of</strong> major intersections,<br />
signalization system, turn lanes, and parking based on a<br />
comprehensive traffic flow study completed in Ironton. The<br />
proposed project will include signalization equipment<br />
replacement and upgrade<br />
LAW Ironton Traffic Improvements Ironton, City <strong>of</strong> KYOVA CO CO Contr $1,500,000 $0 $1,635,000 $120,000 $1,761,955 2013 4TB7 Federal Signals L40E CMAQ Revised Funding Cost Increase Above Threshold A1102<br />
FHWA 9 85825 CO CO Engr $135,000 2013 4TB7 Federal Signals L40E CMAQ A1102<br />
FHWA 9 86580<br />
BRO SR 505 7.25 Brdg<br />
Replacement<br />
BRO<br />
It is proposed to replace the deficiant structure with a precast<br />
concrete box.<br />
On SR505, 0.5 mile north <strong>of</strong> its<br />
intersection with SR756.<br />
ODOT SPONSORING AGENCY RW Acquis $4,000 $0 $5,000 $0 $308,500 2013 4PF7 Federal Bridge Replacement L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 9 89132<br />
ADA SR 73 13.06 Jaybird<br />
Rd<br />
ADA<br />
It is proposed to re-align the intersection <strong>of</strong> CR18H (Jaybird<br />
Road) & SR73 and widen SR73 by adding a left turn lane on the<br />
north west side thus increasing the saftey factor when turning<br />
into Jaybird Road.<br />
On SR73, begin project 2.73 miles south<br />
east <strong>of</strong> its intersection with SR32.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
Adams County Commissioners CO CO Mtrls $35,000 $752,873 $787,873 $783,113 $819,113 2012 4JC7 State Intersection Improvement 002 Local Match 0 Revised Funding Cost Increase Above Threshold A1124<br />
FHWA 9 91927 LAW SR 243 17.83 LAW It is proposed to replace the culvert as SLM 17.83.<br />
On SR 243, project is at SLM 17.83,<br />
which is 0.25 mile south west <strong>of</strong> its<br />
interseciton with SR 7.<br />
ODOT SPONSORING AGENCY CO CO Contr $400,000 $0 $935,000 $0 $936,000 2014 4PF7 Federal Culvert Construction/Reconstr/Repair L20E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
FHWA 10 93596<br />
WAS Training Annex<br />
Building<br />
WAS<br />
Construct multipurpose/training facility (building) on D10<br />
campus. Design to be performed under C.O. Task Order for<br />
Engineering Services.<br />
Begin at D10 HQ at the corner <strong>of</strong><br />
Muskingum Dr and Davis Ave in City <strong>of</strong><br />
Marietta.<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
ODOT SPONSORING AGENCY CO CO Contr $125,000 $0 $132,500 $0 $132,500 2013 4MA7 State Buildings - Mix Shed,etc. 002 State Funds (S,O) New Project/Phase $125,000 for Information only A1138<br />
FHWA 10 93596 CO CO Engr $7,500 2013 LABR State Buildings - Mix Shed,etc. 002 State Funds (S,O) A1138<br />
FHWA 10 93623 MEG US 33 3.090 MEG<br />
Improve 2 to 4 lane transition area(s). MEG US 33 3.09-3.23 and Begin 0.12 mi. W <strong>of</strong> intersection (ramp)<br />
ODOT SPONSORING AGENCY<br />
14.15-14.27.<br />
to SR 681.<br />
CO CO Contr $360,000 $0 $416,000 $0 $416,000 2014 4HJ7 Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 0 New Project/Phase $400,000 n/a A1139<br />
FHWA 10 93623 CO CO Contr $40,000 2014 4BC7 State Section Improvement 002 State Funds (S,O) 0 A1139<br />
FHWA 10 93623 CO CO Engr $14,400 2014 LABR Federal Section Improvement LS3E HSIP - HWY SAFETY IMPR 0 A1139<br />
FHWA 10 93623 CO CO Engr $1,600 2014 LABR State Section Improvement 002 State Funds (S,O) 0 A1139<br />
FHWA 10 93624 ATH US 33 20.52 ATH<br />
Lengthen turn lanes along US 33 Super 2. Ath US 33 20.52-<br />
20.70, 23.16-23.34 and 26.19-26.37, all segments LT and RT.<br />
Begin 0.12 mi. W <strong>of</strong> CR 21 (Pleasant<br />
Ridge Rd).<br />
ODOT SPONSORING AGENCY CO CO Contr $800,000 $0 $1,040,000 $0 $1,040,000 2015 4PS7 State Section Improvement 1 New Project/Phase $1,000,000 n/a A1140<br />
FHWA 10 93624 CO CO Contr $200,000 2015 4PS7 State Section Improvement 002 State Funds (S,O) 1 A1140<br />
FHWA 10 93624 CO CO Engr $32,000 2015 4PS7 State Section Improvement 1 A1140<br />
FHWA 10 93624 CO CO Engr $8,000 2015 4PS7 State Section Improvement 002 State Funds (S,O) 1 A1140<br />
FHWA 10 93654<br />
ATH Richland Ave<br />
Corridor Rehab<br />
ATH<br />
Corridor upgrade to replace sidewalk, curb and drainage.<br />
Consolidate drives and widen for bike lanes.<br />
Begin at Canterbury Drive and Richland<br />
Athens, City <strong>of</strong><br />
Avenue, south.<br />
CO CO Contr $2,870,557 $0 $3,485,379 $0 $3,485,379 2014 4BG7 Local Match Section Improvement 002 Local Match 1 New Project/Phase $500,000 100% Federal n/a A1141<br />
FHWA 10 93654 CO CO Contr $500,000 2014 4DP7 Federal Pass-Thru Section Improvement 1 A1141<br />
FHWA 10 93654 CO CO Engr $114,822 2014 LABR Local Match Section Improvement 002 Local Match 1 A1141<br />
FHWA 11 25496 TUS SR 39 13.910 TUS<br />
Urban System Paving - New Philadelphia; includes asphalt<br />
resurfacing, curb ramps, pavement marking<br />
New Philadelphia ODOT SPONSORING AGENCY CO CO Contr $1,640,943 $0 $2,345,600 $0 $2,346,600 2014 4PF7 Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 Revised Funding<br />
Cost Increase, project name change, reservior<br />
FY13 project<br />
A1142<br />
FHWA 11 25496 CO CO Contr $410,236 2014 4BG7 Local Match Resurfacing, Undivided System 002 Local Match 5 A1142<br />
FHWA 11 25496 CO CO Contr $74,419 2014 4BG7 Local Match Resurfacing, Undivided System 5 A1142<br />
FHWA 11 25496 CO CO Engr $170,048 2014 LABR Federal Resurfacing, Undivided System L240 STP FLEXIBLE 5 A1142<br />
FHWA 11 25496 CO CO Engr $42,512 2014 LABR Local Match Resurfacing, Undivided System 002 Local Match 5 A1142<br />
FHWA 11 25496 CO CO Engr $7,442 2014 LABR Local Match Resurfacing, Undivided System 5 A1142<br />
FHWA 11 76994 JEF SR0007 12.34 JEF<br />
Rehabilitate two bridges by replacing superstructure on one<br />
bridge (JEF-7-1235, SFN 4100549) and repairing concrete slope<br />
on the other bridge (JEF-7-1159, SFN 4100484).<br />
0.5 Miles North <strong>of</strong> S.R.151 DISTRICT 11-Planning BHJ CO CO Contr $1,367,612 $0 $1,880,467 $257,751 $2,139,218 2013 4PF7 Federal Bridge Repair H050 NATIONAL HWY SYST 0 CO Air Quality Exempt Revised Other Scope Change and cost increase 2012-8 A1143<br />
FHWA 11 76994 CO CO Contr $341,903 2013 4PS7 State Bridge Repair 002 State Funds (S,O) 0 CO Air Quality Exempt A1143<br />
FHWA 11 76994 CO CO Engr $136,762 2013 LABR Federal Bridge Repair H050 NATIONAL HWY SYST 0 CO Air Quality Exempt A1143<br />
FHWA 11 76994 CO CO Engr $34,190 2013 LABR State Bridge Repair 002 State Funds (S,O) 0 CO Air Quality Exempt A1143<br />
FHWA 11 80599 BEL IR 70 14.45 BEL<br />
The project will modify the interchange at IR 70, US 40 and SR<br />
331 to improve the traffic flow in the area <strong>of</strong> the SR 331 US 40 ir<br />
70 interchange. The IR 70 WB exit ramp experiences backups<br />
due the traffic go to and from the many educational and<br />
governmen<br />
BEL 70/40/331 Interchange DISTRICT 11-Planning BOM CO CO Contr $5,561,540 $0 $13,212,240 $974,251 $16,227,491 2015 4R47 Federal Interchange, Reconstruction HY10 Hi Priority Projects Sec 1702 "House"1 CO Air Quality Exempt New Project/Phase New Phase Added 03/15/12 A1144<br />
FHWA 11 80599 CO CO Contr $3,492,000 2015 4PF7 Federal Interchange, Reconstruction L01E INTERSTATE MAINTENANCE 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Contr $2,250,000 2015 4PF7 Federal Interchange, Reconstruction L1CE BRIDGE 85% ON/OFF SYSTEM 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Contr $388,000 2015 4PS7 State Interchange, Reconstruction 002 State Funds (S,O) 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Contr $250,000 2015 4PS7 State Interchange, Reconstruction 002 State Funds (S,O) 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Engr $632,700 2015 LABR Federal Interchange, Reconstruction HY10 Hi Priority Projects Sec 1702 "House"1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Engr $349,200 2015 LABR Federal Interchange, Reconstruction L01E INTERSTATE MAINTENANCE 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Engr $225,000 2015 LABR Federal Interchange, Reconstruction 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Engr $38,800 2015 LABR State Interchange, Reconstruction 002 State Funds (S,O) 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 CO CO Engr $25,000 2015 LABR State Interchange, Reconstruction 002 State Funds (S,O) 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 BEL IR 70 14.45 BEL<br />
The project will modify the interchange at IR 70, US 40 and SR<br />
331 to improve the traffic flow in the area <strong>of</strong> the SR 331 US 40 ir<br />
70 interchange. The IR 70 WB exit ramp experiences backups<br />
due the traffic go to and from the many educational and<br />
governmen<br />
BEL 70/40/331 Interchange DISTRICT 11-Planning BOM PE Dtl Dsgn $840,000 $957,470 $0 $974,251 $16,227,491 2012 4R47 Federal Interchange, Reconstruction HY10 Hi Priority Projects Sec 1702 "House"1 CO Air Quality Exempt New Project/Phase New Phase Added 03/15/12 A1144<br />
FHWA 11 80599 PE Dtl Dsgn $360,000 2012 4PF7 Federal Interchange, Reconstruction L01E INTERSTATE MAINTENANCE 1 CO Air Quality Exempt A1144<br />
FHWA 11 80599 PE Dtl Dsgn $40,000 2012 4PS7 State Interchange, Reconstruction 002 State Funds (S,O) 1 CO Air Quality Exempt A1144<br />
FHWA 11 81314 JEF SR 7 17.610 JEF<br />
FHWA 11 81486 BEL SR 7 11.870 BEL<br />
Improve the intersection <strong>of</strong> SR 7 and University Blvd in the City<br />
<strong>of</strong> Steubenville to relieve the anticipated congestion to the<br />
Veterans Memorial Bridge once the Fort Steuben and Market<br />
Street Bridges are taken out <strong>of</strong> service.<br />
Priority System minor rehabilation <strong>of</strong> existing concrete<br />
pavement: minimal joint repair, overlay with asphalt, replace<br />
median barrier, replace guardrail. The project will also include<br />
concrete overlays on bridges within the project limits.<br />
At the intersection <strong>of</strong> University Blvd<br />
and SR 7 in Jefferson County<br />
0.35 mi. N <strong>of</strong> CR 7 to 0.34 mi. S <strong>of</strong> SR<br />
147<br />
DISTRICT 11-Planning BHJ PE Dtl Dsgn $835,000 $366,834 $1,201,834 $366,834 $11,211,834 2012 4TB7 Federal Intersection Improvement L400 CMAQ 0 New Project/Phase new phase 2012-8 A1145<br />
DISTRICT 11-Planning BOM CO CO Contr $3,908,098 $0 $5,508,546 $0 $6,244,529 2013 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 2 CO Air Quality Exempt Revised Funding Cost Increase Above Threshold 03/15/12 A1146<br />
FHWA 11 81486 CO CO Contr $977,025 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 CO CO Engr $390,810 2013 LABR Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 CO CO Engr $97,702 2013 LABR State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 CO RR Remb $107,929 2013 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 CO RR Remb $26,982 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 BEL SR 7 11.870 BEL<br />
Priority System minor rehabilation <strong>of</strong> existing concrete<br />
pavement: minimal joint repair, overlay with asphalt, replace<br />
median barrier, replace guardrail. The project will also include<br />
concrete overlays on bridges within the project limits.<br />
0.35 mi. N <strong>of</strong> CR 7 to 0.34 mi. S <strong>of</strong> SR<br />
147<br />
DISTRICT 11-Planning BOM PE Dtl Dsgn $585,586 $0 $0 $0 $6,244,529 2013 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 2 CO Air Quality Exempt New Project/Phase New funding phase added 03/15/12 A1146<br />
FHWA 11 81486 PE Dtl Dsgn $146,397 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 2 CO Air Quality Exempt A1146<br />
FHWA 11 81486 PE PE Engr $3,000 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 2 CO Air Quality Exempt A1146<br />
FHWA 11 81670 HAS US 250 4.220 HAS<br />
General System - minor rehab.:plane 1 1/2 in.; rsurface with 3<br />
in. <strong>of</strong> asphalt, minimal full depth mainline repairs and repair <strong>of</strong><br />
approx. 25% <strong>of</strong> shoulder area<br />
TUS Co. Line to 0.08 mi. E <strong>of</strong> TR 235<br />
(Mizer)<br />
DISTRICT 11-Planning CO CO Contr $2,546,255 $0 $3,503,301 $0 $3,564,301 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L050 NATIONAL HWY SYST 8 Revised Funding Cost Increase Above Threshold none A1147<br />
FHWA 11 81670 CO CO Contr $636,564 2013 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 8 A1147<br />
FHWA 11 81670 CO CO Contr $2,000 2013 4PS7 State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 8 A1147<br />
FHWA 11 81670 CO CO Engr $254,626 2013 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys L050 NATIONAL HWY SYST 8 A1147<br />
FHWA 11 81670 CO CO Engr $63,656 2013 LABR State Minor Rehabilitation - Pavement Gnrl Sys 002 State Funds (S,O) 8 A1147<br />
FHWA 11 81725 TUS IR 77 20.730 TUS priority System - Minor Rehab. US 250 to 0.01 mi. S <strong>of</strong> CR 80 DISTRICT 11-Planning CO CO Contr $5,554,156 $0 $7,924,973 $0 $7,925,973 2013 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L01E INTERSTATE MAINTENANCE 8 Revised Funding Cost Increase, added section none A1148<br />
FHWA 11 81725 CO CO Contr $825,790 2013 4PF7 Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 8 A1148<br />
FHWA 11 81725 CO CO Contr $617,128 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 8 A1148<br />
FHWA 11 81725 CO CO Contr $206,448 2013 4PS7 State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 8 A1148<br />
FHWA 11 81725 CO CO Engr $555,415 2013 LABR Federal Minor Rehabilitation - Pavement Prmy Sys L01E INTERSTATE MAINTENANCE 8 A1148<br />
FHWA 11 81725 CO CO Engr $82,578 2013 LABR Federal Minor Rehabilitation - Pavement Prmy Sys L05E NATIONAL HIGHWAY SYSTEM 8 A1148<br />
FHWA 11 81725 CO CO Engr $61,713 2013 LABR State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 8 A1148<br />
FHWA 11 81725 CO CO Engr $20,645 2013 LABR State Minor Rehabilitation - Pavement Prmy Sys 002 State Funds (S,O) 8 A1148<br />
FHWA 11 83993 COL SR 39 7.190 COL<br />
General System Minor Rehab.; includes asphalt overlay,<br />
pavement repairs, pavement marking<br />
0.01 mi. E. <strong>of</strong> CR418 to SR7 DISTRICT 11-Planning CO CO Contr $1,167,305 $0 $1,707,129 $0 $1,877,717 2013 4PF7 Federal Minor Rehabilitation - Pavement Gnrl Sys L250 STP Rural
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 11 83993 CO CO Engr $116,730 2013 LABR Federal Minor Rehabilitation - Pavement Gnrl Sys L250 STP Rural
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
FHWA 11 92354 COL SR 39 0.930 COL<br />
FY2015 GSMP project. Tier 4 rockfall site. Lay slope back and<br />
install D50 wall. In the village <strong>of</strong> Salineville. NOTE: This project<br />
0.07 miles West <strong>of</strong> State St.<br />
will be combined with PID 92353 under a single design contract,<br />
but sold separately.<br />
DISTRICT 11-Planning CO CO Contr $696,000 $0 $950,000 $0 $982,000 2015 4SF7 Federal Slide Repair 0 New Project/Phase new project none A1162<br />
FHWA 11 92354 CO CO Contr $174,000 2015 4SS7 State Slide Repair 0 A1162<br />
FHWA 11 92354 CO CO Engr $64,000 2015 LABR Federal Slide Repair 0 A1162<br />
FHWA 11 92354 CO CO Engr $16,000 2015 LABR State Slide Repair 002 State Funds (S,O) 0 A1162<br />
FHWA 11 92354 COL SR 39 0.930 COL<br />
FY2015 GSMP project. Tier 4 rockfall site. Lay slope back and<br />
install D50 wall. In the village <strong>of</strong> Salineville. NOTE: This project<br />
0.07 miles West <strong>of</strong> State St.<br />
will be combined with PID 92353 under a single design contract,<br />
but sold separately.<br />
DISTRICT 11-Planning RW Acquis $24,000 $0 $0 $0 $982,000 2013 4SF7 Federal Slide Repair L25E STP RURAL
2012-2015 <strong>STIP</strong> Amendment #7 (FHWA)<br />
FHWA/<br />
FTA Dist PID Project Name (ie CRS) Cnty Project Description Project Termini Sponsoring Agency MPO Ph Subphase Estimate Encumbered<br />
By Phase By Project<br />
Enc'd/<br />
Estimate<br />
Total<br />
Encumbered<br />
Enc'd/<br />
Estimate<br />
Total<br />
SFY SAC<br />
Fund Type<br />
(F, S, B, O)<br />
Primary Work Category<br />
Oblig.<br />
Obligation Description<br />
Code<br />
SLM<br />
Air Quality Status ALI - Qty XXX Entry Type <strong>STIP</strong> Comment Resolution Number <strong>STIP</strong> ID<br />
Miles<br />
Construction <strong>of</strong> Pedestrian Bridge at Legend Elementary School<br />
over Log Pond Run. Construction <strong>of</strong> sidewalks at various Construction <strong>of</strong> Pedestrian bridge over<br />
FHWA 5 93575 LIC Newark SRTS LIC locations around Heritage and Wilson Middle Schools.Non- Log Pond Run and various sidewalk Newark, City <strong>of</strong> LCATS PE Env PE $45,500 $0 $55,000 $0 $479,099 2013 4SC7 Federal New Bridge LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New Project Resolution 7/3/12 A1174<br />
Infrastructure funding for Education-Encouragement-<br />
Enforcement-total $16,000<br />
improvement at various locations<br />
FHWA 5 93575 LCATS PE Dtl Dsgn $9,500 2014 4SC7 Federal New Bridge LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE Resolution 7/3/12 A1174<br />
FHWA 5 93580 KNO Fredericktown SRTS KNO<br />
Construction <strong>of</strong> sidewalks and pedestrian cross around school<br />
and various city streets.<br />
Addition <strong>of</strong> Sidewalks along various city<br />
Fredericktown, Village <strong>of</strong><br />
streets<br />
PE Env PE $44,000 $0 $50,000 $0 $505,000 2013 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE New Project/Phase New Project A0930<br />
FHWA 5 93580 PE Dtl Dsgn $6,000 2014 4SC7 Federal Add Sidewalks LU2E SAFE ROUTE TO SCHOOL INFRASTRUCTURE A0930<br />
FHWA 3 89506 HUR US 0020 6.83 HUR Resurfacing- Village <strong>of</strong> Monroeville HUR 20 6.83-8.56 HUR 20 6.83-8.56 District 3, Production CO CO Contr $1,188,576 $0 $0 $1,629,717 2013 4PF7 Federal Resurfacing L05E District Preservation Revised Funding A1175<br />
FHWA 3 89506 CO Contr $297,144 2013 4PS7 State Resurfacing 002 District Preservation A1175<br />
FHWA 3 89506 CO Eng $115,198 2013 LABR Federal Resurfacing L05E District Preservation A1175<br />
FHWA 3 89506 CO Eng $28,799 2013 LABR State Resurfacing 002 District Preservation A1175<br />
Repair deteriorated bridge by replacing the existing box beams,<br />
minor repairs to the existing abutments and wingwalls,<br />
installation <strong>of</strong> guardrail, and a new wearing surface. Design<br />
Grange Hall Road (CR 25) from<br />
Patterson Road to 200' North <strong>of</strong><br />
Industrial Lane.<br />
FHWA 8 91685<br />
GRE CR25 2.48 Des-Build<br />
GRE<br />
Beavercreek MVRPC CO CO Contr $265,040 $400,900 2013 4R87 Federal Bridge Deck Replacement L11E Preservation New Project New Project Amendment #5 A1176<br />
Br Rehab<br />
Build project.<br />
FHWA 8 91685 $66,260 2013 LNTP State Bridge Deck Replacement LNTP Preservation A1176<br />
FHWA 8 91685 $26,504 2013 4R87 Federal Bridge Deck Replacement L11E Preservation A1176<br />
FHWA 8 91685 $6,626 2013 LTNP State Bridge Deck Replacement LNTP Preservation A1176<br />
C:\Users\kgoodwin\Desktop\2012-2015 <strong>STIP</strong> <strong>AM</strong> 7 approved 7-12-12.xlsx Page: 25 <strong>of</strong> 25