RIVER GREEN<br />

basin), as depicted Exhibit C <strong>attached</strong> hereto and incorporated herein by this reference (“River<br />

Green Easement Area”). This easement includes as a material part thereof, an easement to tie<br />

into and use such drainage infrastructure as may exist from time to time upon the School Parcel<br />

within the River Green Easement Area, and the right to construct and maintain drainage<br />

infrastructure as may be necessary for use of the easement pursuant to the grant set forth herein.<br />

If, by Chatham-Wieland tying into the drainage infrastructure on the School Parcel, the size or<br />

capacity of the drainage infrastructure installed by the School must be increased, then<br />

Chatham-Wieland shall bear all costs for the required increase in the size or capacity of the<br />

drainage infrastructure.<br />

(b) Chatham-Wieland hereby declares, establishes, creates and grants to the School,<br />

for the benefit of and as an appurtenance to the School Parcel and as a burden upon River Green<br />

Parcel A-2, a non-exclusive permanent easement for surface and storm water flow and drainage<br />

from that portion of the School Parcel draining into that portion of the creek basin owned by<br />

Chatham-Wieland (including without limitation the surface and storm water drainage originating<br />

from River Green Parcel A-1) upon, over, across and through those portions of River Green<br />

Parcel A-2 as described on Exhibit C (“School Easement Area”). This easement includes as a<br />

material part thereof, an easement to tie into and use such drainage infrastructure as may exist<br />

from time to time upon River Green Parcel A-2. If, by the School tying into the drainage<br />

infrastructure on River Green Parcel A-2, the size or capacity of the drainage infrastructure<br />

installed by Chatham-Wieland must be increased, then the School shall bear all costs for<br />

required increase in the size or capacity of the drainage infrastructure. Use of the School<br />

Easement Area shall be in keeping with the USACE Declaration.<br />

(c) The School Easement Area and the River Green Easement Area are sometimes<br />

individually referred to as an “Easement Area”, and collectively as “Easement Areas”.<br />

3. Construction.<br />

(a) Prior to any construction on an Easement Area to permit use of the easements, the<br />

grantee of the easement shall provide to the grantor of the easement a copy of the plans for<br />

construction of the drainage infrastructure in the Easement Area. The plans of each Party shall<br />

be subject to the approval of the other Party, such approval not to be unreasonably withheld or<br />

delayed. The grantee of the easement shall perform all construction in a good and workmanlike<br />

manner, and shall exercise due diligence in completing construction. During construction, the<br />

grantee of the easement shall coordinate entry onto the Parcel of the other Party, and shall avoid<br />

disruption of the use of the Parcel by the owner of that Parcel. Each Party shall be responsible<br />

for its own costs of construction.<br />

(b) After construction, the Party performing the construction agrees to restore the<br />

construction area and Easement Area so that the areas thereby affected will be left in good and<br />

sightly condition. The Party performing the construction further agrees to repair and replace as<br />

necessary any improvements damaged by the installation of drainage infrastructure, including repaving<br />

or re-landscaping, as necessary to restore the construction area.<br />

4. Maintenance. Any required maintenance of drainage infrastructure shall be<br />

performed by the Party benefitting from the easements to which the drainage infrastructure is<br />

AT:207968v6 - 3 -