16.01.2013 Views

Fire Stop Systems Brochure SA727 - USG Corporation

Fire Stop Systems Brochure SA727 - USG Corporation

Fire Stop Systems Brochure SA727 - USG Corporation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Fire</strong> Tests UL System Test Criteria Description<br />

Fluted Steel Deck Assembly F-A-1020a 4<br />

4<br />

2<br />

Fluted Steel Deck Assembly F-A-5014 a<br />

4B<br />

A<br />

Section A–A<br />

3<br />

4B<br />

3<br />

2<br />

A<br />

2<br />

3<br />

4<br />

A<br />

Section A–A<br />

A<br />

1<br />

2<br />

4A<br />

1<br />

21 <strong>USG</strong> <strong>Fire</strong> <strong>Stop</strong> <strong>Systems</strong><br />

F-Rating<br />

3 Hr.<br />

T-Rating<br />

0 Hr.<br />

F-Rating<br />

3 Hr.<br />

T-Rating<br />

1 Hr.<br />

1. 2� steel fluted deck, minimum 3-1/2� thickness concrete topping.<br />

The annular space range shall be minimum 1/4� to maximum 1-5/8�<br />

for this firestop system.<br />

2. Metallic pipe:<br />

A Steel pipe:<br />

8� diameter (or smaller) Schedule 40 (or heavier) steel.<br />

B Iron pipe:<br />

8� diameter (or smaller) cast or ductile iron.<br />

C Copper pipe:<br />

4� diameter (or smaller) regular (or heavier) copper.<br />

D Copper tubing:<br />

4� diameter (or smaller) Type L (or heavier) copper tubing.<br />

E Conduit:<br />

4� diameter (or smaller) steel conduit or EMT.<br />

3. Forming material:<br />

Minimum 4� thick mineral wool insulation b (minimum 4.0 pcf) firmly<br />

packed into the opening as a permanent form.<br />

4. Type A:<br />

Minimum 1/2� thick sealant applied within the opening, flush with<br />

the top surface of the floor.<br />

1. Steel fluted deck, minimum 3-1/2� thickness concrete topping.<br />

The annular space shall be minimum 1/4� to maximum 5/8� within<br />

the firestop system.<br />

2. Metallic pipe:<br />

A Steel pipe:<br />

8� diameter (or smaller) Schedule 40 (or heavier) steel.<br />

B Iron pipe:<br />

8� diameter (or smaller) cast or ductile iron.<br />

C Copper pipe:<br />

4� diameter (or smaller) regular (or heavier) copper.<br />

D Copper tubing:<br />

4� diameter (or smaller) Type L (or heavier) copper tubing.<br />

3. Pipe covering:<br />

Nominal 1� thick (or less) glass fiber insulation.<br />

4A Forming material:<br />

Minimum 4� thick mineral wool insulation b (minimum 4.0 pcf) firmly<br />

packed into the opening as a permanent form.<br />

4B Type A:<br />

Minimum 1/2� thick sealant applied within opening, flush with the<br />

top surface of the floor.<br />

Note<br />

(a) Refer to the UL <strong>Fire</strong> Resistance Directory for Through-Penetration <strong>Fire</strong>stop <strong>Systems</strong><br />

or contact United States Gypsum Company for complete information. (b) Bearing the UL<br />

Classification Marking.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!